Technical ReportPDF Available

Higher Reliability and Capacity Train Control Report

Authors:
  • PxV Rail Consulting

Abstract and Figures

The report analyzes new concepts of train control systems that could potentially offset the negative impacts to train operations introduced by the current implementation of PTC (Overlay PTC). It investigates the effects on railroad network operation caused by the operation of PTC, such as the conservatism of train braking enforcement algorithms, impacts on train operation due to failure of PTC components and human operation errors, as well as the improvements provided by the proposed new train control methods.
Content may be subject to copyright.
DOT/FRA/ORD-22/30 Final Report | August 2022
Higher Reliability and Capacity Train Control
i
REPORT DOCUMENTATION PAGE Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other
aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information
Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision
of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. REPORT DATE (DD-MM-YYYY)
12/27/2019
2. REPORT TYPE
Technical Report
3. DATES COVERED (From - To)
May 2016 - Dec. 2019
4. TITLE AND SUBTITLE
Higher Reliability and Capacity Train Control
5a. CONTRACT NUMBER
DTFR5311D00008L
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S)
Paulo Vieira https://orcid.org/0000-0002-3617-9490, José Rosales-Yepez https://
orcid.org/0000-0001-6825-3010, Alan Polivka, Joseph Brosseau
5d. PROJECT NUMBER
5e. TASK NUMBER
Task Order 0032
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)
Transportation Technology Center, Inc.
55500 DOT Road
Pueblo, CO 81001
8. PERFORMING ORGANIZATION
REPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)
U.S. Department of Transportation
Federal Railroad Administration
Office of Railroad Policy and Development
Office of Research, Development, and Technology (RD&T)
Washington, DC 20590
10. SPONSOR/MONITOR'S ACRONYM(S)
11. SPONSOR/MONITOR'S REPORT
NUMBER(S)
DOT/FRA/ORD-22/30
12. DISTRIBUTION/AVAILABILITY STATEMENT
This document is available to the public through the FRA eLibrary.
13. SUPPLEMENTARY NOTES
COR: Jared Withers
14. ABSTRACT
Researchers developed new concepts of train control systems that could potentially offset the negative impacts to train
operations introduced by the current implementation of PTC (Overlay PTC). They investigated the effects on railroad
network operation caused by the operation of PTC, such as the conservatism of train braking enforcement algorithms,
impacts on train operation due to failure of PTC components and human operation errors, as well as the improvements
provided by the proposed new train control methods.
15. SUBJECT TERMS
Positive Train Control, PTC, enhanced operations, train control, rail signaling, traffic capacity improvement, reliability,
availability, maintainability, RAM
17. LIMITATION OF
ABSTRACT
18. NUMBER
OF
PAGES
160
19a. NAME OF RESPONSIBLE PERSON
Paulo Vieira
a. REPORT
Unclassified
b. ABSTRACT
Unclassified
c. THIS PAGE
Unclassifie
d
19b. TELEPHONE NUMBER (Include area code)
719-584-7159
ii
METRIC/ENGLISH CONVERSION FACTORS
ENGLISH TO METRIC
METRIC TO ENGLISH
LENGTH
(APPROXIMATE)
LENGTH
(APPROXIMATE)
1 inch (in) = 2.5 centimeters (cm) 1 millimeter (mm) =
0.04 inch (in)
1 foot (ft) = 30 centimeters (cm) 1 centimeter (cm) =
0.4 inch (in)
1 yard (yd)
=
0.9 meter (m)
1 meter (m)
=
3.3 feet (ft)
1 mile (mi)
=
1.6 kilometers (km)
1 meter (m)
=
1.1 yards (yd)
1 kilometer (km) =
0.6 mile (mi)
AREA
(APPROXIMATE)
AREA
(APPROXIMATE)
1 square inch (sq in, in2) = 6.5 square centimeters (cm2) 1 square centimeter (cm2) =
0.16 square inch (sq in, in2)
1 square foot (sq ft, ft
2
)
=
0.09 square meter (m
2
)
1 square meter (m
2
)
=
1.2 square yards (sq yd, yd
2
)
1 square yard (sq yd, yd
2
)
=
0.8 square meter (m
2
)
1 square kilometer (km
2
)
=
0.4 square mile (sq mi, mi
2
)
1 square mile (sq mi, mi2) = 2.6 square kilometers (km2) 10,000 square meters (m2) =
1 hectare (ha) = 2.5 acres
1 acre = 0.4 hectare (he) = 4,000 square meters (m2)
MASS - WEIGHT
(APPROXIMATE)
MASS - WEIGHT
(APPROXIMATE)
1 ounce (oz)
=
28 grams (gm)
1 gram (gm)
=
0.036 ounce (oz)
1 pound (lb) = 0.45 kilogram (kg) 1 kilogram (kg) =
2.2 pounds (lb)
1 short ton = 2,000 pounds (lb) = 0.9 tonne (t) 1 tonne (t)
=
=
1,000 kilograms (kg)
1.1 short tons
VOLUME
(APPROXIMATE)
VOLUME
(APPROXIMATE)
1 teaspoon (tsp) = 5 milliliters (ml) 1 milliliter (ml) =
0.03 fluid ounce (fl oz)
1 tablespoon (tbsp) = 15 milliliters (ml) 1 liter (l) =
2.1 pints (pt)
1 fluid ounce (fl oz) = 30 milliliters (ml) 1 liter (l) =
1.06 quarts (qt)
1 cup (c) = 0.24 liter (l) 1 liter (l) =
0.26 gallon (gal)
1 pint (pt)
=
0.47 liter (l)
1 quart (qt)
=
0.96 liter (l)
1 gallon (gal) = 3.8 liters (l)
1 cubic foot (cu ft, ft3) = 0.03 cubic meter (m3) 1 cubic meter (m3) =
36 cubic feet (cu ft, ft3)
1 cubic yard (cu yd, yd3) = 0.76 cubic meter (m3) 1 cubic meter (m3) =
1.3 cubic yards (cu yd, yd3)
TEMPERATURE
(EXACT)
TEMPERATURE
(EXACT)
[(x-32)(5/9)]
°
F =
y
°
C [(9/5) y + 32]
°
C
=
x
°
F
QUICK INCH - CENTIMETER LENGTH CONVERSION
1
02 3 4 5
Inches
Centimeters
0 1 3 452 6 1110987 1312
QUICK FAHRENHEIT - CELSIUS TEMPERATURE CONVERSIO
-40° -22° -4° 14° 32° 50° 68° 86° 104° 122° 140° 158° 176° 194° 212°
°F
°C -40° -30° -20° -10° 10° 20° 30° 40° 50° 60° 70° 80° 90° 100°
For more exact and or other conversion factors, see NIST Miscellaneous Publication 286, Units of Weights and
Measures. Price $2.50 SD Catalog No. C13 10286 Updated 6/17/98
iii
Contents
Executive Summary ........................................................................................................................ 1
1. Introduction ............................................................................................................................ 3
1.1 Background ................................................................................................................. 3
1.2 Objectives .................................................................................................................... 4
1.3 Overall Approach ........................................................................................................ 4
1.4 Scope ........................................................................................................................... 5
1.5 Organization of the Report .......................................................................................... 6
2. HRCTC Concepts and PTC Evolution .................................................................................. 7
2.1 Current System: Overlay PTC ..................................................................................... 7
2.2 PTC Reliability and Capacity Improvement Overview .............................................. 9
2.3 Enhanced-Overlay PTC (EO-PTC) ........................................................................... 16
2.4 Quasi-Moving Block ................................................................................................. 18
2.5 Full-Moving Block .................................................................................................... 23
2.6 Centralized Interlocking ............................................................................................ 24
3. HRCTC Performance Analysis and Results ........................................................................ 27
3.1 Methodology to Analyze the Ability to Recover from Overlay PTC ....................... 27
3.2 Results of the Ability to Recover from Overlay PTC Analysis ................................ 39
3.3 Analysis of Capacity Increase Gains ......................................................................... 48
3.4 Conclusion of the Performance Analysis Results ..................................................... 52
4. High-Level Migration Plan .................................................................................................. 53
4.1 Generic High-Level Migration Steps ........................................................................ 55
4.2 EO-PTC High-Level Specific Migration Steps ......................................................... 61
4.3 QMB High-Level Specific Migration Steps .............................................................. 62
4.4 FMB High-Level Specific Migration Steps .............................................................. 62
5. High-Level Feasibility Analysis .......................................................................................... 64
5.1 Positive Train Location – End-of-Train .................................................................... 64
5.2 Alternate Broken Rail Detection ............................................................................... 65
5.3 Centralized Interlocking ............................................................................................ 66
5.4 Movement Authority Functionalities ........................................................................ 67
6. Conclusion ........................................................................................................................... 68
7. References ............................................................................................................................ 69
Appendix A: Configuration of Operational Scenario Simulation Models .................................... 70
Appendix B: Track Utilization Level ........................................................................................... 85
Appendix C: Theoretical Headway Reduction Calculations ........................................................ 94
Appendix D: PTC Braking Rate Calculation .............................................................................. 100
Appendix E: Office-To-Locomotive Communications Link Availability .................................. 103
Appendix F: Detailed PTCIE Train Delay Results ..................................................................... 108
iv
Appendix G: PTC Requirements for Railroad Network Simulation .......................................... 112
v
Illustrations
Figure 1. Schematic of Four-Aspect Signaled Route Configuration .............................................. 8
Figure 2. High-Level Architecture of ITC System ......................................................................... 9
Figure 3. PTC Evolutionary Path Diagram ................................................................................... 10
Figure 4. Speed Limits under Overlay PTC and EO-PTC and Potential Capacity Gain .............. 10
Figure 5. QMB Operation with NGTC and PTL-EOT ................................................................. 11
Figure 6. Centralized Interlocking Architecture Diagram ............................................................ 12
Figure 7. Fixed and Moving Block Operation and Excessive Train Separation .......................... 12
Figure 8. PTC Evolution and Introduction of New Concepts/Technologies ................................ 13
Figure 9. Wayside Signal Aspects and WSMs in Overlay PTC and EO-PTC ............................. 16
Figure 10. Onboard Display in EO-PTC....................................................................................... 17
Figure 11. Near-Simultaneous Siding Meet.................................................................................. 18
Figure 12. In EO-PTC, Train 2 Continues without Reducing Speed............................................ 18
Figure 13. QMB Architecture Diagram ........................................................................................ 21
Figure 14. QMB Interfaces Schematic Overview ......................................................................... 22
Figure 15. Fixed Physical Signaling Blocks Impose Artificial Constraints, Resulting in Excess
Train Separation and Reduced Line-of-Road Track Capacity .............................................. 23
Figure 16. FMB Method – Overall Architecture Diagram ........................................................... 24
Figure 17. Conventional Field Interlocking Architecture Schematic ........................................... 25
Figure 18. CTC with Centralized Interlocking Architecture ........................................................ 25
Figure 19. QMB/FMB with Centralized Interlocking Architecture ............................................. 26
Figure 20. Train Travel Time Comparison among Train Control Methods ................................. 28
Figure 21. TTCI’s PTC Performance Analysis Process Macro Flow Diagram ............................ 29
Figure 22. Train Braking Curves .................................................................................................. 33
Figure 23. Calculation of Train Delay without Operational Disruption ....................................... 38
Figure 24. Calculation of Train Delay with Operational Disruption ............................................ 39
Figure 25. Comparison between the Results of the Two Disruption Scenario Cases ................... 39
Figure 26. Total Train Delay per 100 Train-Miles at 50 percent TUL ......................................... 41
Figure 27. Total Train Delay per Year at 50 percent TUL ........................................................... 41
Figure 28. Comparative Train Delay Differences versus Train Control Method between Cases
with and without PTCIEs at 50 percent TUL ....................................................................... 42
Figure 29. Total Train Delay for each Operational Scenario at 25 percent TUL ......................... 43
Figure 30. Total Train Delay for each Operational Scenario at 50 percent TUL ......................... 43
vi
Figure 31. Total Train Delay for each Operational Scenario at 75 percent TUL ......................... 44
Figure 32. Total Train Delay for each Operational Scenario at 100 percent TUL ....................... 44
Figure 33. Capacity to Recover from Disruption Event at 50 percent TUL, Including DUA
Results ................................................................................................................................... 45
Figure 34. Capacity to Recover from Disruption Event at 50 percent TUL without DUA Results
............................................................................................................................................... 46
Figure 35. Capacity to Recover from Disruption Event at 75 percent TUL without DUA Results
............................................................................................................................................... 46
Figure 36. Relative Contribution of Each Type of PTCIE to Train Delay (minutes/100,000 train-
miles) in Overlay PTC .......................................................................................................... 48
Figure 37. Theoretical Train Headway Results for Trains with 100 Empty Cars at 60 mph ....... 49
Figure 38. Compiled Results of Theoretical Maximum Headway Reduction for EO-PTC and
FMB Compared to Conventional Signaling for Various Block Sizes .................................. 50
Figure 39. Compiled Results of the Theoretical Maximum Capacity Increase for EO-PTC and
FMB Compared to Conventional Signaling for Various Block Sizes .................................. 50
Figure 40. Capacity Increase Estimation Based on Simulation Results ....................................... 51
Figure 41. A Practical Roadmap through HRCTC Modes Leading to FMB ................................ 55
Figure 42. Schematic Diagram of the DUA Operational Scenario RTC Model .......................... 82
Figure 43. Schematic Diagram of Subdivisions in the DUA RTC Model.................................... 90
Figure 44. EO-PTC and FMB Train Headway for Empty Steel Coal Cars at 60 mph ................. 94
Figure 45. EO-PTC and FMB Train Headway for Empty Steel Coal Cars at 30 mph ................. 94
Figure 46. EO-PTC and FMB Train Headway for Loaded Steel Coal Cars at 50 mph................ 95
Figure 47. EO-PTC and FMB Train Headway for Loaded Steel Coal Cars at 30 mph................ 95
Figure 48. EO-PTC and FMB Train Headway for Empty Aluminum Coal Cars at 60 mph........ 96
Figure 49. EO-PTC and FMB Train Headway for Empty Aluminum Cars at 30 mph ................ 96
Figure 50. EO-PTC and FMB Train Headway for Loaded Aluminum Cars at 50 mph ............... 97
Figure 51. EO-PTC and FMB Train Headway for Loaded Aluminum Cars at 30 mph ............... 97
Figure 52. EO-PTC and FMB Train Headway for Empty Intermodal at 70 mph ........................ 98
Figure 53. EO-PTC and FMB Train Headway for Empty Intermodal at 30 mph ........................ 98
Figure 54. EO-PTC and FMB Train Headway for Loaded Intermodal at 70 mph ....................... 99
Figure 55. EO-PTC and FMB Train Headway for Loaded Intermodal at 30 mph ....................... 99
Figure 56. Braking Rate Calculation Diagram ........................................................................... 100
Figure 57. Histogram of Braking Rates for Train Class Expedited ............................................ 101
Figure 58. Histogram of Braking Rates for Train Class Freight................................................. 102
vii
Figure 59. Histogram of Braking Rates for Train Class Freight................................................. 102
Figure 60. Coverage Gap Threshold for Office Segment Poll Messages ................................... 103
Figure 61. Illustration of Coverage Gaps Resulting from the Failure of a Base Station along the
Tracks of a Railroad Subdivision ........................................................................................ 105
Figure 62. Illustration of Coverage Gap Size Estimation, Using Google Earth ......................... 106
Figure 63. Illustration of the Three Conceptual Types of Braking Curves ................................ 115
Figure 64. Illustration of the Reaction of the Train Engineer to the Time to Enforcement
Indication in the OBC ......................................................................................................... 116
Figure 65. Illustration of Potential Benefit of Modified Signal Rules for Approach Signals with
PTC in Passenger Trains ..................................................................................................... 133
Figure 66. Illustration of the Architecture of the QMB Method of Train Control .................... 139
Figure 67. QMB Abstraction – Sequence of MAs ...................................................................... 140
Figure 68. Illustration of Occupancy Blocks in QMB ................................................................ 140
Figure 69. Illustration of Addition of OBs between Control Points in QMB ............................. 141
Figure 70. Illustration of Fixed Block and Moving Block Concepts .......................................... 143
Figure 71. Illustration of All Elements that Contribute to Train Separation Distance Between
Trains in Following Moves in a Moving Block Operation ................................................. 143
Figure 72. Illustration of the Architecture of FMB Method of Train Control ............................ 144
Figure 73. FMB Simplified Model Sequence in a Signaled Territory ........................................ 145
Figure 74. Illustration of Close Following Move Condition ...................................................... 146
viii
Tables
Table 1. Summary of System Design Changes as Train Control Methods and Configurations
Evolve ................................................................................................................................... 13
Table 2. QMB Expected Benefits ................................................................................................. 19
Table 3. Simulation Use Case Matrix ........................................................................................... 31
Table 4. Total PTC Route Miles from the FRA PTC Dashboard ................................................. 32
Table 5. Percentage of Train Miles per Operational Scenario and Nationwide Extrapolation .... 32
Table 6. PTC Target Train Braking Rates Used in RTC Simulations .......................................... 34
Table 7. List of PTC Impact Events Included in Use Cases ......................................................... 35
Table 8. List of PTC Impact Events and their RAM Parameters .................................................. 37
Table 9. List of Cases Developed per TUL .................................................................................. 40
Table 10. PTCIE Train Delay (minutes/100,000 train-miles) for Each Train Control Method .. 47
Table 11. TUL at 130 Mins/100 Train-Miles per Train Control Methods ................................... 51
Table 12. Capacity Comparisons between Train Control Methods at 130 Mins/100 Train-Miles
............................................................................................................................................... 52
Table 13. Primary Operational Scenario Configuration Parameters ............................................ 70
Table 14. Signaled Single-Track Configuration Parameters ........................................................ 71
Table 15. Signaled Single-Track Train Schedule ......................................................................... 72
Table 16. Signaled Double-Track Configuration Parameters ....................................................... 73
Table 17. Signaled Double-Track Train Schedule ........................................................................ 74
Table 18. Signaled Triple-Track Configuration Parameters ......................................................... 77
Table 19. Signaled Triple-Track Train Schedule .......................................................................... 77
Table 20. DUA Configuration Parameters .................................................................................... 82
Table 21. Total Trains per Weekday in the DUA Model ............................................................. 83
Table 22. Non-Signaled Territory Configuration Parameters ....................................................... 83
Table 23. Signaled Triple-Track Train Schedule .......................................................................... 84
Table 24. Practical Capacity Values per Operational Scenario .................................................... 87
Table 25. Results of RTC Runs for the Signaled Single-Track Theoretical Capacity Calculation
............................................................................................................................................... 87
Table 26. Practical Capacity Summary for the Signaled Single-Track Operational Scenario ..... 87
Table 27. Results of RTC Runs for the Signaled Triple-Track Theoretical Capacity Calculation
............................................................................................................................................... 88
Table 28. Practical Capacity Summary for the Signaled Triple-Track Operational Scenario ...... 88
ix
Table 29. Practical Capacity Summary for the Signaled Double-Track Operational Scenario ... 89
Table 30. Practical Capacity Summary for the Non-Signaled Operational Scenario ................... 90
Table 31. Number of Mainline Tracks in Each DUA Subdivision ............................................... 91
Table 32. Practical Capacity Calculation of the DUA Sections ................................................... 91
Table 33. Practical Capacity Summary for the DUA Operational Scenario ................................. 93
Table 34. Track Profile Inclination and Initial Train Speeds Included in the TOES Simulation
Runs for Each Train Class .................................................................................................. 100
Table 35. PTC Braking Rates per Train Class ............................................................................ 102
Table 36. Coverage Gap Size Impacting PTC Protection Due to Not Receiving WSM in WSRS
Territory, as a Function of Train Speed .............................................................................. 105
Table 37. Coverage Gap Size Impacting PTC Protection Due to Not Receiving Office Segment
Poll Messages, as a Function of Train Speed ..................................................................... 105
Table 38. Average Gap Sizes Resulting from Base Station Failure for Each Operational Scenario
............................................................................................................................................. 107
Table 39. En route Onboard Software Recoverable Train Delay per Operational Scenario and
Train Control Method ......................................................................................................... 108
Table 40. Back Office Downtime Train Delay per Operational Scenario and Train Control
Method ................................................................................................................................ 108
Table 41. PTC Wayside Failure at CP Train Delay per Operational Scenario and Train Control
Method ................................................................................................................................ 108
Table 42. PTC Wayside Failure at IS Train Delay per Operational Scenario and Train Control
Method ................................................................................................................................ 109
Table 43. PTC Wayside Failure at Controlled Switch Train Delay per Operational Scenario and
Train Control Method ......................................................................................................... 109
Table 44. En route Onboard Hardware Non-Recoverable Train Delay per Operational Scenario
and Train Control Method .................................................................................................. 109
Table 45. Sync Error Train Delay per Operational Scenario and Train Control Method ........... 109
Table 46. BOS-Loco Link Train Delay per Operational Scenario and Train Control Method . 110
Table 47. En route Operator Error – Speed Enforcement Train Delay per Operational Scenario
and Train Control Method .................................................................................................. 110
Table 48. En route Operator Error – Other Enforcement Train Delay per Operational Scenario
and Train Control Method .................................................................................................. 110
Table 49. Initialization Delay Train Delay per Operational Scenario and Train Control Method
............................................................................................................................................. 111
Table 50. Initialization Onboard Hardware Failure Train Delay per Operational Scenario and
Train Control Method ......................................................................................................... 111
Table 51. Requirements for Overall System Configuration ....................................................... 114
x
Table 52. Requirements for Train Braking in PTC Operation .................................................... 117
Table 53. Requirements for PTC Response to Signal Aspect Upgrades .................................... 119
Table 54. List of PTC-Related Events that Impact Train Operations ......................................... 121
Table 55. Requirements for Individual Train Operation Impact Events .................................... 124
Table 56. Potential Interface Design/Layout for Individual Train Operation Impact Event ...... 127
Table 57. Requirements for WIU Failure Events ....................................................................... 128
Table 58. List of Requirements for Script Mode Commands ..................................................... 132
Table 59. Requirements for Configurable Signal Rules ............................................................. 133
Table 60. List of Operational Scenarios and Their Fallback Operation ..................................... 135
Table 61. Requirements for PTC Fallback Operations ............................................................... 136
Table 62. Requirements for Quasi-Moving Block Operation ..................................................... 141
Table 63. Requirements for FMB Operation .............................................................................. 146
1
Executive Summary
Transportation Technology Center, Inc., (TTCI) developed and analyzed new train control
systems concepts that could potentially offset the negative impacts to train operations introduced
by the current implementation of Positive Train Control (PTCreferred to throughout this report
as Overlay PTC). The results indicate that the proposed train control methods may have the
ability to mitigate the negative impacts caused by Overlay PTC as well as increase overall
efficiency beyond what can be achieved without PTC.
Researchers analyzed the performance of three proposed new train control methods Enhanced
Overlay PTC (EO-PTC), Quasi-moving Block (QMB), and Full-moving Block (FMB) built upon
the current Overlay PTC design. EO-PTC, if implemented on all PTC-controlled tracks, was
estimated to provide a slight reduction in total travel time, while QMB and FMB could provide
further reduction, which could be used to increase overall network capacity.
The proposed train control methods can also provide additional capacity gains as trains will be
able to operate with shorter headways. For the specific operational scenarios and
implementations modeled, EO-PTC, if implemented in all signaled territories, could provide a
capacity increase of approximately 4.2 percent when compared to railroad performance before
implementation of PTC, while FMB could provide approximately 10.4 percent.
The results indicate that all of the proposed train control methods had the potential to not only
offset the impact caused by Overlay PTC but could also provide capacity gains.
The analysis investigated the effects on railroad network operation caused by the operation of
PTC, such as the conservatism of train braking enforcement algorithms, impacts on train
operation due to failure of PTC components and human operation errors, as well as the
improvements provided by the proposed new train control methods. The research team modified
the railroad network simulation tool used in the project to incorporate PTC features and calculate
total train travel times for multiple operational scenarios (e.g., signaled single-, double- and
triple-track territories; non-signaled territories), configured with typical railroad operational
characteristics at multiple train density levels. The frequency and duration of events that affect
train operation due to Overlay PTC operation were based on actual field data collected by
participant railroads associated with their PTC operation at the time the data was collected, and
extrapolated to project the frequency and duration of events at the time when PTC was fully
deployed on all required lines.
The proposed train control methods are at different levels of readiness for deployment. EO-PTC
can be implemented without software or hardware changes, requiring only changes to the
configuration of the track database, modification of rules, and training. QMB, when configured
to utilize technology such as Positive Train Location at the End-of-Train (PTL-EOT) and
centralized interlocking, requires development of new, or modification to existing, train control
components (hardware and software) as well as the development of these new technologies.
These technologies are not fully ready for PTC yet and require the completion of current
developments. FMB will substantially leverage off of QMB and will require the use of an
alternate broken rail and rollout detection system. This report provides a practical roadmap for
quickly migrating to FMB, with each step heavily leveraging off of the prior train control
method.
2
Based on the concepts defined during the development of this project, multiple spin-off projects
were initiated for EO-PTC, QMB, FMB and associated technologies. As of late 2019, the Federal
Railroad Administration had awarded multiple spin-off projects from the Higher Reliability and
Capacity Train Control (HRCTC) program, and other projects had been selected by railroad
committees had selected other high-priority projects for development.
3
1. Introduction
1.1 Background
Signaling and train control systems support safe and efficient railroad operations. Concepts for
new train control methods and technologies have the potential to improve safety, capacity, and
average velocity as well as to reduce life cycle costs. Current Positive Train Control (PTC
referred to throughout this report as Overlay PTC) systems provide safety enhancements but also
increase lifecycle costs due to the addition of equipment on locomotives, along the wayside, and
in the back office. Overlay PTC systems hinder railroad operations because they maintain all the
constraints of the underlying conventional signaling system with added conservatism to account
for imperfect input information and the additional failure modes they introduce. These impacts
manifest themselves as the stopping or slowing of trains prematurely or unnecessarily due to:
Equipment/system failures – e.g., hardware failures, design errors in hardware or
software
Message communication failures Due to loss of over-the-air or backbone messages;
excessive communications latency or insufficient throughput can also be detrimental to
train operations.
Global Positioning System (GPS) issues Due to loss of signal or errors that could result
from multi-path, diminished satellite geometric dilution of precision (GDOP), or satellite
outage.
Premature warning or enforcement braking – Due to conservatism in the braking
prediction algorithm
Incorrect data – For example, track data, consist characteristics, or configuration
parameters
Operator error Occurring during initialization or operation
These events delay trains and reduce railroad capacity at a time when railroads are approaching
capacity limits in many areas. The degradations are greatest in high-traffic-density areas, where
improvements (not degradations) are needed the most. Further, these locations are where delays
in one train are most likely to cause delays in other (e.g., following) trains. Furthermore, system
reliability issues can also impact safety because when PTC equipment fails, it can no longer
provide its intended safety functionality.
It is critical to the nation’s economy, businesses, as well as citizen safety and well-being to keep
freight, passenger and commuter traffic flowing efficiently, smoothly and safely. Consequently,
there is a need to improve the reliability and capacity of today’s train control systems, especially
in areas of high traffic density.
Because of these issues, the Federal Railroad Administration (FRA) tasked Transportation
Technology Center, Inc., (TTCI) to undertake a comprehensive study of methods and
technologies to improve train control effectiveness and efficiency and to mitigate or compensate
for these impacts. TTCI investigated a spectrum of Higher Reliability and Capacity Train
Control (HRCTC) concepts, ranging from improving conventional train control systems to
integration of new technologies/concepts and improvements in reliability and maintenance that
would mitigate or offset these impacts.
4
The HRCTC concepts are built upon existing Overlay PTC implementation to allow for staged
migration to the target state with incremental return on investment (ROI); i.e., individual modes
and supporting subsystems of HRCTC can be fielded at different times in different PTC-
controlled territories and each stage is capable of providing benefits on its own. Trains will be
able to seamlessly transition between areas with and without the proposed new methods and
technologies, just like trains transition today among train control territories, such as Centralized
Traffic Control (CTC), current of traffic, and track warrant control (TWC). Many tradeoffs must
be performed to achieve industry standards that meet the needs of the various affected railroads
and that allow maximal flexibility for variants in implementation and sourcing.
1.2 Objectives
The objectives of this project were to:
Understand the observed and potential operational and safety impacts of Overlay PTC,
particularly as related to effects on railroad capacity and system availability.
Develop methods to increase railroad capacity and improve PTC system availability
through a multi-faceted study that considers various operations-related elements (not only
PTC). This includes elements that are on board trains, at the wayside, and in the back
office, as well as the communications network that interconnects them.
Develop the HRCTC concepts and high-level migration roadmap for the deployment of
those concepts.
Develop a high-level approach that will allow for staged implementation of identified train
control methods and, where appropriate, migration to these methods with incremental ROI
(i.e., individual subsystems will be fielded at different times in different areas and they
must each be capable of providing benefits on their own).
Develop an approach that will provide trains with the ability to seamlessly transition
between areas with and without these technologies, just like trains transition today among
train control territories such as CTC, current of traffic, track warrant control (TWC).
Develop an approach that will meet the needs of the various affected railroads and allow
for maximal flexibility for variants in implementation and sourcing.
1.3 Overall Approach
The development of the project included regular meetings with the project’s Advisory Group
(AG) to present the progress of the project, discuss and make decisions about project-related
issues, discuss the concepts of the proposed train control methods, as well as present and review
results of technical analyses. The concepts for the proposed train control methods were based on
the results of multiple analyses and were continuously improved during discussions with the AG.
The work was conducted with a combination of tasks:
1. Researchers developed a high-level conceptual analysis of candidate methods that could
help mitigate the negative impacts of Overlay PTC. The concepts were initially prepared
by a team composed of railroad experts specialized in train control methods and revised
with the project’s AG in several meetings.
5
2. As required during the development of the train control concepts, researchers developed
technical analyses with both analytical and simulation tools to assess their feasibility. The
results of those analyses were shared with the AG to support project decisions.
3. Researchers prepared a white paper report with the results obtained and submitted to the
AG.
4. They prepared the requirements for PTC simulation that included the description of
system behavior in case of occurrence of exceptional events related to PTC operation
(i.e., failure of PTC components or human error when operating PTC). The requirements
were distributed to the software development providers that implement railroad network
simulation software. TTCI followed-up on the development of the PTC features
implemented to satisfy the requirements.
5. Researchers analyzed Overlay PTC operation field data collected by railroads containing
information about the occurrence of exceptional events during Overlay PTC operation,
used to calculate the average frequency of those events and time to restore normal
operation.
6. The research team, with direction and input from the AG, selected the operational
scenarios required to evaluate the impact of Overlay PTC operation and the performance
of the various train control methods.
7. The team developed models in the railroad network simulation tool for the selected
operational scenarios.
8. They ran network simulations of multiple cases using the PTC features and feeding the
model with the results of the analysis of the Overlay PTC operation field data.
9. They developed tools to compile the results of the simulations and generate comparative
performance analysis. The results of the performance analysis were presented to the AG.
10. In parallel with the development of the simulation and analysis tasks, the concepts for the
new train control methods were being continuously improved. New technologies and
modifications to process were incorporated into the proposed train control methods as
required. Spin-off projects were proposed, reviewed, and approved by the AG.
11. Based on the concepts of the proposed train control methods and the current stage of
development of technologies, the research team developed a high-level migration plan
and feasibility analysis.
1.4 Scope
The project included the analysis of Interoperable Train Control (ITC)-compliant systems only.
TTCI assumed that the core architecture of the Overlay PTC system will be retained; i.e.,
alternative architectures that could replace the entire system or core system designs were not
considered. The train control methods proposed as the evolution of the Overlay PTC system
considered the use of new technologies that are either already being developed or in advanced
conceptual stages and could potentially be fully implemented within the lifetime of PTC.
The analysis of the performance of the train control methods and impacts on operations resulting
from those methods was developed for selected operational scenarios considered to be
6
representative of the majority of U.S. railroad operations. researchers developed the analysis
using both analytical methods and simulation. The simulations of the operational scenarios
included multiple train density level runs, except for the dense urban area (DUA) scenario, for
which the train density was based on 2020 train traffic levels. The analysis included assessment
of the capacity of the train control methods to recover from typical operational disruption
scenarios that can occur in daily operations; i.e., exceptional scenarios such as long duration
operational disruptions were not analyzed. The simulation of the proposed train control methods
were limited to restrictions of the tool used in the analysis; for example, moving block operation
was emulated using fixed blocks configured with 0.1-mile lengths.
Researchers developed a limited analysis of the PTC system availability, restricted to the
identification of the main contributors to impacts in railroad operation. The analysis was based
on PTC operation field data collected by some of the participant railroads containing information
about the occurrence of exceptional events during Overlay PTC operation. The impact on
operations caused by underlying systems (such as the signaling system) was not included in the
analysis.
This work does not include analysis of costs to implement the proposed train control methods.
The high-level migration plan describes the sequence of generic steps to implement the proposed
train control methods and key aspects that need to be considered during the ROI analysis for a
particular territory.
1.5 Organization of the Report
The report is divided in the following sections:
Section 2 describes the concepts of the proposed train control methods, the technologies
involved and suggested steps for evolution. Sub-sections describe core principles of each
of the proposed train control methods and related spin-off projects
Section 3 describes the methodologies and tools used to assess the impacts of the
introduction of Overlay PTC and the performance of the proposed train control methods.
It also contains results obtained through applying the methodologies and tools to evaluate
the performance of the proposed train control methods.
Section 4 describes the migration strategies for the proposed train control methods. It
includes a section with a generic plan that provides the framework and roadmap for the
migration to any train control method and separate sections with specifics for each of the
train control methods.
Section 5 describes the assessment of the feasibility of the technologies necessary for the
implementation of the proposed train control methods, describing current stages of
development, challenges for development and current initiatives for implementation.
Section 6 contains the conclusions of the project.
Appendices A–G contain several sections with detailed data and/or descriptions of
methods used in the analysis. They also contain the Requirements for Implementation of
PTC Features for Railroad Network Simulation.
7
2. HRCTC Concepts and PTC Evolution
2.1 Current System: Overlay PTC
Overlay PTC is a safety overlay system, meaning it enforces rules of the train control method on
which it is overlaid and does not replace the pre-existing conventional train control system. In
signaled territory, Overlay PTC enforces compliance with the fixed block signaling system as
explained below.
2.1.1 Conventional Fixed-Block Signaling
Track circuits are one of the basic components of conventional fixed block railroad signaling
systems. Conventional signal systems typically use track circuits to perform three functions:
1. Detect occupancy in each block.
2. Detect broken rail in each block.
3. Communicate the operational status of each block to adjacent blocks.
The track is separated into electrically isolated sections (blocks) to create track circuits.
Typically, insulated joints in the rails are used to isolate each block. A voltage is placed across
the rails at one end of the block, and the presence or absence of electrical current is detected at
the opposite end of the block. If sufficient current is detected, the block is considered clear of
shunting vehicles or broken rails; if sufficient current is not detected, the block is considered not
clear as there may be a vehicle present, a broken rail, or a failed track circuit component.
In conventional signaling systems, signal aspects are determined by the status of the block over
which the signal governs movement, as indicated by the track circuit in that block, as well as the
status of adjacent blocks. Information about the status of each block is typically transmitted to
adjacent blocks using coded track circuits, although other methods are used in certain cases.
The minimum required length of the track circuit is based on worst-case braking distances at
track speed and the number of signal aspects that can be displayed at that location. For example,
with four-aspect signaling, the blocks are spaced such that two blocks represent no less than the
distance of normal service braking for the worst-case braking train traveling at Maximum
Authorized Speed (MAS). This supports safe separation between trains, as seen in Figure 1. If a
train is detected on a given block, the signals for the preceding blocks will be ordered by
restrictiveness: red (Stop, Stop-and-Proceed, or Restricting), yellow (Approach), flashing yellow
(Advance Approach), and Green (Proceed). Flashing yellow can be used to indicate proceed and
prepare to stop at second signal or proceed and reduce speed before passing next signal.
8
Figure 1. Schematic of Four-Aspect Signaled Route Configuration
2.1.2 Positive Train Control
The Rail Safety Improvement Act of 2008 (RSIA’08) mandates implementation of interoperable
PTC on a significant portion of U.S. rail lines. PTC, as defined in RSIA’08, is a system designed
to prevent train-to-train collisions, overspeed derailments, unauthorized incursions into
established roadway work zones, and movement of a train through a mainline switch in the
wrong position. There are a few different systems currently being implemented to satisfy the
PTC requirements. The most predominant of these systems is defined by the ITC standards.
Figure 2 illustrates the high-level architecture of an ITC-compliant system. The locomotive
onboard segment in this example determines the location of the train relative to the track and
critical assets along the track using GPS, tachometer, switch position information, and an
onboard track database. Consist and route information, among other things, are provided to the
locomotive onboard system from the PTC back office during initialization. Wayside Interface
Units (WIUs) installed at switch and signal locations along the track periodically broadcast the
status of the switches and/or signals they are monitoring over the communications network. As
the train approaches these locations, the status messages are received by the locomotive onboard
system. Work zones, temporary speed restrictions, and other bulletin data are provided to the
locomotive onboard system by the PTC back office over the communications network.
All the operational data provided to the locomotive onboard system is processed to determine the
operational limits (authority and speed restrictions) for that train. The locomotive onboard
system regularly updates the predicted braking distance of the train and warns the train crew
when the system is within a specified time of applying a penalty brake enforcement being
applied to avoid violating an authority or speed limit. Additionally, should the locomotive crew
fail to take appropriate action to prevent the violation, the onboard segment will enforce with a
penalty brake application to stop the train to avoid the violation.
9
Figure 2. High-Level Architecture of ITC System
2.2 PTC Reliability and Capacity Improvement Overview
The evolutionary path of PTC to achieve higher reliability and capacity gains can come from
three groups of improvements:
1. New methods of train control: Adoption of new concepts for train control by exploring
the capabilities made available with the introduction of Overlay PTC implementation.
2. New technologies: Integration of new technologies that become either feasible or capable
of achieving their full capacity with the introduction of Overlay PTC.
3. Reliability, Availability, and Maintainability (RAM) improvements: Implementation of
improvements in the reliability and maintainability of components and/or systems that
impact railroad efficiency or increase exposure to hazard under PTC operations.
Three new train control methods have been identified as the potential evolutionary stages from
Overlay PTC:
1. Enhanced Overlay PTC (EO-PTC): This consists of the realization of operational
efficiency by not enforcing speed restrictions at Approach and Advance Approach
indications when the PTC onboard is in the “active” state. This is a straightforward
implementation that only requires reconfiguration of input tables of the Overlay PTC
onboard system and changes to railroad operational rules.
2. Quasi-Moving Block (QMB): This consists of governing any train operation in PTC
territory by the issuance of non-overlapping movement authorities, known as PTC
Enforceable Authority (PTCEA). This offers more consistency in train control as well as
safety improvements over current Overlay PTC, including the ability to provide rear-end
collision protection and collision protection within a joint authority. Additionally, QMB
10
offers improved capacity (if certain optional technologies are integrated) and reliability
and is a logical step in the migration to a full-moving block train control method.
3. Full-Moving Block (FMB): This a concept where the track occupancy is determined by
a train’s footprint (from front- to rear-end) instead of fixed blocks (such as track circuits).
In FMB, the system nearly continuously updates PTCEAs based on each train’s footprint.
Sections 2.2, 2.3, and 2.4 describe the core concepts of these train control methods in further
detail. Figure 3 illustrates the typical evolution path of those PTC train control methods. It is
possible, however, to skip one or more stages, as discussed in more detail in Section 4.
Figure 3. PTC Evolutionary Path Diagram
EO-PTC can provide increased capacity, as trains are allowed to operate at higher speeds when
operating in blocks with Approach and Advance Approach indications with EO-PTC, which can
result in shorter headways when operating above 30 mph, as illustrated in Figure 4.
Figure 4. Speed Limits under Overlay PTC and EO-PTC and Potential Capacity Gain
In QMB, train movements are limited by the same physical constraints as Overlay PTC and EO-
PTC, i.e., track circuit boundaries. However, there are two ways railroads can expand their
capacity with QMB beyond the gains obtained with EO-PTC. The first way is by shortening
track circuits, such as by halving track circuit lengths in signaled territories where train traffic
volumes are reaching practical capacity. Even though this is theoretically possible with any
11
signaling system, it can be done at lower cost in QMB, as it can be implemented without the
need to increase the number of physical signals nor aspects.
The second way QMB can provide capacity gains is when implemented with two other emerging
concepts:
Next Generation Track Circuits (NGTC): NGTC is a technology that allows for the
determination of the integrity of an occupied track circuit between the boundary of the
track circuit up to the occupying train’s footprint.
Positive Train Location End-of-Train (PTL-EOT): PTL-EOT is a technology that
allows a train to report its rear-end position in a vital way.
Combining the introduction of PTCEAs in QMB with the ability to detect broken rail behind a
train with NGTC and the determination of the rear-end location of a train with PTL-EOT, QMB
can also provide capacity gains in following moves. Figure 5 illustrates a following move
operation with NGTC and PTL-EOT. When Train 2, which is following Train 1, reaches the
boundary between track circuits 1 and 2, it has its PTCEA extended at MAS with a target to stop
at the rear-end location of Train 1, which is the last known location of Train 1 when Train 2
reached the boundary. From that point on, the PTCEA for Train 2 will be extended to the rear
end of Train 1, but now with a Restricted Speed restriction (RSR), as it is not possible to
determine the integrity of the rail until Train 1 completely clears track circuit 2.
Figure 5. QMB Operation with NGTC and PTL-EOT
The implementation of QMB also facilitates the implementation of a centralized interlocking
(CIXL) architecture, particularly because the authorization of train movement is not granted by
visual signals, but by PTCEAs, which are already generated in a central component with QMB.
Figure 6 illustrates the implementation of CIXL with QMB.
12
Figure 6. Centralized Interlocking Architecture Diagram
FMB is the final stage of evolution of PTC envisioned in terms of train headway reduction, as a
train in a following move can operate continuously based on its braking curve to the rear-end of
a leading train (see Figure 7). The excess train spacing when operating at speeds above 30 mph
under conventional fixed block train control systems is eliminated. An additional objective of
FMB is to replace track circuits with a more cost-effective method of detecting rail breaks and
rollouts.
Figure 7. Fixed and Moving Block Operation and Excessive Train Separation
The implementation of FMB, however, requires addressing the following issues:
Identification of broken rail between the front end of a following train and the rear end of
train ahead when the trains are separated by as little as the braking distance of the
following train. This requires a broken rail detection system that is not tied to fixed block
boundaries. Without track circuits, an alternative method of protection with regard to
rollout movements must be provided. In traditional signaling systems (such as
13
Centralized Traffic Control), these functions are provided solely by conventional track
circuits, which does not satisfy the requirement for FMB.
Continuous vital location of trains (front and rear-end) to safely keep trains separated,
e.g., PTL-EOT.
Figure 8 illustrates how new concepts/technologies could be introduced as PTC evolves.
Figure 8. PTC Evolution and Introduction of New Concepts/Technologies
As PTC evolves in different territories, various train control methods and configurations become
possible. Depending on the chosen configuration, system components and functions are added,
while existing components and functions are changed or eliminated. Table 1 summarizes the
main changes in system design when evolving from one train control method and configuration
to another.
Table 1. Summary of System Design Changes as Train Control Methods and
Configurations Evolve
Type of
Territory
From (train control
method/configuration)
To (train control
method/configuration)
System Design Changes
Signaled
Overlay PTC
EO-PTC
Reconfiguration of signal indication (e.g.,
via track data modification) to relax
Approach and Advance Approach speed
restrictions
EO-PTC
QMB keeping field
interlocking and
without NGTC and
PTL-EOT
System Design Changes from Overlay
PTC to EO-PTC, plus:
1) Introduction of exclusive PTC
Enforceable Authorities (PTCEA) in all
territories, for all types of trains, at all
times
2) PTCEAs periodically rolled up with
RSR during CFM based on non-vital rear-
of-train location determination.
3) Elimination of field signals
4) Track circuits can be shortened at
lower cost.
14
Type of
Territory
From (train control
method/configuration)
To (train control
method/configuration)
System Design Changes
EO-PTC
QMB keeping field
interlocking and with
addition of NGTC
and PTL-EOT
System Design Changes from EO-PTC to
QMB without NGTC and PTL-EOT,
plus:
1) Vital rear-of-train location
determination with PTL-EOT
2) Improved broken rail detection with
NGTC
3) PTL-EOT and NGTC together allow
train operation at track speed in portion of
an occupied block during close following
moves.
EO-PTC
QMB with the
addition of CIXL,
NGTC and PTL-EOT
System Design Changes from EO-PTC to
QMB with NGTC and PTL-EOT, plus:
1) Migration of interlocking functions to
the back office
2) Decommissioning of field interlocking
components
QMB with field
interlocking end
PTL-EOT (but no
NGTC)
FMB with field
interlocking
Introduction of alternative broken rail
detection that supports track speed
anywhere in an occupied block (up to
braking distance from the train ahead).
QMB with field
interlocking, NGTC
and PTL-EOT
FMB with field
interlocking
Introduction of alternative broken rail
detection (alternative to NGTC) that
supports track speed anywhere in an
occupied block (up to braking distance
from the train ahead).
QMB with CIXL and
EOT-PTL (but no
NGTC)
FMB with CIXL
Introduction of alternative broken rail
detection that supports track speed
anywhere in an occupied block (up to
braking distance from the train ahead).
QMB with CIXL,
NGTC and PTL-EOT
FMB with CIXL
Introduction of alternative broken rail
detection (alternative to NGTC) that
supports track speed anywhere in an
occupied block (up to braking distance
from the train ahead).
Non-
signaled
Overlay PTC
FMB with optional
CIXL and alternative
broken rail detection
1) Introduction of exclusive Enforceable
Authorities (PTCEA) in all territories, for
all types of trains, at all times
2) Vital rear-of-train location
determination with PTL-EOT
3) Optional introduction of alternative
broken rail detection
4) Optional introduction of interlocking
functions in the back office
15
Note that not necessarily all railroad territories will have to evolve to more advanced train control
methods and configurations nor integrate/deploy all new technologies/concepts. As new train
control methods and configurations are added (e.g., EO-PTC, QMB), it is not necessary to
eliminate the old methods and configurations (e.g., Overlay PTC) from the system design. A
railroad’s decision on which train control method and configuration to apply to each territory can
be made on a case-by-case basis, depending on ROI analysis that a railroad may develop. It is
possible that a railroad will operate with one train control method and use supporting technologies
in some territories and a different method in other territories. This is analogous to a particular
railroad having some of its track operating under CTC, other track under ABS-TWC, and yet other
territory under TWC. Section 3 contains the results of analysis of expected benefits of the HRCTC
concepts under various operational scenarios and Section 4 elaborates further on PTC migration
roadmap. Railroads can use those as reference to plan their own evolution of PTC.
Improvements in the RAM of PTC components and subsystems can help offset the impacts
caused by their failure or insufficient performance. Increasing the mean time between downing
events (MTBDE) and/or reducing the mean time to repair (MTTR) of PTC components are
always key objectives in a RAM growth plan; therefore, it is important to determine the impact
caused by failures of PTC components or incorrect use of the system, to determine which ones to
prioritize during RAM analysis. Section 3.1.5 describes the types of PTC Impact Events
(PTCIEs) that were included in the analysis, while Section 3.2 includes results showing the
contribution of PTCIEs to the performance of train control methods.
The realization of the benefits expected from the proposed HRCTC concepts depends in many
cases on the availability of new technologies, not just as concepts or experiments, but as systems
that are feasible to be deployed, dependable, and capable of integrating with other systems.
Section 5 contains a high-level feasibility analysis of those technologies, including the
description of their current stage of development and gaps to achieve a feasible and deployable
product.
Note that FRA has funded a number of additional projects to advance the HRCTC concepts
herein described:
EO-PTC concept of operation (ConOps), safety analysis and implementation plan
(completed in July 2019)
QMB ConOps, safety analysis, feasibility analysis and implementation plan
QMB system requirement specification (SysRS)
Centralized Interlocking research
PTC Reliability, Availability and Maintainability analysis and growth plan
PTL-EOT requirements specification
Next generation track circuit ConOps
Alternative broken rail detection research
16
2.3 Enhanced-Overlay PTC (EO-PTC)
The fundamental concept of EO-PTC is that wayside signals no longer convey the authorized
speed within a block governed by Approach or Advance Approach signal indications. Instead,
the braking algorithm calculated by the onboard segment1 determines the train’s safe operating
speed within these blocks. Increased speed within Approach and Advance Approach blocks
allows closer following distances for PTC-equipped trains, resulting in efficiency gains without
compromising safety.
The core of the proposed EO-PTC implementation is a modification of the track database signal
mapping in such a way that WIU device status codes for the Approach and Advance Approach
status updates are mapped to a signal code indicating “Clear.No modification of the onboard
software is planned, as the new mapping is automatically applied when the updated track
database is received by the onboard segment. PTC-equipped trains and their crews see a Clear
indication on the onboard display when approaching signals with Approach and Advance
Approach aspects. Non-communicating trains follow the existing (more restrictive) wayside
aspect.
Figure 9 illustrates the signal indications for Approach and Advance Approach blocks,
respectively, for Overlay PTC and EO-PTC territories. In EO-PTC territories, the onboard track
database maps the Wayside Status Messages (WSM) related to the Approach signals to a Clear
code signal and display a green track line (as opposed to a yellow track line), as seen in Figure
10. This method allows all PTC trains to travel at MAS in these blocks if the calculated braking
distance is not beyond the stop target. MAS is the highest speed permitted for the movement of
trains permanently established by timetable/special instructions, general order, or track bulletin,
as defined in 49 CFR 214.7.
Figure 9. Wayside Signal Aspects and WSMs in Overlay PTC and EO-PTC
1 The onboard segment considers track speed restrictions due to curvature, grade, and condition of the track, as well
as speed restrictions imposed by the timetable or other instructions.
17
Figure 10. Onboard Display in EO-PTC
The rest of the signal status codes are utilized without modification. All PTC states and
enforcements (other than for the Approach and Advance Approach aspects) remain unchanged
for EO-PTC. This includes switching states and enforcements of mandatory directives.
The dependency on the track database allows for incremental deployment of EO-PTC on a per-
territory or per-signal basis, as determined by the operating railroad. Thus, a PTC train could use
EO-PTC in some or eventually all PTC territory.
2.3.1 Expected Benefit Example
2.3.1.1 Following Moves
EO-PTC following moves are handled similarly to current Overlay PTC operations in that train
separation is achieved through block signaling and a train is not allowed to enter an occupied
block without a Restricted Speed Restriction. However, speed reductions required by Approach
and Advance Approach indications are no longer required. Trains separated by at least one block
length can improve efficiency of movement by traveling at the speed of the leading train while
maintaining a shorter safe following distance. The result is reduced headway (which can translate
to increased capacity) within EO-PTC territory.
This efficiency gain remains true as long as a following train paces itself such that the leading
train clears each block before the following train gets within braking distance (or warning
distance, depending upon crew training) from that block. The enhancement of EO-PTC not only
reduces headway in following moves but also during recovery from service disruption scenarios.
2.3.1.2 Sidings and Crossings
When two trains meet nearly simultaneously at a siding to pass in opposing directions as
illustrated in Figure 11, Train 2, which is travelling on the main track, will potentially be able to
continue at a higher speed, leveraging the EO-PTC capabilities. The entrance to the main track is
still governed by an Approach signal, but Train 2 may now maintain its speed, as opposed to
reducing speed due to a premature speed restriction imposed by Overlay PTC. If Train 2 does not
reach its braking curve limit by the time Train 1 clears the track circuit of the switch, it will be
able to continue without reducing speed (Figure 12), improving movement efficiency in this and
other similar scenarios.
18
Figure 11. Near-Simultaneous Siding Meet
Figure 12. In EO-PTC, Train 2 Continues without Reducing Speed
When two trains meet at a diamond crossing, the train approaching the occupied crossing will
not have to reduce speed according to signal indications. Instead, it will continue according to
the braking curve. If the occupying train clears the crossing before the approaching train reaches
the limits of its braking curve, it can continue without reducing speed.
2.3.1.3 Service Disruption Recovery
One of the key potential advantages of EO-PTC as compared with Overlay PTC is the faster
recovery from service disruptions. Service disruptions result in trains having to completely stop
or move through a track block that has had its effective speed limit temporarily reduced from
normal track speed to; e.g., Restricted Speed.
There are multiple potential causes for this scenario, such as a failed WIU, Temporary Speed
Restriction, Work Authority, track being out of service due to maintenance, etc. The ability to
follow a train ahead more closely that is also resuming normal operation after the disruption will
result in faster recovery from said disruptions once they have been resolved or when trains are
leaving the disrupted area.
Multiple trains attempting to enter mainline track from a yard will benefit from a similar
efficiency gain.
2.4 Quasi-Moving Block
2.4.1 Overview of QMB Concept
The general concept of QMB is that the Computer-Aided Dispatch (CAD) system will create and
modify routes that are checked by a centralized interlocking system. Once a route is accepted,
the back office system creates or updates a train’s PTCEA (its exclusive authority), checking that
it does not overlap any other PTCEA. The PTCEA is then issued to the train through the
available communication path(s). The train onboard segment sets its target limits and speeds
19
based on the PTCEA received from the back office and other information. As the train moves,
the onboard continuously monitors the status of field devices broadcast from WIU locations to
verify that they are still consistent with its PTCEA. The train rolls up its PTCEA based on the
calculated or detected end-of-train location and informs the back office, which can then extend a
PTCEA for a following train.
2.4.2 Justification for QMB
QMB is part of a strategic plan to provide higher reliability and capacity train control. It can
provide benefits in reliability, safety, and capacity as seen in Table 2. These benefits come at the
cost of some architectural changes, including new back office functions that implement
interlocking functionality and PTCEA management, additional vital functions in the onboard
segment, optional vital end-of-train location determination and optional detection of broken rail
within an occupied block.
Table 2. QMB Expected Benefits
Category
Expected Benefit
Safety
Collision protection at all speeds (including restricted speed); vital when
using end-of-train location determination.
Pull-apart protection applies in any event when the reported vital end-of-
train indicates greater train length than estimated, in which the pulled-apart
cars are protected by a PTCEA.
Loss-of-shunt protection (using movement authorities, train location
reports, and train length data as additional sources of occupancy detection)
Uniform method of train control using PTCEAs for all trains.
Verification that crew track selection matches authorized tracks included in
train’s movement authority (note: this may already be done to some extent
in some PTC implementations).
Capacity and
Efficiency
Increased capacity beyond that of EO-PTC if track circuits are shortened.
Shorter track circuit blocks are more practical with QMB because: a) there
is no need for additional aspects since the signal heads and associated
aspects are eliminated, and b) the cost of additional track circuits is reduced
because the wayside logic and WIU functionality are minimal.
Increased capacity beyond that of EO-PTC if next generation track circuits
that can provide broken rail protection within an occupied block are used.
Vital EOT location must be used in conjunction with broken rail detection
in an occupied block, such that the following train may enter an occupied
track circuit at MAS and maintain MAS up to braking distance from the last
reported location of the end of the train ahead at the time the foll
owing train
entered the block.
20
Category
Expected Benefit
QMB provides a key migration step toward FMB, since alternative broken
rail and rollout detection is all that must be added to migrate from QMB
with PTL-EOT to FMB (along with software changes).
QMB can reduce delays caused by approach and time locking. When a
dispatcher needs to change a route already assigned to a train and the
train’s
braking curve indicates the train can stop before the interlocking, then the
route can be changed without time penalty.
Reliability-
Maintainability
Simplifies and reduces field components (such as field logic devices,
cabling, etc.) and facilitates diagnostics and maintenance
Facilitates removal of signal heads
2.4.3 QMB Core Principles
The QMB method of train control is based on several core principles:
Train authority is granted exclusively in the form of non-overlapping and electronically
delivered movement authorities or segments thereof (PTCEAs).
- Every train or other rail vehicle on controlled mainline track must have a PTCEA
(with the possible temporary exception of work gangs and equipment operating under
Track Bulletin Form B that have not yet been PTC equipped).
- Control of PTCEAs is centralized in the QMB office, which is responsible for
extending train PTCEAs and ensuring that they do not overlap.
- Trains are responsible for initiating roll-up of their own PTCEAs.
- The PTC onboard segment will determine its end-of-train location at the time its
PTCEA is to be rolled up, which may be in a vital manner (if based on reports from
PTL-EOT) or a non-vital manner.
The PTC onboard determines and enforces speed limit, based on the most restrictive of
PTCEA speed limit, train-specific speed restriction (where applicable), and track speed
restrictions, both permanent and temporary. In addition, it also limits speed according to
the braking curve as in EO-PTC when approaching a Stop, Stop and Proceed or
Restricting target.
Retention of WIU-to-locomotive peer-to-peer communication for a binary clear/not clear
report from each track circuit.
Many vital functions currently implemented in a distributed manner with field equipment
can be centralized, allowing for lifecycle cost savings.
- Interlocking logic can be centralized, allowing for the removal of components related
to field interlocking (centralization of interlocking logic can be done initially, or at a
later stage, after the PTCEA functionality has been operational for some time).
- Wayside signals and associated signal logic can be removed.
21
2.4.4 QMB System Architecture
QMB inherits most of the Overlay PTC architecture and design. The onboard retains all the
existing core functionality of the Overlay PTC system. The onboard also continues to obtain the
status of field devices from Wayside Status Messages (WSMs) generated by WIUs. The BOS
continues to be the interface between the back office and the field. Figure 13 illustrates the
overall QMB architecture.
Figure 13. QMB Architecture Diagram
The onboard requires new functions to determine the end-of-train location and to roll up its own
PTCEA. The end-of-train determination will include a safety margin to account for the level of
accuracy of the location determination system.
QMB also introduces a new functional component – the QMB officeresponsible for
controlling the issuance of all PTCEAs in the system. It keeps track of what PTCEAs have been
issued and what PTCEA roll-ups/extensions have occurred, keeping a vital record of what
segments of track are reserved for trains and what segments of track are available for use. It also
requires vital centralized interlocking functions, verifying that requested PTCEAs are safe to
issue, consistent with the current route status. It communicates with field devices (switches and
track circuits) via existing (PTC) communications paths to acquire their status and to issue
commands.
In QMB, routes through and between control points can be managed by and maintained in the
centralized interlocking functionality. Field wayside signals at intermediates and control points
can be removed, as PTCEAs and WSMs are communicated via data radio to the onboard.
PTCEAs provide the authority for train movements and track occupancy, and the onboard
determines speed and authority limit targets based on PTCEAs, WSMs, train-specific speed
restriction (where applicable), and track speed restrictions, both permanent and temporary.
The QMB office interfaces with the CAD system that the railroad uses to dispatch trains.
Through this interface, QMB receives train authority requests, including signaling route requests
and special authorities (such as track and time, track permit and reverse movements). It also uses
this interface to command switches in the field to the correct alignment and issue PTCEAs to
trains. It is expected that minimal changes are required to existing CAD systems.
22
2.4.5 QMB System Interfaces
PTC segment interfaces are slightly modified in QMB as compared to Overlay PTC to
accommodate the required modifications for the QMB architecture. Figure 14 depicts the
interfaces among PTC segments and external components.
Notice the following:
1. It is assumed that the existing BOS and Wayside Status Relay Service (WSRS) server,
along with their interfaces, remain unchanged.
a. It is assumed that the WSRS server contains the latest WSM updates from all
WIUs controlled by a railroad.
2. The existing distributed field interlocking logic can optionally be replaced by simplified
localized field electronics for monitoring field component status and for actuating
switches at control points.
3. The QMB office interfaces with WIUs using existing PTC communication paths (e.g.,
220 MHz radios) and a vital protocol; i.e., the traditional interface between the CAD
system and field interlocking (code lines) is not used.
Figure 14. QMB Interfaces Schematic Overview
23
2.5 Full-Moving Block
While various intermediate steps and other aspects of train control with incremental ROI will be
addressed, for the scope this project, the target end state is envisioned to be a standalone FMB
method of train control operation. Key potential operational advantages of FMB as compared
with Overlay PTC are increased capacity via reduced headways for line of road operations (see
Figure 15), fewer premature warnings/enforcements, and faster recovery from service
disruptions. FMB also offers a potential means to further reduce the amount of vital wayside
hardware needed (i.e., track circuits, since a suitable alternative means of broken rail detection is
required for FMB) and therefore a means to increase overall system reliability and safety
effectiveness. An additional benefit of shifting functionality from the wayside to the back office
is providing better diagnostics to the back office. A safety benefit of FMB train control is the
ability to prevent train collisions at restricted speed, which is also the case when operating with
QMB with PTL-EOT.
FMB operation is an enhancement to PTC; thus, anywhere it is used will be PTC territory. Any
trains not equipped for FMB would operate in the territory in fixed block mode or QMB mode,
with correspondingly longer headways associated with them.
Figure 15. Fixed Physical Signaling Blocks Impose Artificial Constraints, Resulting in
Excess Train Separation and Reduced Line-of-Road Track Capacity
For the purposes of this document, FMB operation is defined as one in which movement
authority can be issued up to the last reported rear location of the train ahead (versus issuing only
to the boundary of the last block the train occupies), and exclusive movement authority (PTCEA)
is conveyed to each train as a message containing a single From and To limit. When not in dark
territory, broken rail and rollout detection may be used in formulating each movement authority
message or may be conveyed to the train separately.
The overall architecture of FMB is equivalent to the architecture of QMB, as it is founded on the
principle of PTCEAs being issued from the back office to trains. The main differences are based
on the fact that FMB does not require track circuits for train location determination nor for
broken rail and rollout detection. Figure 16 illustrates the overall architecture of the FMB train
control method, depicting its main components and interfaces.
24
Figure 16. FMB Method Overall Architecture Diagram
To achieve operational benefits, FMB train control requires more precise and timely train
location information than what is provided by conventional track circuits. Such information may
be provided by an onboard location determination system that frequently transmits location
reports for the front and rear of the train.
Shorter headways can be achieved because a following train’s exclusive movement authority can
be advanced as soon as there is positive determination that the train ahead has cleared a segment
of track and has automatically truncated its authority behind it, rather than having to wait until an
entire track circuit block has been vacated. Theoretically, train separation under FMB control
could be reduced to the instantaneous braking distance of the following train. However, limited
location report update rates – typically due to limited Radio Frequency (RF) bandwidth, location
determination inaccuracies (front and rear of train), braking distance uncertainty, enforcement
warning time, and uncertainty in location of detected rail breaksrequire that some margin be
added to the train separation in a practical implementation.
FMB train control requires a fail-safe means to ensure that all trains operating in the territory are
located. Specifically, there must be a means to assure there is no unidentified train (that may not
be communicating for a variety of potential reasons) between two communicating trains. This
assurance is provided by a Safety Server function that keeps track of all train locations from the
time a train is dispatched, or its PTC system is initialized until it is terminated (or at least from
when it enters until it leaves PTC territory).
2.6 Centralized Interlocking
Conventional CTC systems interface with vital interlocking functions having fail-safe
components installed along the track, varying from older relay-based to modern microprocessor-
based systems. A conventional trackside interlocking architecture is illustrated in Figure 17.
Track circuits provide occupancy status of block segments while wayside signals convey
movement authorization to trains. Requests originated from the Dispatching System are
processed in the field at control points and the status of field components is reported back. The
interlocking also locally controls the position of switches and determines the aspects shown on
signals at control points. CTC systems obtain train presence information from track circuits and
provide authority with wayside signals; they do not consider the train as an explicit component
of the control system, but rather as an external component.
25
Figure 17. Conventional Field Interlocking Architecture Schematic
In a centralized architecture, the vital interlocking logic conventionally implemented in the field
is reallocated to central computers, as illustrated in Figure 18, which reduces the complexity of
vital components in the field and provides benefits related to maintenance and reliability.
Figure 18. CTC with Centralized Interlocking Architecture
With the advent of PTC, trains have become an active component of the train control system, and
QMB and FMB are designed to take advantage of that by sending movement authorities
containing vital route information to and receiving status directly from trains. This allows the
interlocking logic to be designed in a more flexible and possibly simpler way wayside signals
are removed as trains can receive authority on board and trains can directly respond to route
commands that affect interlocking functions, such as route canceling. This means that QMB and
FMB make a more compelling case for the centralized interlocking design when compared with
a conventional distributed system. Figure 19 illustrates QMB/FMB with a centralized
interlocking architecture, where the QMB/FMB office functions interact with trains to send
movement authorities and receive train updates. The QMB/FMB office functions interact or
integrate with the centralized interlocking segment to validate movement authorities and
command the field devices and receive their status.
26
Figure 19. QMB/FMB with Centralized Interlocking Architecture
Combined, the benefits of having a simplified field configuration and the integration of trains in
the overall train control design, a centralized interlocking design provides the following benefits:
Reduced maintenance costs due to the elimination of components (such as cabling,
signals, and field logic components) and use of lower cost, non-vital components in the
field
Easier configuration and maintenance procedures (since components are office-based
rather than field-based)
Potentially higher reliability due to reduction of functions implemented in the field and
higher availability components in the back office.
Potentially simpler and more flexible interlocking logic
Potential to increase capacity with the elimination and/or optimization of constraints
included in field interlocking design, such as time-locking for route cancelling requests.
Facilitates the implementation ofdriver control” in which dispatcher allows a designated
interlocking to accept requests from a specified train.
27
3. HRCTC Performance Analysis and Results
The performance of train control methods was assessed in two ways:
1. Ability to recover from the negative impacts of Overlay PTC: TTCI analyzed whether the
proposed train control methods would be able to compensate for the negative impacts in
railroad operations caused by the introduction of Overlay PTC. To estimate that ability,
TTCI ran railroad network simulations and calculated the total train travel times for each
of the train control methods. The results were compared to a baseline case of train
operations without PTC.
2. Capacity increase in railroad operation: TTCI also estimated the operational capacity
gains and headway reduction for each of the proposed HRCTC methods. This analysis
was developed in two ways: 1) with analytical calculations to estimate the theoretical
maximum gains; and 2) with results of railroad network simulation that provides results
closer to actual railroad operation as opposed to maximum theoretical estimation.
The following sub-sections describe the methodologies, input data and configuration parameters
used to develop each of the performance analyses, and the results obtained.
3.1 Methodology to Analyze the Ability to Recover from Overlay PTC
TTCI developed a methodology to analyze whether the proposed HRCTC methods can
compensate for the negative impacts in train operation introduced by Overlay PTC method. As
stated in Section 2.2, Overlay PTC introduces operational impacts on railroad operation due to
multiple causes that can be summarized in two main groups, related to:
The conservatism of the PTC enforcement braking algorithm
The occurrence of PTCIEs; i.e., failure of PTC components (hardware and software) and
human errors when operating the PTC system.
Potential gains that can be achieved with the proposed HRCTC methods due to higher reliability
and availability of underlying systems (e.g., decommissioning of field signals and/or replacement
of field interlocking with Centralized Interlocking) were not included in this analysis. Those can
potentially further increase the gains obtained with advanced train control methods such as QMB
and FMB.
The following steps describe the process followed by TTCI to estimate the performance of the
train control methods:
1. For pre-determined railroad operational scenarios, TTCI ran railroad network simulations
without PTC operation (non-PTC case); i.e., the operational conditions before the
introduction of PTC, and calculated the total train travel times. These simulations
produced the baseline reference for the comparison with the PTC methods.
2. For the same operational scenarios, TTCI simulated the network operation including only
the conservatism of the PTC braking enforcement algorithm when trains had to reduce
speed due to PTC speed targets, which produced the estimation of the negative
operational impact of the PTC braking algorithm when comparing the results with the
baseline.
28
3. Next, TTCI introduced the PTCIEs in the network simulations, which caused additional
delay to train operations. The combination of the train delays caused by the conservatism
of the PTC braking enforcement algorithm and the PTCIEs produced the overall negative
operational impact (expressed as train delay) of Overlay PTC when compared to the
baseline.
4. As a final step, TTCI ran the same operational scenarios, repeated steps 2 and 3 for each
of the proposed HRCTC methods (namely EO-PTC, QMB and FMB), and calculated the
train delays for comparison with the baseline.
Figure 20 illustrates the concept applied by TTCI to generate the comparison performance
among the train control methods. (Note that in this figure, the relative train travel time for each
method indicated along the dependent axis does not correlate with the actual results of the
analysis and are only shown here as an example of the methodology employed.)
Figure 20. Train Travel Time Comparison among Train Control Methods
The estimation of the total travel times for each train control method included the use of multiple
tools to simulate railroad network operation, compilation of results from simulations, calculation
of overall results, and analysis.
Figure 21 illustrates the performance analysis process macro flow developed by TTCI for this
project.
29
Figure 21. TTCI’s PTC Performance Analysis Process Macro Flow Diagram
The steps and tools used by TTCI as illustrated in Figure 21 are described below:
1. Selection of operational scenarios and details: Five operational scenarios, including
signaled single-track, double-track and triple-track, non-signaled territory, and DUA,
were selected. Details of each operational scenario, such as train schedules, train consist,
track characteristics, and others, were defined jointly with the participating railroads.
2. Definition of use cases: TTCI prepared a list of simulation runs required to develop the
performance analysis results. The list, identified as the Use Case Matrix, contains the
combination of simulation run cases describing the combination of parameters for each
case, such as type of operational scenario, density of trains, PTCIE, and operational
disruption events.
3. Configuration of the network simulation tool: TTCI configured the railroad network
simulation tool per the Use Case Matrix, ran the simulations, and gathered the total train
travel times obtained from each use case run.
4. Compilation of the results: The use case results were compiled for each type of analysis
being prepared. TTCI used two additional information sources that, combined with the
total train travel times, produced the overall performance results:
a. The MTBDE of the PTCIE, which defines how frequently a PTCIE is expected to occur.
b. The total train track mileage and train miles operated per type of operational scenario,
used to calculate average weighted results and produce overall and nationwide results.
30
3.1.1 Configuration Parameters Used in Network Simulations
TTCI used Rail Traffic Controller (RTC), a railroad network simulation tool from Berkeley
Simulation Software (BSS), to simulate railroad network operations and calculate train travel
times for the operational scenarios selected for this project. RTC is a widely used railroad
network simulation tool used by North American railroads. Its models and configuration
parameters have been extensively improved and validated by its users over many years.
TTCI created RTC models for five operational scenarios that include signaled single-track,
signaled double-track, signaled triple-track, non-signaled territory, and dense urban area (DUA).
Each RTC model was configured with typical operational parameters including train schedules,
train consist, and track layout. Details of each operational scenario are included in Appendix A.
TTCI prepared requirements for the necessary additional capabilities to model PTC operation
and provided them to BSS and FRA for implementation in their respective railroad network
simulation tools. The requirements included features to simulate the conservatism of the PTC
braking enforcement algorithm, the operational principles of each type of train control method,
and the impact caused to train operations due to the occurrence of PTCIE. TTCI worked
extensively with BSS to test and validate the PTC features developed in RTC. Details of the PTC
simulation requirements prepared by TTCI are included in Appendix G.
The negative impacts or positive gains obtained under each train control method depend on the
density of trains operating in the network, as each train control method allows for different
minimum headway, as well as the indirect impact to trains caused by PTCIEs, such as when a
train stops or reduces speed due to a failure of a PTC component that causes trains behind and
sometimes trains in the opposite direction to also reduce speed or stop. TTCI ran RTC
simulations at selected train density levels, identified as Track Utilization Levels (TUL), to
assess the performance of each train control method as train density varies. TTCI used four
TULs as a percentage – 25, 50, 75, and 100 percent – of the maximum practical capacity of each
operational scenario. Appendix B describes the details of the calculation of the TULs used in this
analysis.
TTCI also ran RTC simulations, introducing typical operational disruption events not related to
PTC operation – such as track outage for maintenance and repair. The simulation results were
used to assess the ability of the proposed train control methods to better recover from those types
of events. Section 3.1.6 describes the details of the operational disruption scenarios used for this
analysis.
TTCI ran several RTC simulations combining the above described configuration parameters, as
shown in Table 3.
31
Table 3. Simulation Use Case Matrix
QMB can be implemented using current track circuits, with shorter track circuits, with NGTC, or
potentially other broken rail detection technology. Due to limitations in simulation time and
capabilities, this project looked only at half-length track circuits, considering that configuration
to be representative of the type of improvement possible with QMB, and recognizing that the
actual improvements may be different if NGTC or other methods are used.
3.1.2 Train Delay Calculation
TTCI used the train travel times from the RTC simulations as the core data to calculate the
performance of the train control methods.
For a given case within the Use Case Matrix, RTC simulation runs were executed and the total
travel time (arrival time at destination minus departure time at origin) of all trains in the
simulation was accumulated, generating the total travel time for the case, as expressed in:
() = ()()

 (1)
Where NTrains is the total number of trains in the simulation. The total delay for a train control
method (TC) was calculated by comparing the total train travel time of that train control method
with the baseline (no PTC) for the same case configuration parameters, as expressed in:
(,)=(,)(,)
(2)
The total miles operated by all trains in the simulation was also accumulated, generating the total
train miles operated for that case. The average delay per train mile was calculated by dividing the
total train delay by the total train miles of that case, as expressed in:
(,)= (,)/() (3)
TTCI also combined the train delay calculations of the five operational scenarios to generate the
overall train delay for each of the train control methods. This was done by weighting the train
Train
Control
Method
PTCIE
Operational
Disruption
Number
of TUL
Number of
Operational
Scenarios
No PTC
(Baseline)
No
YES 4 5
No
YES 4 5
9
No
1 5
No
YES 4 4
9
No
1 4
No
YES 4 4
9
No
1 4
No
YES 4 5
9
No
1 5
Overlay
PTC
EO-PTC
QMB
FMB
32
delay calculation with the proportion of total train miles operated over a period of time for each
of the operational scenarios (OS), as expressed in:
()= ,() ()
 (4)
Where:
()=()
 (5)
3.1.3 Operational Scenario and Nationwide Performance Extrapolation
TTCI used the total PTC train miles (i.e., total train miles operated in territories where PTC is
required) per operational scenario provided by three Class I railroads for 1 year of operation to
calculate the proportion of total train miles for each operational scenario compared to the total
train miles of all operational scenarios combined. The proportions were used to aggregate the
train delay calculations for a train control method, as explained in Section 3.1.2.
As the total PTC train miles was not available for all railroads nationwide, TTCI extrapolated the
total train miles based on the data provided by the three Class I railroads to nationwide figures to
estimate total nationwide train travel time delays. TTCI used the total PTC route miles provided
in FRA’s dashboard [1], by extrapolating the total PTC train miles from the three Class I
railroads to the proportion of PTC route miles between the three Class I railroads and the total
route miles nationwide, as shown in Table 4.
Table 4. Total PTC Route Miles from the FRA PTC Dashboard
Table 5 shows the total train miles operated in 1 year for each operational scenario, their
proportion compared to the total train miles operated in all operational scenarios, and the
nationwide extrapolation of total train miles using the FRA PTC Dashboard route miles data.
Table 5. Percentage of Train Miles per Operational Scenario and
Nationwide Extrapolation
All Railroads 58,436
3 Class 1 RRs 38,365
FRA PTC Dashboard
PTC Route
Miles
3 Class 1 RRs Nationwide
Non-signaled 3% 8,233,163 12,540,418
Signaled Single Track 42% 127,481,071 194,173,957
Signaled Double Track 41% 126,537,651 192,736,979
Signaled Triple Track 3% 8,446,029 12,864,645
DUA 11% 34,593,764 52,691,808
TOTAL 100% 305,291,679 465,007,808
Total Annual Train-miles
Operational Scenario
Percentage
33
3.1.4 Operational Impact of the PTC Braking Algorithm
Three types of train braking operation were modeled to simulate the operation of PTC:
1. Full-service application: Used to decelerate a train for an enforcement, such as when the
PTC onboard hardware fails.
2. Normal service application without PTC target: Used by the crew to decelerate at targets
that are not PTC enforced, such as when a passenger train stops at a station.
3. Normal service application with PTC target: Used by the crew to decelerate to comply to
PTC enforced targets, such as a Stop signal or a Speed Restriction.
Figure 22 illustrates the braking curves of the three types of PTC braking operation.
Figure 22. Train Braking Curves
As indicated in Figure 22, the train braking deceleration rate when the train engineer is reducing
speed to a non-PTC target (curve 2) is less than the full-service braking application (curve 1).
Assuming that the PTC braking enforcement algorithm includes conservatism, including the
engineer’s reaction to PTC warning time, researchers expected that the PTC target braking rate
(curve 3) is less than the non-PTC target braking rate (curve 2).
RTC already has braking rates configured for the full-service application (curve 1) and for the
non-PTC braking application (curve 2) for multiple train classes, and those were used in the
simulation runs developed for this project.
TTCI estimated the PTC target braking rates (curve 3) based on simulations using TTCI’s Train
Operation and Energy Simulator (TOES) and the PTC braking enforcement algorithm
currently in use by the Class I railroads. TTCI ran multiple simulations with various train and
track characteristics simulating the braking performance of the onboard PTC braking algorithm.
Based on the results of the simulations, TTCI calculated average PTC target braking rates for
selected train classes. Appendix D contains the details of the PTC braking rate simulations and
calculations.
TTCI calculated the operational impact introduced by the conservatism of the PTC braking
algorithm by running RTC simulations for the same scenario twice and comparing the train
travel times for each case:
34
Non-PTC case: Trains were configured with non-PTC target braking rates for signal
indication and speed restriction targets.
PTC case: Trains were configured with PTC target braking rates for signal and speed
restriction targets.
Table 6 shows the braking rates used in RTC simulations for the different train classes.
Table 6. PTC Target Train Braking Rates Used in RTC Simulations
3.1.5 PTC Impact Events and RAM Parameters
TTCI used RTC simulations to estimate the operational impacts caused in a railroad network due
to the occurrence of PTCIEs (failure of PTC components, hardware and software, and human
errors when operating the PTC system). TTCI configured cases where those events were
triggered during RTC simulation and measured the train delays as explained in Section 3.1.2.
TTCI ran RTC simulations separately for each type of PTCIE, configuring the occurrence of the
event and the time for the recovery from the event, identified as Mean Time to Recover (MTTR).
TTCI ran multiple RTC runs for each PTCIE case, according the following specifications:
At five different locations in the operational scenario
At six different times during the day
With 20 different simulation seed numbers (that cause each run to have variable train
departure times, based on the configuration of train departure variance)
The results of the 600 simulations were compiled and analyzed and average train delay results
were calculated (PTCIETrainDelay).
TTCI used the PTCIE’s MTBDE to calculate the total train delay per train mile of a PTCIE.
TTCI first calculated the probability of occurrence of one PTCIE over one year of operation by
dividing the total hours in one year by the MTBDE, as shown in:
PTCIEOccurrence = HoursYear / PTCIEMTBDE (6)
For events related to PTC components with multiple occurrences in a scenario, such as a WIU,
TTCI multiplied the PTCIEOccurrence by the number of those components in a scenario.
From the RTC simulation, TTCI calculated the total train miles operated in 1 year for a use case
simulation (TotalTrainMiles).
The final calculation of the total train delay per train mile caused by a PTCIE is shown in:
PTCIEDelayperMile = PTCIEOccurrence * PTCIETrainDelay / TotalTrainMiles (7)
Non-PTC
Target
PTC Target
Expedited 0.6 0.32
Freight 0.5 0.29
Passenger 1.5 1.06
Braking Rates (MPH/s)
Train Class
35
The PTCIE simulation included events that occurred at terminal prior to train departure and en
route, i.e., after train departure from terminal. Table 7 shows the list of PTCIEs included in the
Use Cases and the description of their impact on operation.
Table 7. List of PTC Impact Events Included in Use Cases
Type
PTC Impact Event
Description
Operational Impact
Terminal
Initialization
Delay
Issues during initialization for
multiple reasons (user error,
onboard failure, etc.) that cause
train delay.
Train is delayed at departure until
problem is resolved.
Onboard
Hardware Failure
Replace
Locomotive
Onboard hardware failure non-
recoverable that requires
replacement of lead locomotive.
Train is delayed at departure until
lead locomotive is replaced.
En route
PTC Wayside
Failure
Failure of a wayside component
that prevents a train from
receiving a WSM from a WIU.
Depending on the type of WIU,
trains stop or reduce speed and
operate at RSR through next
block.
Onboard
Hardware Non-
Recoverable
Failure of onboard hardware that
is non-recoverable.
Train is enforced, onboard PTC
system is cut out, and train
resumes in Reduced speed.
Onboard Software
Recoverable
Failure of onboard software that
is recoverable after reboot.
Train is enforced, onboard PTC
system is rebooted, and train
resumes at Normal speed.
BOS-Loco Link*
Failure of BOS-loco link that
prevents locomotive from
communicating with back-office.
Depending on the type of
communication backbone and
size of gaps, trains may disengage
(at WIUs with radios) or not
receive a WSM (WSRS territory).
Back Office
Downtime
Back office downtime due to
failure or maintenance
Trains operating in the territory
controlled by the back office
disengage PTC after timeout and
resume normal operation when
back office is back up.
Sync Error
Synchronization error between
the back office and the onboard
systems
Train disengages PTC, runs at
reduced speed, then resumes
normal operation after error is
resolved.
Operator Error
Speed
Enforcement
Train engineer does not apply
brakes per onboard instructions.
Train is enforced and resumes
normal operation after train
engineer communicates with
dispatcher.
36
Type
PTC Impact Event
Description
Operational Impact
Operator Error
Other
Enforcement
Other type of train engineer error
that causes the onboard to enforce
the train.
Train is enforced and resumes
normal operation after train
engineer communicates with
dispatcher.
The RAM parameters MTTR and MTBDE of the PTCIE events were obtained from field
data collected by railroads during actual PTC operation on their revenue lines. Field data was
collected in two periods:
1. Data provided in 2017 from multiple Class I railroads. Most of the field data was
collected from the start of PTC operation (prior to 2017) until the third quarter of 2017.
Older data (prior to 2017) was used to verify trends of the RAM parameters and to help
project those to the time when PTC will be fully deployed. TTCI worked with the
participant railroads to identify overall improvements (in the system, people, processes)
being implemented or projected to be implemented by the time PTC is fully deployed and
incorporated the impact of those in the RAM parameters.
2. Data provided in 2019 from a Class I railroad. The field data contained data from 2018
operation and was used to estimate the RAM parameters for PTCIEs that the 2017 data
did not contain. The railroad that provided the data was in an advanced stage of
deployment, with almost the entirety of its PTC-controlled territory in revenue operation;
i.e., close to full deployment. For that reason, the RAM parameters used were the values
of the trends at the end of the collection period (December 2018).
Table 8 shows the list of RAM parameters and source data for each of the PTCIEs.
37
Table 8. List of PTC Impact Events and their RAM Parameters
PTC Impact Event
MTBDE
(Hours)
MTTR
(Hours) Source
PTC wayside hardware failure1
14,490
1.85
2017 data
Onboard hardware non-recoverable
12,675
0.10
Onboard software recoverable
201
0.33
BOS-loco link2
21,031
2.00
Back office downtime
4,231
0.22
Sync error
1,668
0.45
Operator error – speed enforcement3
4,965
0.10
2018 data
operator error other enforcement3
596
0.10
initialization delay3
4,183
0.33
Initialization onboard hardware failure3
45,041
1.00
Notes:
1 Same value used for all WIU types.
2 Not including availability of cell service.
3 MTTR values are based on expert opinion.
As noted in Table 8, TTCI also included the availability of cell service as a redundant
communication link between the back office and the locomotives to calculate the BOS-Loco
Link. Details of the calculation of the BOS-Loco link availability is described in Appendix E.
3.1.6 Operational Disruption Events
TTCI analyzed the ability of the HRCTC methods to recover from operational disruptions. The
analysis was based on typical operational disruptions (not caused by PTC) that railroads
experience on a regular basis that cause a track to be taken out of service until the maintenance
staff arrives at location, makes the repair, and releases it for normal operation. Long
duration/catastrophic track outages were not investigated as those are considered exceptional
events.
The operational disruption scenario was simulated in RTC per the following:
Temporary speed restriction is placed at the track where the problem was reported until
maintenance gang arrives:
- 2.5-hour duration for single-track, double-track, triple-track, and non-signaled territory
- 1.5-hour duration for DUA
Track is taken out-of-service for repair:
- 1.5-hour duration for single-track, double-track, triple-track, and non-signaled territory
- 1.0-hour duration for DUA
Track is released for normal operation.
38
Due to the speed restrictions and track outage, trains tend to accumulate where the event
occurred. When the track is released, trains will resume operation limited to the constraints of
minimum train separation and maximum speeds imposed by the train control methods.
Researchers expected that more advanced forms of train control should provide better ability to
recover from these types of events as they impose fewer constraints to following move
operations.
RTC simulations were executed without and with operational disruptions for the same case and
the train travel times from the simulations were compiled and compared to produce the results.
The method to compile and compare the results was done per the following sequence:
1. Run RTC for a scenario without disruption event and calculate total train travel time
without PTC (baseline) and with another method of train control (e.g., QMB).
2. Calculate the difference between the total train travel times of the two simulation runs
(e.g., baseline and QMB), as illustrated in Figure 23.
3. Run RTC for the same case but introduce the disruption event in the simulation and
calculate the total train delay difference of the two simulation runs, as illustrated in
Figure 24.
4. Compare the train delay results of the two scenarios with and without the operational
disruption, as shown in Figure 25.
Figure 23. Calculation of Train Delay without Operational Disruption
39
Figure 24. Calculation of Train Delay with Operational Disruption
Figure 25. Comparison between the Results of the Two Disruption Scenario Cases
The difference in train delay between the two scenarios indicates the ability of an HRCTC
method (such as QMB) to better recover from the operational disruption compared to the
baseline. The intrinsic gain illustrated in Figure 25 indicates the capacity gain that the train
control method provides compared to the baseline, independent of the operational disruption
event and thus, must be distinguished when analyzing the train delay results.
3.2 Results of the Ability to Recover from Overlay PTC Analysis
TTCI analyzed the ability to recover from Overlay PTC applying the methods described in
Section 3.1.
40
TTCI developed simulation runs for the multiple TULs (25, 50, 75, and 100 percent) as defined
in Section 3.1.1., for the signaled single-track, double-track, triple-track, and non-signaled
territories. For the DUA operational scenario, the simulations were run with train traffic volumes
at the levels estimated for 2020, in the model based on the Chicago downtown area, as described
in Appendix B. The DUA traffic volumes vary throughout the day, ranging from very high
volumes in passenger routes at peak operation times (close to 100 percent TUL) to much lower
volumes at non-peak-operation times. As the average daily train traffic volume in the DUA is
between 50 percent and 60 percent TUL, the DUA results were included in the 50 percent TUL.
The PTC impact events were simulated only at 50 percent TUL due to limitations in the project
budget; however, the train delay results without PTCIEs calculated for the other TULs can
provide a good estimation of the gains that can be obtained with the proposed HRCTC methods.
Table 9 shows for each TUL the operational scenarios that were analyzed are whether PTCIEs
were included in the simulations.
Table 9. List of Cases Developed per TUL
TUL PTC Impact
Event
Operational Scenario
Single Track
Double Track
Triple Track
Non-signaled
DUA
25
NO
YES
YES
YES
YES
NO
50
YES
YES
YES
YES
YES
YES
75
NO
YES
YES
YES
YES
NO
100
NO
YES
YES
YES
YES
NO
The following subsections describe the results obtained at various TUL and with various train
control methods. The total train-mile data provided by the 3 Class I railroads (Section 3.1.3) are,
on average, at ~45 percent TUL, thus the overall results at 50 percent TUL provides a
representative average estimation of nationwide results and was the scenario chosen to include
the PTCIE simulation. Section 3.2.2 presents comparative results among train control methods
per TUL. The analysis of the ability to recover from operational disruptions was conducted
separately and the results are presented in Section 3.2.3.
3.2.1 Overall Results at 50 percent TUL
Figure 26 shows the results for total train delay per 100 train-miles of operation for each of the
train control methods, compared with the baseline. The baseline results are for operation without
PTC. The results include an aggregation of the results from all five operational scenarios
(signaled single-, double-, and triple-track; non-signaled; and DUA) at 50 percent TUL. The
graph to the right (a) shows the results with PTC impact events (PTC equipment failures and
PTC operator errors), while the graph to the left (b) shows the results without PTC impact
events. As explained in Section 2.2, the gains obtained with QMB are based on halving track
circuit lengths for the signaled territories.
41
Figure 26. Total Train Delay per 100 Train-Miles at 50 percent TUL
The nationwide total train delay in hours per year was also calculated based on the nationwide
numbers calculated in Section 3.1.3. Figure 27 shows the nationwide total train delay hours per
year including all operational scenarios and PTCIEs based on the nationwide extrapolation
numbers (see Table 5).
Figure 27. Total Train Delay per Year at 50 percent TUL
The train delay difference between train control methods (shown by the blue lines in Figure 28)
is equivalent when comparing the cases with and without PTCIEs. Figure 28 shows that the
difference between FMB and Overlay PTC remains at approximately 2.5 minutes/100 train-miles
whether with or without PTCIEs. This comparison suggests that the reduction in delay when
advancing the train control method remains fairly constant whether or not PTCIEs occur.
a.
b.
42
Figure 28. Comparative Train Delay Differences versus Train Control Method between
Cases with and without PTCIEs at 50 percent TUL
The main takeaways from these results, given the limitations and assumptions in the analysis
discussed in Section 3.1:
EO-PTC could provide enough benefit to recover from negative impacts caused by
Overlay PTC.
Train delay decreases as train control methods advance, whether or not PTCIEs occur.
3.2.2 Comparative Results among Train Control Methods
The next set of figures show the comparative results between the train control methods per TUL
and operational scenario. For all the results, the baseline is the non-PTC model and QMB is
configured with half-length track circuits.
The main takeaways for the 25 percent TUL results shown in Figure 29, given the limitations
and assumptions in the analysis discussed in Section 3.1:
Greater improvements are obtained on single-track due to meet/pass resolution.
Improvements are more significant when moving from Overlay PTC to EO-PTC because
of relaxing the speed restrictions normally associated with Approach and Advance
Approach.
FMB gains are greater in double-track than in triple-track at this low traffic volume
because, in the scenarios analyzed, double-track is predominantly freight traffic with
trains operating at different speeds; triple track has a greater density of passenger and
commuter traffic operating at uniform speeds. The freight trains in the double-track
scenario are able to operate closer with FMB than in other methods, thus benefit more
with the FMB operation compared to the passenger/commuter trains, which may already
be operating closely together, given the uniformity in operation.
43
Figure 29. Total Train Delay for Each Operational Scenario at 25 percent TUL
The main takeaways for the 50 percent TUL results shown in Figure 30:
Significant improvements are obtained in the DUA with more advanced train control
methods. This may be explained by the fact that, in a DUA, a PTCIE can affect a higher
number of trains. For example, if a WIU is connected to a control point that serves
multiple track lines, and a train in one subdivision is delayed or stops, it affects not only
traffic in the subdivision the impacted train is operating on, but it can also affect traffic
from other subdivisions that converge to that subdivision.
Train traffic volume in the DUA is near 100 percent TUL at rush hour, and there are
more trains operating in close following moves that are affected by a PTCIE, which
significantly influences the results.
Figure 30. Total Train Delay for Each Operational Scenario at 50 percent TUL
44
Results in double- and triple-track scenarios at 75 percent TUL, presented in Figure 31, show
greater improvement in QMB and FMB compared to lower TUL results, because with more
trains operating, the ability for the trains to operate closer together in these modes of operation
creates more opportunities for gains.
Figure 31. Total Train Delay for Each Operational Scenario at 75 percent TUL
Results in double- and triple-track scenarios at 100 percent TUL, presented in Figure 32, show
increasing gains as the train control method advances similar to what was noted at 75 percent
TUL. Triple-track results become more significant as compared to double-track, because the
triple-track scenario modeled has predominantly passenger trains that, at higher train traffic
volumes, create more opportunities for multiple impacts (i.e., impacts to a train or to a location
affecting multiple trains).
Figure 32. Total Train Delay for Each Operational Scenario at 100 percent TUL
45
3.2.3 Results of the Ability to Recover from Operational Disruption Events
The analysis of the ability to recover from operational disruption was developed as described in
Section 3.1.6. The analysis was performed at 50 and 75 percent TUL. The results of the 25
percent TUL cases were not meaningful due to the large separation of trains, which caused few
chances for train accumulation. The results of the 100 percent TUL were discarded because RTC
dispatching decisions when the network becomes strangled were often masking the train delay
results as a result of poor local decisions.
The results of the analysis were calculated in train delay per 100 train-miles of operation caused
by the occurrence of one operational disruption event. Analysis of the DUA scenario were
developed only for the projected 2020 traffic and included in the 50 percent TUL case.
Figure 33 shows the results at 50 percent TUL including all modeled operational scenarios.
Figure 34 shows the results at 50 percent TUL and Figure 35 at 75 percent TUL, both without
DUA results, for comparative analysis.
The main takeaways from the results:
Ability to recover improves as the method of train control advances and density of trains
increases because recovery occurs when trains accumulate – which occurs more
frequently at higher train density.
Ability to recover is greater in the DUA scenario because of the effect of trains operating
over multiple tracks and the influence of passenger lines operating close to capacity at
peak operation times.
Ability to recover improves with more advanced train control methods (compared to less
advanced methods) at higher TUL because: a) more advanced train control methods
allow for faster recovery, and b) there is less train accumulation in more advanced
methods at lower TULs.
Figure 33. Capacity to Recover from Disruption Event at 50 percent TUL,
Including DUA Results
46
Figure 34. Capacity to Recover from Disruption Event at 50 percent TUL
without DUA Results
Figure 35. Capacity to Recover from Disruption Event at 75 percent TUL
without DUA Results
3.2.4 RAM Analysis of PTC Impact Events
TTCI estimated the impact on train operations according to the methodology described in
Section 3.1.5. The total impact on the performance of the train control methods was included in
the analysis shown in Section 3.2.1. Table 10 shows the contribution of each type of PTCIE to
the total train delay.
47
Figure 36 shows the distribution of the train delay for each type of PTCIE for the Overlay PTC
method, based on the numbers shown in Table 10.
Table 10. PTCIE Train Delay (minutes/100,000 train-miles)
for Each Train Control Method
PTC
Impact Event
RAM Parameters
(hours) Train Delay (minutes/100,000 train-miles)
MTBDE
MTTR
Overlay PTC
EO-PTC
QMB
FMB
En route onboard
software recoverable 201 0.33 7.7695 8.2026 7.8379 7.2673
En route operator error
other enforcement3 596 0.10 0.8438 0.9678 0.7929 1.0114
Initialization delay3
4,183
0.33
0.2167
0.2091
0.2071
0.2103
En route operator error
speed enforcement3 4,965 0.10 0.1013 0.1162 0.0952 0.1214
En route onboard
hardware non-
recoverable
12,675 0.10 0.0867 0.0943 0.0900 0.0887
En route sync error
1,668
0.45
0.0844
0.0741
0.1152
0.1387
Initialization onboard
hardware failure3 45,041 1.00 0.0588 0.0583 0.0577 0.0586
PTC wayside hardware
failure1 14,490 1.85 0.0208 0.0215 0.0282 0.0219
Back office downtime
4,231
0.22
0.0003
0.0002
0.0003
0.0004
BOS-loco link2
21,031
2.00
0.0000
0.0000
0.0001
0.0001
Notes:
1 Same RAM values used for all WIU types.
2 Includes availability of cell service.
3 MTTR values are estimated.
48
Figure 36. Relative Contribution of Each Type of PTCIE to Train Delay
(minutes/100,000 train-miles) in Overlay PTC
The En Route Onboard Software Failure Recoverable type of PTCIE is the main contributor to
train delay. The main reason for the high contribution of this type of PTCIE is the high number
of occurrences (low MTBDE) compared to the other PTCIEs. Additionally, researchers assumed
that the RAM parameters for this PTCIE would not appreciably change when PTC is fully
deployed while for most of the other PTCIEs, based on 2017 data, the RAM parameters were
adjusted considering trends and improvements. It is also relevant to note that the onboard
segment contains software in multiple onboard segment components with interfaces to other PTC
components and non-PTC systems and the actual root-cause of the event was not available for
investigation in this analysis.
The next main contributor to delay is the En route Operator Error Other type of PTCIE. This may
indicate that, at the time data was collected, system operators were not yet totally familiarized
with the operation (i.e., still in the learning curve stage), or the system may still require
adjustments to become more user-friendly.
Appendix F contains detailed results of the contribution of the PTCIEs per operational scenario
and train control method.
3.3 Analysis of Capacity Increase Gains
The analysis of the capacity gains provided by the HRCTC methods was performed in two ways:
1. Estimation of theoretical maximum capacity gains developed with analytical calculations
of minimum headway separation for simplified selected models.
2. Estimation developed with the results of the RTC simulations of the operational scenarios
described in Section 3.1.
The subsequent subsections describe the results obtained in each case.
49
3.3.1 Estimation of Theoretical Maximum Capacity Gains
The estimation of theoretical maximum capacity was implemented with analytical formulas in
Microsoft Excel for selected operational scenarios per the following:
Various train consists: three loaded, three empty
Two train speeds per train type: 30 mph and track speed (50, 60 and 70 mph) per train
class
Three signal block lengths: 3,000; 6,000; and 12,000 feet
Scenario specifics:
- Trains are uniform in type within each case modeled.
- All trains on level single-track at constant speed in a single direction, resulting in
uniform minimum headway for each scenario.
- Performance estimates do not account for conservatism in braking algorithm and
occasional loss of messages.
Figure 37 shows the results of the calculation for one scenario containing the headway separation
of a train with 100 empty coal cars at 60 mph for a conventional signaling system at various
block sizes, EO-PTC, and FMB. Appendix C provides detailed results of the calculations for
each scenario.
Figure 37. Theoretical Train Headway Results for Trains with 100 Empty Cars at 60 mph
The results of the analytical calculations for each case were compiled. Figure 38 shows the
headway reduction percentages obtained with EO-PTC and FMB compared with conventional
signaling systems.
50
Figure 38. Compiled Results of Theoretical Maximum Headway Reduction for EO-PTC
and FMB Compared to Conventional Signaling for Various Block Sizes
Based on the headway reductions, TTCI calculated the maximum theoretical capacity increases.
Figure 39 shows the maximum theoretical capacity increases obtained with EO-PTC and FMB
compared to conventional signaling systems.
Figure 39. Compiled Results of the Theoretical Maximum Capacity Increase for EO-PTC
and FMB Compared to Conventional Signaling for Various Block Sizes
The results show that, compared with conventional signaling, potential improvements from EO-
PTC and FMB are significant when operating at speeds above the 30-mph restriction associated
with a conventional Advance Approach signal aspect (when operating at constant speed in
following moves). FMB also provides significant improvement at slower speeds.
3.3.2 Capacity Increase Based on Simulation of Operational Scenarios
While the theoretical results obtained in Section 3.3.1 show significant capacity for increase,
depending on train speeds and signaling system block sizes, not necessarily all the potential
capacity can be realized in actual railroad operation. To better assess what can be actually
achieved under less uniform conditions, TTCI analyzed the results of the RTC simulations of the
operational scenarios described in Section 3.1, as those operational scenarios are based on actual
railroad configurations and operational characteristics.
51
The analysis is based on the comparison among the train control methods of the total train-miles
operated over a certain period. The sooner a certain number of train-miles is reached under the
same TUL, the more efficient the method. The analysis included only signaled single-, double-,
and triple-track operational scenarios and did not include operational disruption events.
Figure 40 shows the results of the comparative performance of all train control methods
considered on this project for the single-, double-, and triple-track operational scenarios, without
PTCIEs nor operational disruption events. The vertical dashed lines indicate the average train
trip times (minutes/100 train-miles) for each train control method at the four TULs (25, 50, 75
and 100 percent). The difference of the TUL reached at a certain train trip time, indicates the
capacity increase between control methods for the particular operating point (130 minutes/100
train-miles) shown.
Figure 40. Capacity Increase Estimation Based on Simulation Results
The TUL values reached for each train control method at 130 minutes/100 train-miles indicated
visually in Figure 40 are shown in Table 11.
Table 11. TUL at 130 Mins/100 Train-Miles per Train Control Methods
Table 12 shows the proportional TUL differences among the train control methods. The row
heading “Labelin Table 12 refers to the labels shown in Figure 40.
No-PTC Overlay PTC EO-PTC QMB FMB
TUL (%) 80.5 79.0 83.9 86.4 88.9
52
Table 12. Capacity Comparisons between Train Control Methods at
130 Mins/100 Train-Miles
The results shown in Table 12 are the estimated capacity gains at the selected train trip time (130
minutes/100 train-miles). More significant capacity gains are expected to occur at higher TULs
based on the visual indication of Figure 40 that shows higher TUL difference between train
control methods as train trip time increases.
3.4 Conclusion of the Performance Analysis Results
The results obtained from the performance analyses described in Section 3.3 are as follows:
The proposed HRCTC methods can compensate for the negative impacts introduced by
Overlay PTC.
- Researchers expected that EO-PTC, if implemented in all PTC-controlled territories,
could be sufficient to compensate for the negative impacts introduced by Overlay
PTC.
- EO-PTC performance is more significant in single-track territories, due to meet-pass
encounters.
- Territories where passenger trains are predominant provide higher performance gains
at higher TUL.
- More advanced train control methods provide greater performance gains (in terms of
headway, capacity and delay) and greater ability to recover from operational
disruption events.
Theoretical maximum capacity gains show significant results, depending on train speeds
and signaling system block sizes, which can reach up to more than 50 percent with EO-
PTC compared to non-PTC and more than 200 percent with FMB compared to non-PTC.
Capacity gains based on the simulation of operational scenarios increase as the train
control method advances. Estimated gains when operating at approximately 80 percent
practical capacity can reach:
- A 1.9 percent reduction from non-PTC to Overlay PTC
- A 6.2 percent increase from Overlay PTC to EO-PTC
- A 3.0 percent increase from EO-PTC to QMB
- A 2.9 percent increase from QMB to FMB
Overlay PTC EO-PTC QMB FMB
Label
1234
-1.9% 6.2% 3.0% 2.9%
-1.9% 4.2% 7.3% 10.4%
N/A 6.2% 9.4% 12.5%
Compared to
Previous TC
Capacity
Increase (%)
Compared to no PTC
Compared to Overlay PTC
Train Control Method
53
4. High-Level Migration Plan
The timeline and order of steps in the migration plan will determine when various developments
are needed. Conversely, the projected availability of enabling technologies will influence the
migration plan.
The necessity of achieving positive ROI at each incremental step will also drive the migration
roadmap. This includes multiple aspects:
Cost of implementation of the new technologies.
Maintenance cost increases associated with the introduction of new technologies and
reductions associated with the decommissioning of systems that are being replaced or no
longer needed.
Revenues associated with current and projected train traffic volumes, along with revenue
impacts associated with any other resulting changes to operations.
Costs to expand capacity with current train control methods and track (when possible as
an alternative) compared with the proposed HRCTC methods.
The capacity gains obtainable with the proposed HRCTC methods will be a key factor in the
decision to migrate a certain territory, particularly in areas where operation is close to practical
capacity and there is demand for an increase. Depending on the traffic demand and other
considerations, it is possible that a railroad may decide, for example, upon a lower-cost method
that can provide the capacity gains required for a certain territory rather than adding another
track. Consideration should be given to which solutions are best suited for particular scenarios or
types of control territory. For example, implementing FMB train control in dark territory could
be a better option than installing signaling as a means to increase capacity. FMB could also be a
more cost-effective option than subdividing track circuits and increasing the number of aspects
to increase capacity in very high-traffic scenarios.
The proposed HRCTC methods are conceptually defined as different modes for the same train
control system, which allows railroads to operate all methods at a given time at different locations.
This will require additional care in the migration plan with regard to the following aspects:
Seamless transition of operation between train control methods
Revision of operational and maintenance procedures, rules and documentation
Training of operational and maintenance staff
Railroads have historically dealt with the introduction of many new train control methods and
technologies that modify their operation. However, the proposed HRCTC methods may be
introduced at a much faster pace than previously experienced by the railroads and the
conventional train control methods currently in operation will not necessarily cease to be
operated in some locations. It is likely that railroads will have to operate and maintain all train
control methods – current and proposed HRCTC – at least for a certain period of time, until old
train control methods can or need to be decommissioned. Some older methods of train control
may never be completely retired if they are need for failure and fallback operations, or if the
operation on certain territories does not justify the costs of converting to a more advanced
54
method of train control. Special attention should be given to the aspects related to safety, both
from the system design and operational procedures perspectives.
Theoretical migration paths are possible, based on the starting point of the migration; i.e., today’s
method of operation (CTC, ABS, TWC, etc.) with Overlay PTC. EO-PTC is a method that
benefits from relaxation of the speed restrictions imposed by Approach and Advance Approach
signal indications and consequently can only be implemented in signaled territories – non-
signaled territories generally should not migrate to EO-PTC but most likely directly to FMB.
Territories that currently have signaling can migrate to any HRCTC method. Train traffic density
is another major parameter that can influence the migration plan. Higher train traffic density may
justify the transition to a more advanced method of train control.
Based on the performance analysis results, shown in Sections 3.2 and 3.3, and on the design of
the proposed HRCTC methods, the following factors should be considered during the migration
decision analysis:
Transition of signaled territories to EO-PTC – from the system perspective, EO-PTC only
requires the editing of a track database. All other changes required for EO-PTC are
related to operations (rule changes, indication, and special instructions at transition points
and training). Based on that and on the expected capacity gains, even at lower train
density, migration to EO-PTC is strongly recommended for all signaled territories as long
as train consist information is provided with high integrity and timeliness to the PTC
system.
EO-PTC provides more significant benefits in single-track configurations. This suggests
that if a railroad decides to do phased implementation of EO-PTC, single-track territories
should probably be implemented sooner.
Territories currently having high TULs (~75 percent or greater), especially those
predominantly driven by passenger train traffic, are estimated to realize greater capacity
gains with more advanced methods (such as QMB and FMB). Capacity gains associated
with QMB and FMB implementation in such territories with lower TULs may be
postponed depending on the overall ROI analysis.
In non-signaled territories, the performance results when migrating to FMB are estimated
to be considerably higher with higher train density. As shown in Section 3.2.2, total train
gain at 75 percent TUL is estimated to be six times higher compared to 25 percent TUL,
and 18 times higher at 100 percent TUL.
From a theoretical perspective, the individual analysis of the characteristics of each territory (be
it a subdivision or portions of subdivisions) may lead to intermediate implementation steps with
several transition points from one method to another at territory boundaries. While this may be
the result of an optimal ROI analysis per territory, it may introduce complexity to the railroad
operation and maintenance. This aspect should be considered in the overall decision analysis,
which may lead to either promote or hold the advancement of the train control method for a
territory even if the ROI analysis of that territory could indicate otherwise.
55
A particularly attractive evolution path from today’s Overlay PTC implementation would be:
1. EO-PTC: Since this step can provide significant reduction in headways and
corresponding increase in capacity without requiring any changes to the current PTC
system hardware or software (only requiring changes to track data), it should provide
significant near-term ROI.
2. QMB with restricted CFM: This mode is referred to as “restricted” because it still
requires operation under RSR when a train enters an occupied block. While this mode
does not provide any reduction in headways or increase in capacity as compared with
EO-PTC, it is a necessary step along the evolution to FMB. And, it provides a degree of
rear-of-train/restricted speed collision protection without PTL-EOT and a higher degree
of protection once PTL-EOT is integrated with the QMB system. Subsequent steps would
be to shorten track circuits or introduce NGTC. Alternatively, if a suitable alternative to
track circuits becomes available, the ROI may be greater to proceed directly to FMB.
3. FMB: FMB can be implemented as a straightforward addition to QMB with restricted
CFM and PTL-EOT. The key additional component needed to achieve FMB headways
and capacity is an alternative method for broken rail and rollout detection.
Figure 41 illustrates the proposed evolutionary PTC steps.
Figure 41. A Practical Roadmap through HRCTC Modes Leading to FMB
The following subsections present high-level steps for the migration to each of the proposed
HRCTC methods.
4.1 Generic High-Level Migration Steps
The migration to any of the HRCTC methods will require steps that are similar for all.
Additionally, there are specific steps required for each of the train control methods.
The proposed implementation and migration to a new HRCTC method involves three stages with
several steps in each stage:
Stage 1 includes lab testing.
Stage 2 includes development and testing in a test territory.
Stage 3 consists of the rollout and cutover of the new HRCTC method to full revenue
service throughout the test territory and then in other territories after a suitable period of
successful operation in the test territory.
56
As the train control system implementation of EO-PTC only requires editing of the track
database, Stage 1 is not applicable for migration to EO-PTC.
Stage 3 includes steps for collecting before-and-after performance statistics to assess the
operational benefits of the new HRCTC method as compared with the current method (either
Overlay PTC or another HRCTC method) if the implementing railroad chooses to do so. This
may involve operating test trains in addition to the normal revenue trains in order to determine
the capacity limits of the Test Territory before and after. Optionally, a railroad might choose to
collect such statistics in Stage 2 as well.
4.1.1 Stage 1 Laboratory Testing of the New HRCTC Method
For QMB and FMB, laboratory tests and simulations of the new PTC components and functions
introduced are strongly recommended. Laboratory tests will verify the correct implementation of
system requirements. Simulations can help check the proper configuration of the system for a
particular territory before cutting it over to revenue service. A simulation environment with an actual
test bed (with actual tracks, trains, and system components) may be extremely helpful to accelerate
the validation of the system requirements. Proposed steps for this stage:
1. Develop a test plan and procedures for use in lab tests. The test plan and procedures must
address all system requirements, including functional and non-functional requirements.
Simulation of virtual components (such as trains, tracks and other) can be used to verify
validate requirements and configuration parameters, including those that require multiple
train operation and complex scenarios. The procedures will identify all train operations
(simulated moves) to take place during the test as well as all types of data to be collected.
Efficiency can be increased by designing tests to allow verification of multiple
requirements per test run.
The project manager or project engineer will prepare the test plan along with support
from personnel such as those who have responsibility for safety, signaling/train control
implementation, communications implementation, operations, and executing/monitoring
tests as well as supplier(s). It may be helpful to develop a Requirements Verification
Conditions and Criteria Matrix (RVCCM) prior to developing the Test Procedures.
2. Prepare laboratory environment for the execution of the test plan. Actual PTC equipment
(e.g., TMCs, WIUs, test server, test CAD) and equipment to simulate locomotive
interfaces, track circuit interfaces, and other relevant features of the railroad operating
environment should be included within the laboratory test system. Multiple
configurations may be required for the execution of unit and integration test scenarios.
Integration tests can be executed in groups of sub-systems per turn.
3. Conduct the tests per the test plan. Sequence of tests typically start with the execution of
unit tests, culminating with entire system integration tests. Tests typically start with the
execution of functional tests.
4. Upon completion of the functional tests, review the results and address issues found with
the project team. Vendors may have to be involved with the resolution of problems
found. If necessary, redo the tests and address remaining issues until problems found are
resolved.
57
5. Once functional tests are completed without errors, non-functional tests will be executed.
These include response time and system capacity among others. Simulators likely will be
required for system capacity testing.
6. Upon completion of the non-functional tests, project team will review the results and
address issues. Vendors may be involved with the resolution of problems found. If
necessary, redo the tests and address remaining issues until problems found are resolved.
7. Review results of the tests with railroad’s engineering staff and operation management
and decide whether to proceed with Stage 2 or take other actions.
4.1.2 Stage 2 Preparation for and Field Testing of the New HRCTC Method
Before a railroad begins transitioning territories to the new HRCTC method in full revenue
service, a one-time test sequence should be performed with a special test train in a designated
test territory (HRCTC Test Territory or test bed) to verify that the modifications to PTC
implementation, configuration, rules, and training have been properly executed. Proposed steps
for this testing:
1. Develop a test plan and procedures for use in the HRCTC Test Territory. The procedures
will identify all train operations (moves) to take place during the test as well as all types
of data to be collected. The test plan and procedures must address trains operating in, as
well as trains transitioning into and out of, the HRCTC Test Territory. The test cases
must also include simulated failure and fallback situations. The Test Plan from Stage 1
should be used as a starting point, if that stage was executed.
The project manager or project engineer will prepare the test plan along with support
from personnel such as those who have responsibility for safety, signaling/train control
implementation, communications implementation, operations, and executing/monitoring
tests as well as supplier(s). It may be helpful to develop a RVCCM prior to developing
the Test Procedures, that can be leveraged from Stage 1, if done at that stage.
2. Develop crew and dispatcher instructions for trains operating in, as well as trains
transitioning into and out of, the HRCTC Test Territory. The instructions must also include
procedures to handle failure and fallback situations including how to safely handle any
incidents that might occur. These instructions will eventually become part of a general
order and ultimately the railroad’s rulebook and timetable/special instructions. Emphasize
the critical importance of keeping the Information System (IS) data correct, dispatcher and
crews always maintaining accurate current consist data in the PTC system.
Personnel for that railroad’s department responsible for the handling of operational rules
likely will draft these instructions. This draft document will be reviewed by the HRCTC
project manager and other railroad personnel such as those who have responsibility for
safety, signaling/train control implementation, operations, and executing/monitoring tests.
3. Based on input from the railroad operation management and the HRCTC project
manager, select a section of track and a set of locomotives and cars (and service units, if
applicable) to be used as the test train(s) in the HRCTC Test Territory along with a time
period for testing. This will be reviewed and approved by railroad management. The Test
Territory should be suitable for loading with extra train traffic to determine capacity
limits of the territory.
4. Develop processes and tools to support modifications to the PTC system.
58
5. For the transitions to and from the HRCTC territory, special accommodation may be
required. These may require installation of signs in the field and modifications to existing
systems.
Railroad signaling department personnel will likely execute this task as directed by the
HRCTC project manager. Capital costs will be associated with any changes to equipment
configuration.
6. Train and certify crews and dispatchers for conducting test operations in the HRCTC Test
Territory. Training personnel will develop training materials and certifications. Materials
will be reviewed by the HRCTC project manager as well as safety and operations
personnel. Training personnel will conduct the training and certification.
A PTC onboard simulator may be used to support training if appropriately configured.
When modifications to the simulator are required, the supplier of the simulator would
likely be involved.
7. Prepare for testing of the HRCTC:
a. Coordinate with the railroad operations management and define appropriate date/time
to perform the field test.
b. Railroad management will inform operating and test/engineering personnel of when
testing will take place.
c. Implement required field, locomotive, and back office system modifications. This
also includes developing equipment and software for monitoring the train control
system and logging test data.
8. When approaching the scheduled date/time for the test, the HRCTC project manager
confirms the availability of the track and test assets with railroad operations and
organizes the resources for the execution of the tests.
9. Issue a Track Bulletin for the test territory with instructions for revenue trains about how
to avoid interference with or to coordinate movements with the test train(s). Conduct a
safety briefing and then commence testing per the HRCTC Test Plan and Test
procedures. This would involve the HRCTC project manager, train crews, a dispatcher,
and test personnel (that may include supplier personnel) in the field and at the back office
for the duration of the testing. Certain personnel and equipment will be designated for
logging test results and any anomalies or safety concerns.
10. Upon completion of tests, coordinate with the railroad operation to restore prior system
operations in Test Territory (unless railroad wishes to keep HRCTC in revenue service
operation there). Inform operating personnel that testing is complete and restore non-test
track database and configuration files as well as software versions in locomotives that
were involved in testing. This would involve the same test personnel as Step 7. Cancel
the Track Bulletin that was issued for testing.
11. Assess results of testing and decide whether to proceed to revenue service roll-out of
HRCTC or modify plans and testing. Address issues found during the tests with the
project team. Vendors may have to be involved with the resolution of problems found. If
necessary, redo the tests and address remaining issues until problems found are resolved.
59
This would be performed by the HRCTC project manager with support from the
railroad’s engineering staff and operation management.
4.1.3 Stage 3 Cutover of the new HRCTC Method into Revenue Service
Many of the steps for cutover of the new HRCTC method into Revenue Service territory
leverage analogous steps discussed above for Stage 2.
Proposed steps for cutting over the new HRCTC method into revenue service:
1. If the implementing railroad wishes to quantify the new HRCTC benefits, develop a data
collection plan to obtain baseline operations data prior to the new HRCTC cutover. Extra
trains may need to be operated to determine the capacity limits of the territory. The
HRCTC project manager with support from engineering and/or data analytics staff will
define the data to be collected.
The suggested data to be collected are train throughput, headways in close following
moves (not just average, but collect and store data on train locations frequently
throughout the test), transit times experienced by all trains on the territory over a
sufficient period of time (from which can be determined average velocity, delays.), and
anomalies (warnings, enforcements, etc.). The data collected needs to include meta data,
such as time of day, day of week, time of year since the benefits of the new HRCTC (to
be collected after cutover) are primarily experienced during peak traffic times. Any
events that can impact traffic (e.g., slow orders, work zones, extra trains) must also be
recorded along with their start and end times, locations, type of disruption. In order to
attain statistically significant data for the appropriate situations, some fake slow orders or
work zones may need to be introduced. Additionally, data on the amount of time for each
train to recover (resume full speed) from each event that slows or stops trains, and data
on the amount of time taken to reach full speed after exiting a yard, terminal, or slow
order would be beneficial.
2. Develop an HRCTC test plan and procedures for use in revenue service in the new
HRCTC territory, as well as transitions into and out of the territory. The documents will
be prepared by the HRCTC project manager or project engineer along with personnel
such as those who have responsibility for safety, signaling/train control implementation,
communications implementation, operations, executing/monitoring tests, and supplier(s).
Development of these documents can significantly leverage off of those developed in
Stage 2.
a. The test plan will be used by the first train (likely a test train) with test personnel
onboard. The train will be operated once in each direction over the entire territory
before it is cut over to revenue service (instead of having to go through Stage 2 for
every territory). This is done to verify that the territory has been configured properly,
that all WIUs are communicating the proper new information, and that the track
database is correct for the new train control method.
b. A track bulletin will be issued for the time that the test train is making its run, after
which revenue trains will operate normally (not following a test plan/procedure).
They will, however, have been instructed on what sort of issues to watch for and will
be required to fill out a PTC post-trip report noting any anomalies after every trip
through the territory for a designated number of months.
60
3. Issue a general order (and ultimately an update to the railroad’s timetable/special
instructions and rulebook) with the crew and dispatcher instructions for trains operating
in, as well as trains transitioning into and out of, the new HRCTC territory. The
instructions must also address failure and fallback situations. Emphasize the critical
importance of keeping the IS data correct, and the importance of the dispatcher and crews
always maintaining accurate and current consist data in the PTC system.
Development of these documents would leverage those developed in Stage 2.
4. Based on input from the railroad operation management, select the territories to be converted
to the new HRCTC territory along with the sequence in which they will be converted.
Validate the selection and sequence of territories with the railroad operation management.
5. Implement the changes required in the field and in the existing systems. Railroad
signaling department personnel will likely execute this task as directed by the HRCTC
project manager.
6. Train and certify crews and dispatchers for operating in the new HRCTC territory. A
PTC onboard simulator appropriately configured may be used. Training personnel will
develop training material and certification procedures. Materials would be reviewed by
the HRCTC project manager. Development of these documents would leverage those
developed in Stage 2. Training personnel will conduct the training and certification.
7. Prepare for cutover of HRCTC:
a. Coordinate with the railroad operations management and define appropriate date/time
to start the cutover.
b. Railroad management will inform operations, test, and engineering personnel of when
cutover will take place in each territory, based on a recommendation from the
HRCTC project manager.
c. If required, install signs along the wayside indicating where HRCTC begins and ends.
If field signals are in operation, and the new HRCTC system does not require them
for operation (i.e., QMB and FMB), be prepared to bag the signals when the cutover
to the new system starts. These tasks will be conducted by maintenance-of-way
(MoW) personnel.
i. It is possible (optional) that field signals would remain in place, unbagged,
when a territory is first cut over to QMB. This would facilitate more efficient
handling of trains that have not been upgraded to QMB (e.g., those belonging to
a tenant) or that have failed PTC onboard equipment.
ii. If a railroad chooses to keep signals operating unbagged for a while after cutting
over the QMB, then there will be extra steps associated with the subsequent
transition to elimination of signals, since crews will have to follow different
rules in QMB territory with signals present versus. without signals present.
d. Issue General Order indicating exactly when and where the new HRCTC method will
be cut over.
8. Cutover the new HRCTC method.
61
a. Per the sequence of territories agreed with the operation, start the new HRCTC
cutover. Adjust the exact date/time of the cutover for each territory with the railroad
operation management and inform all personnel involved with the cutover.
b. Issue Track Bulletin (e.g., Form C) instructing crews operating on the newly cut over
HRCTC territory to watch for and report any anomalies experienced to the dispatcher
immediately and on their PTC Trip Report, which should be completed after every
trip through the territory until anomalies become rare.
c. If necessary, update system versions and databases for each HRCTC territory at the
time of that territory’s cutover.
d. If required, uncover signs at the new HRCTC territory boundaries. If field signals are
in operation, and the railroad has decided to operate without them, bag the field
signals. MoW personnel will conduct these tasks.
e. Monitor the operation of trains under the territories that were cut over. If problems
related to the operation of the new HRCTC method are reported, discuss them with
the railroad operation management to decide whether to proceed with the new
HRCTC operation, repair the problem, or to restore operation with prior train control
method. Address issues found by the project team. Vendors may have to be involved
with the resolution of problems found. If necessary, redo the tests and address
remaining issues until problems found are resolved. If field signals need to be
restored to operation, those should be unbagged by the MoW personnel.
9. After cutover of each territory, if applicable, collect statistics on operations on the
territories according to the data collection plan previously developed in Step 2.
10. Compare the results with those collected for the same territory prior to cutover to
determine the amount of improvement provided by the new HRCTC method.
4.2 EO-PTC High-Level Specific Migration Steps
The implementation of EO-PTC does not require the introduction or removal of new PTC system
components. From the perspective of the PTC system, it only requires modification to a system
track database. Additionally, the railroads will have to train operators, make modifications to
operating rules, and install physical signs in the field at territory boundaries, if necessary.
For Stage 1 steps (Preparation for and Field Testing), the following need to be considered:
In Step 4, include modifications to the track database file for EO-PTC purposes (it is
likely possible to build upon the existing track database file modification processes).
In Step 5, develop and verify a modified track database for the EO-PTC Test Territory
that maps signals as required for EO-PTC.
In Step 8, upload the modified track database onto test locomotives just prior to testing.
For Stage 2 steps (cutover of the new HRCTC Method into Revenue Service), the specific steps
are also related to the track database in a similar fashion as the modifications in Stage 2. In Steps
5 and 8, make specific changes in the PTC system related to updates in the track database. All
other Stage 3 high-level steps remain as per the generic steps.
62
4.3 QMB High-Level Specific Migration Steps
QMB introduces new PTC system components and new operational concepts as compared to
Overlay PTC and EO-PTC. This will require the execution of Stage 1 before Stage 2. The
generic stages should be adjusted to include, per segment:
Back office: New set of functions to handle the concept of exclusive enforceable
authorities for all trains. Optionally, the railroad may also decide to implement
Centralized Interlocking, which also requires a new set of functions in the back office.
Onboard: Modification of existing functions to handle the concept of exclusive,
enforceable authorities for all trains at all times in PTC territory. Optionally, the railroad
may also decide to implement PTL-EOT.
Wayside: Modifications to the WIUs to report status of track circuits (simply “Clear” or
“Not Clear”) as opposed to signal indication; decommissioning of field signal aspects.
Optionally, the railroad may also decide to implement CIXL, which will require
modifications to wayside systems (interlocking and interfaces with back office system).
Communications: Additional message traffic to accommodate exclusive, enforceable
authority and PTL-EOT message traffic. Depending on how CIXL is implemented,
additional message traffic may have to be handled by the communication system for that
as well.
Modifications to Stage 2 and Stage 3 (Sections 4.1.1 and 4.1.3) migration steps include specific
procedures to implement and test each of the PTC components being introduced. The migration
will follow the same steps as stated in the generic migration stages; however, detailed testing and
implementation plans specific to QMB will have to be developed. Particular attention must be
paid to testing the unrestricted close following move (CFM) functionality (with PTL-EOT and
NGTC, if that solution is chosen) since train crews will have to rely upon the PTC system for
knowing how to operate the train during CFM because wayside signals will not convey
information in this regard.
For QMB to provide greater capacity/shorter headways than EO-PTC, changes to the track
circuits will be required, such as shortening them or implementing NGTC. These changes to the
track circuits will require testing across the entire territory where deployed.
In Stage 2, step 4 (processes and tools to support modifications to the PTC system) may include
the ability to simulate a phantom train moving along a track at the same time that an actual train
is following. This would test the ability of the system to warn of and enforce the appropriate
safe minimum headway between them at various speeds, consists, etc., especially for the case of
unrestricted CFM. A non-revenue test bed may be useful for this test.
If CIXL is being implemented, a detailed plan to switch over the field interlocking must be
prepared, which may require manual field intervention to switch back and forth and likely phased
migration (sets of continuous interlocking locations). Special attention should be given to transition
areas where CIXL will have to interface with legacy field interlocking systems.
4.4 FMB High-Level Specific Migration Steps
Similar to QMB, FMB will introduce new PTC system components and new operational
concepts as compared to Overlay PTC and EO-PTC. This will require the execution of Stage 1
63
before Stage 2. The migration plan to FMB depends on the type of train control method that it is
migrating from:
QMB: FMB will require the introduction of an alternate broken rail detection method.
This system will require testing at various speeds and for various types of track and
breaks. PTL-EOT and CIXL are also required for FMB if the QMB implementation from
which it is migrating has not yet implemented them.
Non-signaled territory: Will require all the new PTC components introduced with QMB
plus an alternate broken rail detection method if anticipated increased train density and/or
speeds necessitate the addition of broken rail protection. In this scenario, there is no need to
migrate from an existing signaling system, which simplifies the migration process.
As in QMB, in Stage 2, step 4 (processes and tools to support modifications to the PTC system)
may include the ability to simulate a phantom train moving along a track at the same time that an
actual train is following it. This would test the ability of the system to warn of and enforce the
appropriate safe minimum headway between them at various speeds, consists, etc. A non-
revenue test bed may be useful for this test, as well as testing of the alternative broken rail and
rollout detection system.
64
5. High-Level Feasibility Analysis
QMB and FMB methods require the introduction of new technologies currently at various
implementation/maturity levels. They also introduce new requirements on existing PTC
components that need to be verified from a feasibility perspective.
EO-PTC does not introduce new system components or requirements and therefore does not
raise any questions from the feasibility perspective.
The technologies and sets of requirements that are being introduced with QMB and FMB and
thus require a feasibility analysis are described in the following sections.
5.1 Positive Train Location End-of-Train
The development of a PTL system has been an ongoing effort from the railroad industry. FRA
has sponsored research projects in this area since 2010. The main objective of the PTL system is
in improving the accuracy and dependability of determining the location of trains.
Most PTC systems rely on GPS-based, head-of-train (HOT) location determination systems,
which generally are not sufficient on their own for safety critical track discrimination or
determination of train length for train control purposes. The original goal of PTL was to be able
to determine the position of the front of the train and the rear of the train to an accuracy of less
than 1.2 meters, at a confidence level of 99.999999997 percent (10 nines), to determine train
length and track discrimination. While this accuracy has been attainable at the HOT, this
performance could not at that time be affordably achieved at the EOT. Initial testing faced
technical challenges that included:
High bit error rate (BER) in the communications link between front of train and rear of
train at required ranges associated with 900 MHz operation
- EOT antenna directionality and squinting: The back of the rearmost railcar directly
obscured line-of-sight (LOS) communication between EOT segment and HOT
segment resulting in significant LOS signal attenuation.
- Antenna positioning and multipath fading: Signal multipath resulted in destructive
interference for a single HOT antenna configuration. As a result, link reliability was
significantly reduced.
Limited bandwidth with 220 MHz and 450 MHz data radio operation
Rearmost car constellation masking: The back of the rearmost railcar often obscured up
to half the available Global Navigation Satellite System (GNSS) constellation and
diminished satellite geometric dilution of precision (GDOP).
GNSS antenna positioning and orientation: The back of the rearmost railcar further acted
as a multipath reflector that biased position estimates.
FRA is currently sponsoring TTCI to continue with the research efforts to address the challenges
above for the implementation of PTL-EOT. The most recent research has yielded updated
requirements and a revised conceptual solution including new technology that is expected to
overcome the challenges experienced in the earlier efforts.
65
TTCI has also been investigating the application requirements and message traffic demands for
PTL-EOT under the QMB Phase 1 project, funded by FRA. Initial assessment indicates that the
additional message traffic required for PTL-EOT can likely be supported with the existing 220-
MHz spectrum owned by PTC220 LLC, even at high density train traffic territories. However,
some higher than predicted loading is being experienced at certain locations with the current
Overlay PTC system that, if not reduced, may indicate a need for additional radio link capacity to
support QMB in high density areas.
5.2 Alternate Broken Rail Detection
Track circuits have been in use for more than a century and are the primary means of detecting
track occupancies for driving automatic block signals (ABS) in North America. The same track
circuits are also used to detect rail breaks.
Track circuits are not 100 percent effective at detecting rail breaks, however. Due to their fixed
boundary locations and their typical lengths in signal system deployments, conventional track
circuits are not generally suitable for use with FMB train control systems. This is because a
primary objective of most FMB systems is to allow near minimum theoretical headways between
trains when operating at speeds up to track speed. Shorter headways can result in greater traffic
capacity.
With fixed block systems, there must be at least one unoccupied block (plus train braking
distance) between two trains operating in a following move to operate safely at speeds above
restricted speed. The unoccupied block is excess train spacing above what is theoretically
required. Further, since block signaling systems use fixed locations of track circuit boundaries
and signals, these locations must be based on braking distance of the worst braking train that can
operate over that territory at track speed. This results in additional excess train spacing because
the average train requires less braking distance. FMB train control systems do not inherently
impose these forms of excess train spacing, but consequently require a less restrictive form of
rail break detection.
While it is possible to reduce the amount of excess train spacing by reducing block length (and
increasing the number of signal aspects if conventional signaling is retained), this increases the
number of track circuits required, which can be prohibitively expensive. Several alternatives to
conventional track circuits have been conceived for detecting rail breaks in support of FMB train
control. These alternatives are categorized below:
Advanced track circuits ( “next generation track circuits” or NGTC)
Non-track circuit-based wayside broken rail detection systems
Onboard broken rail detection systems (OBRD)
No practical/affordable alternative wayside broken rail detection system for use with FMB train
control is currently in production. Tests of various conceptual and prototype solutions falling in
the categories listed have taken place over the past few decades or are currently underway.
A few advanced track circuit solutions are being prototyped and show strong potential to detect a
rail break within a block that has one occupancy. Once a second train enters the block, however,
no broken rail detection can take place between the two trains. This accommodates a partial
reduction in headways as compared with what is achievable under conventional fixed-block
66
signaling, which makes this solution attractive for use with QMB. The advanced track circuit
solutions do not, however, support the maximum capacity benefit otherwise achievable with
FMB train control.
Non-track-circuit-based, wayside broken rail detection systems include those that detect and
locate vibration/sound or strain along the rail. Fiber optic acoustic detection (FOAD) systems can
detect and locate a break while a train is passing over it, but FOAD has not yet been
implemented in a fail-safe manner for vital train control applications. Systems that transmit and
receive sound through the rail are in use on a few railroads but are costly, due to the large
number of transceivers that must be installed along track. Similarly, strain gage systems require a
large number of devices to be installed along track.
A few onboard broken rail detection systems have strong potential to support FMB. An onboard
system is attractive in that it might be more affordable to equip trains rather than track locations,
since there are far fewer trains in operation than there are track circuit equipment sites on a
railroad. Further, rail vehicles can usually be maintained at a facility rather than sending
maintenance personnel to the field. Some onboard systems can detect a rail break underneath a
train or just after a train clears a break. A broken rail detection system mounted on a DP
locomotive at the end of a train might be feasible in the relatively near term. Existing track
circuits would likely be retained for detecting spontaneous breaks (those rare breaks that do not
occur under a train). It would be more desirable, however, if an onboard system could detect a
rail break that is beyond the braking distance of a train ahead, which can be on the order of a
couple of miles. This could allow elimination of track circuits altogether. To date, no onboard
system is available with that range, but attempts are underway by TTCI to achieve that goal.
Following is a summary of the feasibility for alternative broken rail detection for each of the
various modes of HRCTC:
EO-PTC No alternative broken rail detection system is required. EO-PTC operates with
conventional track circuits.
QMB – Can be implemented without alternative broken rail detection, but advanced track
circuits are required. to achieve the full potential capacity improvements that QMB can
offer. A couple of advanced track circuit solutions look promising and might be available
for installation within the relatively near future.
FMB At least two different OBRD systems that can be used at the rear of a train to
support FMB are available from suppliers. They have undergone a limited amount of
testing and revenue service operation to date. Regarding solutions other than OBRD at the
end of a train, a significant amount of development and testing remains to be done before
any that can support FMB become viable (reliable, fail-safe, producible, and affordable).
5.3 Centralized Interlocking
Centralized interlocking is not a new concept – railroad vendors, particularly in Europe, have
already developed and deployed commercial products that implement the core concepts of
centralized interlocking that will be required for QMB and FMB. However, many of the existing
systems only implement conventional interlocking functions; QMB and FMB require the
integration of exclusive enforceable authorities with interlocking functionality.
67
Technical challenges may exist in the implementation of functions and interfaces with QMB and
FMB components, but those are not expected to be significant. The main challenge that requires
careful design resides in the requirements for message communication among the back office,
field devices, and trains controlled by a centralized interlocking such as switches and track
circuits. The implementation of the centralized interlocking functions should not be a pure
replication of conventional field interlocking designs which could create not only extreme
requirements for the communication system such as very low latency and high message traffic
volume, but also unnecessary complexity in the centralized interlocking functions. Peer-to-peer
communications of real-time wayside status to trains is key to addressing the challenge.
5.4 Movement Authority Functionalities
The implementation of the exclusive enforceable authority functions, both in the onboard and
back office components, may also have technical challenges. Fail-safe design and verification is
required for some of the movement authority functions to guarantee that train authorities are
exclusive (i.e., not overlapping), depending on the chosen architecture. Fail-safe designs for train
control systems have been extensively used by the railroad industry and should be achievable in
this case.
The main technical challenge to implement the exclusive enforceable authority functionalities
relates to the capacity of the PTC communication system to support the additional message
traffic required for the operation of QMB and FMB. In both train control methods, trains will be
periodically releasing portions of track behind them as they move to allow for the extension of
authorities for following trains. This process introduces additional message traffic for the PTC
communication system.
TTCI has developed an initial assessment of the additional QMB message traffic under the FRA-
funded QMB Phase 1 project. Initial assessment indicates that the additional message traffic
required for QMB might be supported with the existing 220-MHz PTC radios and the spectrum
owned by PTC220 LLC, even at high density train message traffic territories. But some concerns
are yet to be addressed before a solid conclusion can be drawn about the sufficiency of the
existing PTC communications capacity.
For FMB, additional message traffic capacity may be required either to allow trains to operate at
closer proximity and/or for the implementation of alternate broken rail detection technology that
will work in conjunction with the movement authority functions. Preliminary assessment of
additional message traffic in QMB indicates that this is not expected to be significant enough to
become a technical challenge and FMB should not be much different than QMB. This, however,
is yet to be verified.
68
6. Conclusion
The three HRCTC methods identified in the evolution of PTC – EO-PTC, QMB, and FMB are
estimated to not only compensate for the negative impacts of Overlay PTC, but to increase
railroad capacity when compared to non-PTC operations. EO-PTC, if deployed in all signaled
PTC-controlled territories, is estimated to provide capacity gains in the range of approximately 4
percent at high train density (~80 percent TUL) while FMB gains are estimated in the range of
approximately 10 percent, based on the operating scenarios analyzed.
The results of the simulations and analysis indicate that the HRCTC methods can provide greater
gains compared to non-PTC or Overlay PTC operation as the density of trains increases. The
HRCTC methods are also estimated to have better capacity to recover from operational
disruption scenarios when compared to non-PTC or Overlay PTC operation.
Based on the RAM analysis of the PTCIEs, issues related to onboard software are the largest
contributors to impact upon railroad efficiency. The second largest contributor is Operator Errors
that cause enforcement (note that Operator Errors in this context does not include failure to
comply with the PTC braking curve).
The HRCTC methods are at different levels of readiness for deployment. EO-PTC can be
implemented without software or hardware changes requiring only changes to the configuration
of the track database, modification of rules, and modification of training. QMB requires
modification or development of new PTC software components, as well as new technologies in
its full configuration (with optional PTL-EOT, optional NGTC, and optional CIXL). Most of
these technologies are not fully developed for PTC. FMB will substantially leverage from QMB
and will require an alternative broken rail detection system. QMB and FMB will require
additional message traffic over the radio system, but preliminary assessment indicates that
existing PTC220 LLC spectrum and radio throughput might be sufficient.
As the results are based on average numbers, assumptions, and the field data collected at the time,
the analysis was prepared. Further investigation and analysis can be done to better determine which
of the proposed train control methods to deploy and when, or to determine improvements in RAM
parameters of PTC components that are worth implementing including:
Analysis of operational and safety impact and potential gains for specific actual scenarios
and/or specific configuration of a railroad territory
Use of latest field data collected by railroads to determine input parameters for RAM
analysis with greater accuracy.
Improvements in PTC features of railroad network simulation tools to better represent the
actual system, future designs and new technologies being added to PTC.
The tools and methods prepared for this project can be used to promote further analysis that
better supports decisions related to the deployment of the proposed methods, including the
development of the above listed items.
Based on the concepts defined during the development of this project, multiple spin-off projects
were initiated for EO-PTC, QMB, FMB, and associated technologies. As of the fourth quarter of
2019, four spin-off projects from the HRCTC program had already been awarded by FRA and
other projects had been selected by railroad committees with high priority for development.
69
7. References
[1]
Federal Railroad Administration. PTC Implementation Status by Railroad.
https://www.fra.dot.gov/app/ptc/
[2]
Vieira, P. (2018). PTC Radio Frequency Network Design for Dense Urban Areas.
Washington, DC: U.S. Department of Transportation, Federal Railroad Administration.
[3]
Cambridge Systematics, Inc. (2007). National Rail Freight Infrastructure Capacity and
Investment Study. Cambridge, MA.
[4]
Pate, S. (2018). Research on Methods for Enhancing Positive Train Control Freight Braking
Algorithms. Washington, DC: U.S. Department of Transportation, Federal Railroad
Administration.
[5]
Vieira, P. (2018). Northeast Corridor PTC Radio Frequency Network Design. Washington,
DC: U.S. Department of Transportation, Federal Railroad Administration.
[6]
Brosseau, J. (2013). Development of an Operationally Efficient PTC Braking Enforcement
Algorithm for Freight Trains. Washington, DC: U.S. Department of Transportation, Federal
Railroad Administration.
70
Appendix A: Configuration of Operational Scenario Simulation Models
The RTC simulation models of the selected operational scenarios were designed to characterize
typical train operations in different types of tracks to assess potential impacts in capacity and/or
safety associated with the operation under PTC. The models were also used to quantify potential
improvements that the proposed train control methods can provide and verify if it can offset the
negative effects of current Overlay PTC.
The configuration of the scenarios were defined jointly with the AG, based on operational
characteristics provided by participant railroads. Table 13 shows a summary of the primary
configuration parameters per operational scenario.
Table 13. Primary Operational Scenario Configuration Parameters
Operational scenario
Track length
(miles)
Number of
WIUs
Number of sidings or
crossovers
Signaled single-track
204
99
20
Signaled double-track
204
162
27
Signaled triple-track
109
108
25
Non-signaled territory
204
99
20
Dense urban area
108
108
21
However, the scenarios needed additional information to be fully configured; specifically:
Length of sidings in the single-track and dark territory scenarios
Spacing between sidings in single-track and dark territory scenarios
Spacing between crossovers in the double- and triple-track scenarios
Track circuit length in the single-, double-, and triple-track, as well as dense urban area
scenarios
Track altimetry in all the scenarios
Track curvature in all the scenarios
Switch characteristics
Train consist makeup and schedule for all the trains in all the scenarios
Configuration details for each operational scenario such as siding length, typical track circuit
length in signaled territories, etc. were based on typical subdivisions selected by participant
railroads and approved by the AG, per the following:
Signaled single-track: Red Rock subdivision (BNSF)
Signaled double-track: Mendota subdivision (BNSF)
Signaled triple-track: Kearney subdivision (UP)
Non-signaled territory: Red Rock subdivision (BNSF), used as reference for the
geometry.
71
DUA: Multiple subdivisions from several railroads (including Metra, Amtrak, BNSF,
Belt Railway Company of Chicago (BRC), Canadian National Railway (CN), Norfolk
Southern Railway (NS), and Union Pacific Railroad (UP) in the Chicago DUA. The RTC
model prepared for FRA’s PTC Radio Frequency Network Design for Dense Urban
Areas study [2] were used as reference to create the DUA model for this project.
Signaled Single-Track Scenario Configuration
Using BNSF’s Red Rock subdivision as the baseline to model the geometric characteristics of
this scenario, TTCI analyzed the following sections of this subdivision:
From milepost 411.3 to 517 (at this point, there is a change in milepost enumeration to
417)
From milepost 417 to 387.4 (skipped from milepost 387.4 to 380.6 as this is a double-
track configuration)
From milepost 380.6 to 312
Grades and curves were configured to characterize significant variations. Track circuit sizes were
configured with average size, based on the sizes identified in the tracks analyzed. Table 14
shows the details of the configuration for the signaled single-track model.
Table 14. Signaled Single-Track Configuration Parameters
Length (miles)
204
Number of sidings
21
Length of sidings (min., max., avg. miles)
1.1, 2.1, 1.738
Spacing between sidings (min., max., avg. miles)
4.4, 11.5, 7.614
Sidings type
Controlled
Track circuit length (min., max., avg. miles)
1.85, 2.55, 2.147
Number of permissive signals
58
Number of absolute signals
42
Elevation (min., max. feet)
720, 1210
Degree of curvature (min., max. degrees)
0, 6.05
Switch type
Dual-controlled
Frog number of the switches
20
Type of train control
CTC
Maximum speed (passenger, freight mph)
79, 60
The configuration of the trains included in the model was based on information provided by the
participant railroads and reviewed with the AG. The number and type of trains for the signaled
single-track scenario were in total 17 daily trains, with the following distribution: 4 passenger, 3
loaded grains, 2 empty grains, 2 high-priority merchandise, 2 UPS freight, 2 merchandise, 1 unit
(other than coal or grain), and 1 intermodal stack. Sixty-five percent of the trains depart from one
end of the track, and 35 percent from the other end.
The train consist was based on typical parameters obtained from an analysis of the configuration
of trains that currently run in actual subdivisions. Table 15 shows the train schedule and consist
configuration of the signaled single-track model.
72
Table 15. Signaled Single-Track Train Schedule
Train ID Type Departure
Time
Entry
Point
# of
Cars
Locomotive
Type
No. of
Loco-
motives
Total
Weight
(tons)
Total
Length
(feet)
P/W
Ratio
Amtrak-01 Passenger 7:30 AM East 8 F59PH 2 300 676 20.2
Amtrak-02 Passenger 7:40 AM West 8 P40-HEP 2 608 818 8.4
LoadedGrain
-01
Loaded
Grain 8:55 AM East 100 SD40-2 3 11000 5706 0.7
Merchandise
-01 Merchandise 9:05 AM West 90 C44-9 2 7650 5996 1.1
EmptyGrain-
01 Empty Grain 10:20 AM East 100 SD40-2 3 3500 5706 2.2
LoadedGrain
-02
Loaded
Grain 10:30 AM West 100 SD40-2 3 11000 5706 0.7
UPS-01 Freight 11:45 AM East 50 SD70MAC 2 4400 3298 1.5
HPM-01
High-
Priority
Merchandise
11:55 AM West 70 SD70MAC 2 5110 4558 1.3
Amtrak-03 Passenger 1:00 PM West 8 P40-HEP 2 608 818 8.4
Merchandise
-02 Merchandise 1:10 PM East 80 SD70MAC 2 6800 5348 1
Amtrak-04 Passenger 2:20 PM East 8 F59PH 2 300 676 20.2
IS-01 Intermodal
Stack 2:25 PM West 70 SD70MAC 3 6300 5122 1.6
EmptyGrain-
02 Empty Grain 3:50 PM West 100 SD40-2 3 3500 5706 2.2
Unit-01
Unit (other
than coal or
grain)
5:20 PM West 110 SD70MAC 2 10450 6748 0.6
LoadedGra
in-03
Loaded
Grain 6:40 PM West 100 SD40-2 3 11000 5706 0.7
HPM-02
High-
Priority
Merchandise
8:05 PM West 70 SD70MAC 2 5110 4558 1.3
UPS-02 Freight 9:30 PM West 50 SD70MAC 2 4400 3298 1.5
73
Signaled Double-Track Scenario Configuration
Using BNSF’s Mendota subdivision as the baseline to model the geometric characteristics of this
scenario, TTCI analyzed 125 miles of this subdivision (from MP 165 to 40).
TTCI prepared a 204-mile-long model using the track configuration identified in the Mendota
subdivision.
TTCI applied the same track altitude and curvature configuration defined for the single-track
scenario. All track circuits between two control points were assumed to have the same length.
Track circuit sizes were configured with average size, based on the sizes identified in the tracks
analyzed. Table 16 shows the details of the configuration for the signaled double-track model.
Table 16. Signaled Double-Track Configuration Parameters
Length (miles)
204
Number of crossovers
24
Length of sidings (min., max., avg. miles)
N/A
Spacing between crossovers (min., max., avg. miles)
3.9 , 15.8 , 8.01
Crossovers type
Single and double
Track circuit length (min., max., avg. miles)
1.3 , 2.14 , 1.689
Number of permissive signals
188
Number of absolute signals
96
Elevation (min., max. feet)
728.5 , 1180
Degree of curvature (min., max. degrees)
0 , 6.05
Switch type
Dual-controlled
Frog number of the switches
20
Type of train control
C.T.C.
Maximum speed (passenger, freight mph)
79 , 60
The double-track model was configured with total 86 trains per day, with the following
distribution: passenger, 39 loaded grains, 4 empty grains, 17 high priority merchandise, 2 UPS
freight, and 18 merchandise. Fifty-one percent of the trains depart from one end of the track and
49 percent from the other end.
74
Table 17 shows the train schedule and consist configuration of the signaled double-track model.
Table 17. Signaled Double-Track Train Schedule
Train
ID Type Departure
Time
Entry
Point
No. of
Cars
Loco-
motive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Dbl-01 Loaded Grain 12:00 AM East 100 SD40-2 3 110,00 5,706 0.7
Dbl-02 Merchandise 12:15 AM West 90 C44-9 2 7,650 5,996 1.1
Dbl-03
High-Priority
Merchandise
12:30 AM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-04 Loaded Grain 12:45 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-05
Freight
(High-Prt
Merch)
1:15 AM West 50 SD70MAC 2 4400 3,298 1.5
Dbl-06
Loaded Grain
1:30 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-07
Loaded Grain
1:45 AM
West
100
SD40-2
3
11000
5,706
0.7
Dbl-08
Loaded Grain
2:00 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-09
Loaded Grain
2:15 AM
West
100
SD40-2
3
11000
5,706
0.7
Dbl-10
Merchandise
2:30 AM
East
80
SD70MAC
2
6800
5,348
1
Dbl-11
Loaded Grain
2:45 AM
West
100
SD40-2
3
11000
5,706
0.7
Dbl-12
Loaded Grain
3:00 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-13
Merchandise
3:15 AM
West
90
C44-9
2
7650
5,996
1.1
Dbl-14
Loaded Grain
3:30 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-15
Merchandise
3:45 AM
West
90
C44-9
2
7650
5,996
1.1
Dbl-16
Loaded Grain
4:00 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-17
High-Priority
Merchandise
4:15 AM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-18
Merchandise
4:30 AM
East
80
SD70MAC
2
6800
5,348
1
Dbl-19
Loaded Grain
4:45 AM
West
100
SD40-2
3
11000
5,706
0.7
Dbl-20
Merchandise
5:00 AM
East
80
SD70MAC
2
6800
5,348
1
Dbl-21
High-Priority
Merchandise
5:15 AM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-22
High-Priority
Merchandise
5:45 AM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-23
High-Priority
Merchandise
6:00 AM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-24
Passenger
6:15 AM
West
8
P40-HEP
2
608
818
8.4
Dbl-25
High-Priority
Merchandise
6:30 AM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-26
Loaded Grain
6:45 AM
West
100
SD40-2
3
11000
5,706
0.7
Dbl-27
Loaded Grain
7:00 AM
East
100
SD40-2
3
11000
5,706
0.7
Dbl-28
High-Priority
Merchandise
7:15 AM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-29
Passenger
7:30 AM
East
8
F59PH
2
300
676
20.2
Dbl-30
Empty Grain
7:45 AM
West
100
SD40-2
3
3500
5,706
2.2
75
Train
ID Type Departure
Time
Entry
Point
No. of
Cars
Loco-
motive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Dbl-31 Loaded Grain 8:00 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-32 Loaded Grain 8:15 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-33 Loaded Grain 8:30 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-34 Loaded Grain 8:45 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-35 Loaded Grain 9:00 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-36 Loaded Grain 9:15 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-37 Loaded Grain 9:30 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-38 Empty Grain 9:45 AM West 100 SD40-2 3 3500 5,706 2.2
Dbl-39 Empty Grain 10:00 AM East 100 SD40-2 3 3500 5,706 2.2
Dbl-40 Loaded Grain 10:15 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-41 Loaded Grain 10:30 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-42 Loaded Grain 10:45 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-43 Loaded Grain 11:15 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-44 Loaded Grain 11:30 AM East 100 SD40-2 3 11000 5,706 0.7
Dbl-45 Loaded Grain 11:45 AM West 100 SD40-2 3 11000 5,706 0.7
Dbl-46 Loaded Grain 12:00 PM East 100 SD40-2 3 11000 5,706 0.7
Dbl-47 Loaded Grain 12:15 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-48 Loaded Grain 12:30 PM East 100 SD40-2 3 11000 5,,706 0.7
Dbl-49
High Priority
Merchandise
12:45 PM West 70 SD70MAC 2 5110 4558 1.3
Dbl-50 Loaded Grain 1:00 PM East 100 SD40-2 3 11000 5,706 0.7
Dbl-51 Loaded Grain 1:15 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-52
High-Priority
Merchandise
1:30 PM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-53 Merchandise 1:45 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-54 Loaded Grain 2:00 PM East 100 SD40-2 3 11000 5,706 0.7
Dbl-55 Merchandise 2:15 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-56 Loaded Grain 2:30 PM East 100 SD40-2 3 11000 5,706 0.7
Dbl-57 Merchandise 2:45 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-58 Loaded Grain 3:00 PM East 100 SD40-2 3 11000 5,706 0.7
Dbl-59 Passenger 3:15 PM West 8 P40-HEP 2 608 818 8.4
Dbl-60 Merchandise 3:30 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-61 Loaded Grain 3:45 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-62 Merchandise 4:00 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-63 Loaded Grain 4:15 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-64 Merchandise 4:30 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-65
Freight
(High-Prt
Merch)
5:00 PM East 50 SD70MAC 2 4400 3,298 1.5
76
Train
ID Type Departure
Time
Entry
Point
No. of
Cars
Loco-
motive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Dbl-66 Merchandise 5:15 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-67
High-Priority
Merchandise
5:30 PM East 70 SD70MAC 2 5110 4,,558 1.3
Dbl-68 Merchandise 5:45 PM West 90 C44-9 2 7650 5996 1.1
Dbl-69 Merchandise 6:00 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-70 Passenger 6:15 PM East 8 F59PH 2 300 676 20.2
Dbl-71
High-Priority
Merchandise
6:15 PM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-72 Merchandise 6:45 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-73 Merchandise 7:00 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-74 Loaded Grain 7:15 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-75 Empty Grain 7:30 PM East 100 SD40-2 3 3500 5,706 2.2
Dbl-76 Loaded Grain 7:45 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-77
High-Priority
Merchandise
8:00 PM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-78
High-Priority
Merchandise
8:15 PM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-79
High-Priority
Merchandise
8:45 PM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-80
High-Priority
Merchandise
9:00 PM East 70 SD70MAC 2 5110 4,558 1.3
Dbl-81 Merchandise 9:15 PM West 90 C44-9 2 7650 5,996 1.1
Dbl-82
High-Priority
Merchandise
9:45 PM West 70 SD70MAC 2 5110 4,558 1.3
Dbl-83 Merchandise 10:00 PM East 80 SD70MAC 2 6800 5,348 1
Dbl-84 Loaded Grain 10:15 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-85 Loaded Grain 10:45 PM West 100 SD40-2 3 11000 5,706 0.7
Dbl-86
High-Priority
Merchandise
11:00 PM East 70 SD70MAC 2 5110 4,558 1.3
Signaled Triple-Track Scenario Configuration
Using UP’s Kearney subdivision as the reference to build the signaled triple-track model, TTCI
analyzed 109 miles of track (from MP 284.0 to 175.0) to determine the configuration parameters
for the model.
The altitude and curvature of tracks of the model were based on the same characteristics as the
tracks of the signaled single-track model. The length of track circuits between two control points
were configured with average track circuit length.
77
Table 18 shows the details of the configuration for the signaled triple-track model.
Table 18. Signaled Triple-Track Configuration Parameters
Length (miles)
109
Number of crossovers
16
Length of sidings (min., max., avg. miles)
N/A
Spacing between crossovers (min., max., avg. miles)
2.2, 10.6, 6.188
Crossovers type
Single and double
Track circuit length (min., max., avg. miles)
1.067, 1.5, 1.252
Number of permissive signals
207
Number of absolute signals
96
Elevation (min., max. feet)
953 , 1150
Degree of curvature (min., max. degrees)
0 , 4.0
Switch type
Dual-controlled
Frog number of the switches
20
Type of train control
C.T.C.
Maximum speed (passenger, freight mph)
79 , 60
The model was configured with 110 daily trains, distributed as follows: 75 passenger, 5 loaded
grains, 1 empty grain, 8 loaded coal, 4 high-priority merchandise, 4 intermodal, 4 intermodal
stack, 2 UPS freight, 4 merchandise, 1 empty coal, 1 vehicle, and 1 unit (other than coal or
grain). From these trains, 52 percent will depart from one end of the track and 48 percent from
the other end. Table 19 shows the train schedule and consist configuration of the signaled
double-track model.
Table 19. Signaled Triple-Track Train Schedule
Train
ID Type Departure
Time
Entry
Point
No.
of
Cars
Locomotive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Tri-01 Freight 12:10 AM East 50 SD70MAC 2 4,400 3,298 1.5
Tri-02
Intermodal
12:40 AM
East
70
SD70MAC
3
6,300
5,122
1.6
Tri-03
Freight
1:15 AM
West
50
SD70MAC
2
4,400
3,298
1.5
Tri-04 Intermodal 1:20 AM East 70 SD70MAC 3 6,300 5,122 1.6
Tri-05
Intermodal
1:45 AM
West
70
SD70MAC
3
6,300
5,122
1.6
Tri-06
Intermodal
Stack
2:20 AM East 70 SD70MAC 3 6,300 5,122 1.6
Tri-07
Intermodal
2:45 AM
West
70
SD70MAC
3
6,300
5,122
1.6
Tri-08
Intermodal
Stack
3:15 AM West 70 SD70MAC 3 6,300 5,1,22 1.6
Tri-09
Intermodal
Stack
3:20 AM East 70 SD70MAC 3 6,300 5,122 1.6
Tri-11
High-Priority
Merchandise
4:00 AM East 70 SD70MAC 2 5,110 4,558 1.3
Tri-10
Intermodal
Stack
4:00 AM West 70 SD70MAC 3 6,300 5,122 1.6
78
Train
ID Type Departure
Time
Entry
Point
No.
of
Cars
Locomotive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Tri-12 Passenger 4:06 AM West 8 P40-HEP 2 608 818 8.4
Tri-13 Passenger 4:30 AM West 8 P40-HEP 2 608 818 8.4
Tri-14
High-Priority
Merchandise
4:40 AM West 70 SD70MAC 2 5,110 4,558 1.3
Tri-15 Passenger 4:52 AM West 8 P40-HEP 2 608 818 8.4
Tri-16
High-Priority
Merchandise
5:00 AM East 70 SD70MAC 2 5,110 4,558 1.3
Tri-17 Passenger 5:15 AM West 8 P40-HEP 2 608 818 8.4
Tri-18 Passenger 5:30 AM West 8 P40-HEP 2 608 818 8.4
Tri-20 Passenger 5:45 AM East 8 F59PH 2 300 676 20.2
Tri-19 Passenger 5:45 AM West 8 P40-HEP 2 608 818 8.4
Tri-21 Passenger 5:52 AM West 8 P40-HEP 2 608 818 8.4
Tri-22 Passenger 6:12 AM West 8 P40-HEP 2 608 818 8.4
Tri-23 Passenger 6:32 AM West 8 P40-HEP 2 608 818 8.4
Tri-24 Passenger 6:45 AM East 8 F59PH 2 300 676 20.2
Tri-25 Passenger 6:52 AM West 8 P40-HEP 2 608 818 8.4
Tri-26 Passenger 7:00 AM East 8 F59PH 2 300 676 20.2
Tri-27 Passenger 7:12 AM West 8 P40-HEP 2 608 818 8.4
Tri-28 Passenger 7:20 AM East 8 F59PH 2 300 676 20.2
Tri-29 Passenger 7:25 AM West 8 P40-HEP 2 608 818 8.4
Tri-31 Passenger 7:45 AM East 8 F59PH 2 300 676 20.2
Tri-30 Passenger 7:45 AM West 8 P40-HEP 2 608 818 8.4
Tri-33 Passenger 8:00 AM East 8 F59PH 2 300 676 20.2
Tri-32 Passenger 8:00 AM West 8 P40-HEP 2 608 818 8.4
Tri-34 Passenger 8:15 AM West 8 P40-HEP 2 608 818 8.4
Tri-36 Passenger 8:30 AM East 8 F59PH 2 300 676 20.2
Tri-35 Passenger 8:30 AM West 8 P40-HEP 2 608 818 8.4
Tri-37 Passenger 8:45 AM West 8 P40-HEP 2 608 818 8.4
Tri-38 Passenger 8:47 AM East 8 F59PH 2 300 676 20.2
Tri-39 Passenger 9:00 AM West 8 P40-HEP 2 608 818 8.4
Tri-40 Loaded Coal 9:00 AM East 120 SD70MAC 2 17,160 6748 0.4
Tri-41 Passenger 9:02 AM East 8 F59PH 2 300 676 20.2
Tri-42 Passenger 9:20 AM West 8 P40-HEP 2 608 818 8.4
Tri-43
High-Priority
Merchandise
9:30 AM West 70 SD70MAC 2 5,110 4,558 1.3
Tri-44 Loaded Coal 9:30 AM East 120 SD70MAC 2 17,160 6,748 0.4
Tri-45 Passenger 9:32 AM East 8 F59PH 2 300 676 20.2
Tri-46 Passenger 9:40 AM West 8 P40-HEP 2 608 818 8.4
Tri-47 Passenger 9:45 AM East 8 F59PH 2 300 676 20.2
79
Train
ID Type Departure
Time
Entry
Point
No.
of
Cars
Locomotive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Tri-48 Passenger 10:00 AM East 8 F59PH 2 300 676 20.2
Tri-49 Passenger 10:05 AM West 8 P40-HEP 2 608 818 8.4
Tri-50 Passenger 10:20 AM East 8 F59PH 2 300 676 20.2
Tri-51 Passenger 10:24 AM West 8 P40-HEP 2 608 818 8.4
Tri-53 Loaded Coal 10:30 AM East 120 SD70MAC 2 17,160 6,748 0.4
Tri-52 Loaded Coal 10:30 AM West 120 SD70MAC 2 17,160 6,748 0.4
Tri-54 Passenger 10:40 AM East 8 F59PH 2 300 676 20.2
Tri-55 Loaded Grain 10:45 AM East 100 SD40-2 3 11,000 5,706 0.7
Tri-56 Passenger 10:50 AM West 8 P40-HEP 2 608 818 8.4
Tri-58 Passenger 11:00 AM East 8 F59PH 2 300 676 20.2
Tri-57 Passenger 11:00 AM West 8 P40-HEP 2 608 818 8.4
Tri-59 Loaded Coal 11:00 AM West 120 SD70MAC 2 17,160 6,748 0.4
Tri-60 Passenger 11:20 AM East 8 F59PH 2 300 676 20.2
Tri-61 Passenger 11:40 AM East 8 F59PH 2 300 676 20.2
Tri-62 Passenger 12:20 PM East 8 F59PH 2 300 676 20.2
Tri-63 Passenger 12:50 PM East 8 F59PH 2 300 676 20.2
Tri-64 Passenger 1:00 PM West 8 P40-HEP 2 608 818 8.4
Tri-65 Passenger 1:20 PM East 8 F59PH 2 300 676 20.2
Tri-66 Passenger 2:00 PM West 8 P40-HEP 2 608 818 8.4
Tri-67 Loaded Coal 2:10 PM West 120 SD70MAC 2 17,160 6,748 0.4
Tri-68 Loaded Grain 2:10 PM East 100 SD40-2 3 11,000 5,706 0.7
Tri-69 Passenger 2:20 PM East 8 F59PH 2 300 676 20.2
Tri-70 Passenger 2:30 PM West 8 P40-HEP 2 608 818 8.4
Tri-71 Passenger 2:40 PM East 8 F59PH 2 300 676 20.2
Tri-72 Passenger 3:00 PM West 8 P40-HEP 2 608 818 8.4
Tri-73 Loaded Coal 3:10 PM West 120 SD70MAC 2 17,160 6,748 0.4
Tri-74 Loaded Grain 3:10 PM East 100 SD40-2 3 11,000 5,706 0.7
Tri-75 Passenger 3:20 PM East 8 F59PH 2 300 676 20.2
Tri-76 Loaded Grain 3:45 PM East 100 SD40-2 3 11,000 5,706 0.7
Tri-77 Passenger 3:50 PM East 8 F59PH 2 300 676 20.2
Tri-78 Loaded Coal 3:50 PM West 120 SD70MAC 2 17,160 6,748 0.4
Tri-79 Passenger 4:00 PM West 8 P40-HEP 2 608 818 8.4
Tri-80 Passenger 4:05 PM East 8 F59PH 2 300 676 20.2
Tri-81 Passenger 4:20 PM East 8 F59PH 2 300 676 20.2
Tri-82 Passenger 4:38 PM East 8 F59PH 2 300 676 20.2
Tri-84 Passenger 5:00 PM East 8 F59PH 2 300 676 20.2
Tri-83 Passenger 5:00 PM West 8 P40-HEP 2 608 818 8.4
80
Train
ID Type Departure
Time
Entry
Point
No.
of
Cars
Locomotive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft.)
P/W
Ratio
Tri-85 Passenger 5:15 PM East 8 F59PH 2 300 676 20.2
Tri-86 Passenger 5:25 PM East 8 F59PH 2 300 676 20.2
Tri-87 Passenger 5:45 PM East 8 F59PH 2 300 676 20.2
Tri-88 Loaded Grain 5:55 PM East 100 SD40-2 3 11,000 57,06 0.7
Tri-89
Unit (other
than coal or
grain)
5:55 PM West 110 SD70MAC 2 10,450 6,748 0.6
Tri-90 Passenger 6:10 PM East 8 F59PH 2 300 676 20.2
Tri-91 Passenger 6:25 PM West 8 P40-HEP 2 608 818 8.4
Tri-92 Vehicle 6:25 PM East 60 SD70 3 7,200 5,322 1.4
Tri-93 Merchandise 6:35 PM West 90 C44-9 2 7,650 5,996 1.1
Tri-94 Passenger 6:40 PM East 8 F59PH 2 300 676 20.2
Tri-95 Merchandise 7:00 PM East 80 SD70MAC 2 6,800 5,348 1
Tri-96 Passenger 7:10 PM East 8 F59PH 2 300 676 20.2
Tri-97 Merchandise 7:30 PM East 80 SD70MAC 2 6,800 5,348 1
Tri-98 Merchandise 7:35 PM West 90 C44-9 2 7,650 5,996 1.1
Tri-99 Passenger 7:40 PM East 8 F59PH 2 300 676 20.2
Tri-
100
Passenger 7:50 PM West 8 P40-HEP 2 608 818 8.4
Tri-
101
Passenger 8:05 PM East 8 F59PH 2 300 676 20.2
Tri-
102
Empty Coal 8:10 PM East 80 C44-AC 2 2800 4,546 3
Tri-
103
Empty Grain 8:35 PM West 100 SD40-2 3 3500 5,706 2.2
Tri-
104
Passenger 8:50 PM West 8 P40-HEP 2 608 818 8.4
Tri-
105
Passenger 9:30 PM East 8 F59PH 2 300 676 20.2
Tri-
106
Passenger 9:50 PM West 8 P40-HEP 2 608 818 8.4
Tri-
107
Passenger 10:50 PM West 8 P40-HEP 2 608 818 8.4
Tri-
108
Passenger 11:00 PM East 8 F59PH 2 300 676 20.2
Tri-
109
Passenger 11:30 PM East 8 F59PH 2 300 676 20.2
Tri-
110
Passenger 11:50 PM West 8 P40-HEP 2 608 818 8.4
81
Dense Urban Area Scenario Configuration
TTCI prepared the DUA network model based on actual railroad tracks from multiple
subdivisions that operate in the downtown Chicago area. The model includes signaled single-,
double-, triple- and quadruple-track territories, as well as terminals and yards and their
interconnections. The subdivisions used as reference were the following:
Metra Joliet: from MP 0 to MP 8.4
Metra – Southwest: from MP 0.9 to MP 9.4
Amtrak Union Station: from MP 0 to MP 2.4
BNSF – Chicago: from MP 0 to MP 3.6
BRC – Kenton Line: from MP 14 to MP 17.5
CN Joliet: from MP 3.7 to MP 5
CN Freeport: from MP 1.6 to MP 5.6
CN SCAL: from MP 97.4 to MP 99.2
NS Ashland: from MP 0 to MP 2.8
NS – Chicago District: from MP 513.5 to MP 515.3
NS – Chicago Line: from MP 515.7 to MP 518.6
UP – Rockwell: from MP 98.7 to MP 99.2
UP Villa Grove: from MP 8.8 to MP 9.9, and from MP 98.9 to MP 99.831
(Canal St. Yard)
The terminal/yards included in the model were the following:
BNSF Western Avenue Yard
CN - Bridgeport Yard
UP IMX IM Yard
UP – Canal St. yard
NS – Ashland Yard
BRC EW3 Storage
Metra – Joliet Sub Yard
TTCI also added the signaling system configuration of the tracks in the model and the train
schedule of all railroads that operate in the DUA area.
Figure 42 shows a schematic diagram of the RTC model created for the DUA operational
scenario.
82
Figure 42. Schematic Diagram of the DUA Operational Scenario RTC Model
Table 20 shows the details of the track configuration for the DUA model.
Table 20. DUA Configuration Parameters
DUA Configuration Summary
Length (mi)
43.5
Number of Crossovers
30
Number of sidings
3
Spacing between crossovers (min., max., avg. miles)
N/A
Crossovers type
Single and double
Track circuit length (min., max., avg. miles)
N/A
Number of permissive signals
56
Number of absolute signals
218
Elevation (min., max. feet)
589 , 630
Degree of curvature (min., max. degrees)
0 , 4.0
Switch type
Variable
Frog number of the switches
Variable
Type of train control
C.T.C.
Maximum speed (passenger, freight mph)
Variable
The baseline DUA model includes 1,134 trains that were configured based on actual train
schedules. The schedule includes 518 trains on the busiest day of the week and 246 trains on the
quietest day. Table 21 displays the number of trains per weekday that were configured in the
DUA model divided into three train groups: passenger (includes Amtrak and commuter trains);
expedited (includes intermodal, excess dimension, and premium intermodal trains), and freight
(includes all merchandise, vehicle, local, and unit trains).
83
Table 21. Total Trains per Weekday in the DUA Model
Trains per Day on DUA Scenario
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Passenger
345
347
343
343
343
93
77
Expedited
96
101
97
96
100
105
98
Freight
69
64
78
69
69
58
71
TOTAL
510
512
518
508
512
256
246
Non-Signaled Territory Scenario Configuration
TTCI configured the non-signaled territory model with the same geometric characteristics as the
signaled single-track model; i.e., the same number, length, and spacing of sidings; elevation; and
curvature configuration. The main differences between the two models are the type of train
control, type of sidings and switches, and the MAS.
Table 22 shows the details of the configuration for the non-signaled territory model.
Table 22. Non-Signaled Territory Configuration Parameters
Non-Signaled Summary Configuration
Length (miles)
204
Number of sidings:
21
Length of sidings (min., max., avg. miles)
1.1 , 2.1 , 1.738
Spacing between sidings (min., max., avg. miles)
4.4 , 11.5 , 7.614
Sidings type
Uncontrolled
Track circuit length (min., max., avg. miles)
N/A
Number of permissive signals:
N/A
Number of absolute signals:
N/A
Elevation (min., max. feet):
720 , 1210
Degree of curvature (min., max. degrees)
0 , 6.05
Switch type
Manual without any lock
Frog number of the switches
16
Type of train control
Track warrant
Maximum speed (passenger, freight mph)
60, 50
The model was configured with 22 trains daily trains, distributed as follows: 5 local, 4 passenger,
3 loaded grains, 2 merchandise, 2 empty grains, 2 high priority merchandise, 2 UPS freight, 1
foreign, and 1 intermodal stack. Sixty percent of the trains depart from one end of the track and
the rest from the other end of the track.
84
Table 23 shows the train schedule and consist configuration of the non-signaled territory model.
Table 23. Signaled Triple-Track Train Schedule
Train ID Type Departur
e Time
Entry
Point
No. of
Cars
Loco-
motive
Type
No. of
Loco-
motives
Gross
Weight
(tons)
Total
Length
(ft)
P/W
Ratio
Amtrak-01 Amtrak 7:30 AM East 8 F59PH 2 300 676 20.2
Local-01 Local 7:40 AM East 60
SD40-
2
6 5400 4313 2.8
Amtrak-02 Amtrak 7:40 AM West 8
P40-
HEP
2 608 818 8.4
LoadedGrain-
01
Loaded
Grain
8:55 AM East 100
SD40-
2
3 11000 5706 0.7
Merchandise-
01
Merchandise 9:05 AM West 90 C44-9 2 7650 5996 1.1
Local-02 Local 9:30 AM West 60
SD40-
2
6 5400 4313 2.8
EmptyGrain-
01
Empty Grain
10:20
AM
East 100
SD40-
2
3 3500 5706 2.2
LoadedGrain-
02
Loaded
Grain
10:30
AM
West 100
SD40-
2
3 11000 5706 0.7
UPS-01 UPS Freight
11:45
AM
East 50
SD70
MAC
2 4400 3298 1.5
HPM-01
High-
Priority
Merchandise
11:55
AM West 70 SD70
MAC 2 5110 4558 1.3
Local-03 Local
12:45
PM
East 60
SD40-
2
6 5400 4313 2.8
Amtrak-03 Amtrak 1:00 PM West 8
P40-
HEP
2 608 818 8.4
Merchandise-
02
Merchandise 1:10 PM East 80
SD70
MAC
2 6800 5348 1
Amtrak-04 Amtrak 2:20 PM East 8 F59PH 2 300 676 20.2
IS-01
Intermodal
Stack
2:25 PM West 70
SD70
MAC
3 6300 5122 1.6
EmptyGrain-
02
Empty Grain 3:50 PM West 100
SD40-
2
3 3500 5706 2.2
Foreign-01
Foreign
5:15 PM
West
90
C44-9
2
7650
5996
1.1
Local-04 Local 6:00 PM West 60
SD40-
2
6 5400 4313 2.8
LoadedGrain-
01
Loaded
Grain
6:40 PM West 100
SD40-
2
3 11000 5706 0.7
Local-05 Local 7:25 PM East 60
SD40-
2
6 5400 4313 2.8
HPM-02
High-
Priority
Merchandise
8:05 PM West 70 SD70
MAC 3 6300 5122 1.6
UPS-02 UPS Freight 9:30 PM West 50
SD70
MAC
2 4400 3298 1.5
85
Appendix B: Track Utilization Level
Foundation Concepts
Track utilization level (TUL) defines the volume of traffic in a portion of territory compared to
its capacity to assess congestion levels.
The capacity of a rail corridor or subdivision is defined as the maximum volume or number of
trains per day that the infrastructure can accommodate without compromising the safety or
reliability of the flow of trains. The capacity of a rail line is affected by many factors, including
the number of tracks, frequency and length of sidings, capacity of the yards and terminals along a
corridor to receive the traffic, type of control systems, terrain, mix of train types, power of the
locomotives, track speed, and individual railroad operating practices.
TTCI used the National Rail Freight Infrastructure Capacity and Investment (NRFICI) Study [3]
as a reference to determine railroad capacity and TUL. According to this study, the rail capacity
can take two forms: the theoretical capacity is the maximum number of trains assuming perfect
conditions; the practical capacity considers factors such as possible disruptions, maintenance,
human decisions, weather, possible equipment failures, supply and demand imbalances, and
seasonal demand. Practical capacity is about 70 percent of the theoretical capacity and provides
reliable service. The theoretical capacity is obtained based on the results of the simulation of the
operational scenarios.
However, translating the definition of capacity to practical numbers may be a subjective task
because the perception of an affectation to safety or reliability of the train flow may vary
depending on the situation or the viewer. For practical purposes of this project to have an
objective threshold to define capacity, the capacity of a scenario will be determined as the
number of trains per day that can run on the scenario that achieve the maximum number of train-
miles per day.
The definition of the maximum number of train-miles per day as threshold is based on the
following reasoning: if the number of trains per day is increased in a scenario, then the number
of train-miles per day will also increase thus the delay due to the rise in the number of conflicts
that need to be solved. However, there will be a maximum number of train-miles per day that can
be achieved; beyond that point, train-miles per day will start decreasing as the number of trains
per day increases, since the delay effects will have surpassed the effects of the number of trains
rise.
Practical Capacity and TUL Calculation Methodology
The calculation of the practical capacity depends on two main parameters: 1) the characteristics
of the territory (e.g., single- or multiple-track, signaled or non-signaled, number of tracks), and
2) the mix of train types (e.g., freight, passenger) that operate in the corridor.
The NRFICI study explains that the mix of trains is an important factor when determining the
capacity of a rail line. A corridor that serves a single type of train will usually accommodate
more trains per day than a corridor that serves a mix of train types since trains of the single type
can be operated at similar speeds and with more uniform spacing between the trains due to
similar braking capabilities.
86
The NRFICI study also introduces a method to adjust for different mixes of trains. Each
operational scenario is assigned a lower and an upper boundary for the maximum number of
trains. The lower boundary is defined as the maximum number of trains per day assuming an
equal mix of merchandise bulk, intermodal-auto, and passenger trains (one-third each). The
upper boundary is defined as the maximum number of trains per day, assuming 100 percent one
type, and 0 percent of the other two types (complete homogeneity). To move between the lower
and upper boundaries, the standard deviation of the train mix is used to scale the range between
them. For a train mix of 33 percent, 33 percent, and 33 percent for each of the three types, the
standard deviation is zero; therefore, a zero adjustment is added to the lower boundary. A train
mix of 100 percent, 0 percent, and 0 percent yields a standard deviation of 0.47, which is scaled
to produce a factor that added to the lower boundary equaled the upper boundary. A standard
deviation falling between the minimum of zero and the maximum of 0.47 produced a capacity
somewhere between the lower and upper boundaries.
The calculation of the practical capacity was conducted per the following steps:
1. For each operational scenario, TTCI developed RTC simulation runs with on type of train
(High-Priority Merchandise) and calculated the theoretical capacity of the scenario which
includes the following steps:
a. The process begins running a simulation with the initial number of trains configured
to depart at evenly spaced intervals throughout the day, although their departing time
is affected by a randomization process that may anticipate or delay the departure in up
to 30 minutes. Fifty percent of the trains will start from one end of the track and the
rest of trains from the opposite end. Once the simulation ends, the results are
compiled and the number of train-miles per day is obtained after processing one of
the simulator’s output files.
b. Next, the number of trains per day is increased, and the process is repeated until the
maximum value of train-miles per day is found. The number of trains per day that
corresponds to the maximum value of train-miles per day stablishes the theoretical
capacity of the scenario.
2. Based on the theoretical capacity, TTCI calculated the practical capacity (70 percent of
theoretical capacity).
3. The practical capacity calculated for a single train type was converted to capacity values of
cases with multiple types of trains, using the method described in the NRFICI study [1].
Table 24 shows the practical capacity figures per operational scenario, as calculated in the
NRFICI study [1].
87
Table 24. Practical Capacity Values per Operational Scenario
The proceeding sections describe the practical capacity calculations made for each operational
scenario using RTC simulations and how they compare with the values from
Table 24.
Practical Capacity of the Signaled Single-Track Scenario
TTCI used the total train-miles per day as the parameter to define the practical capacity of the
scenario. The initial number of daily trains was established at 56. Table 25 shows the results of
the simulations. Based on the number of train-miles per day, the theoretical capacity is reached
with 68 trains per day as highlighted in green. The practical capacity results in a value of 48
trains per day (70 percent of 68) for a single train, which matches the number shown in Table 24
for the signaled single-track operational scenario.
Table 25. Results of RTC Runs for the Signaled Single-Track
Theoretical Capacity Calculation
Theoretical Signaled Single-Track Capacity Runs (RTC)
Train count
per day
Headway
(min)
Average speed
(mph)
Total Train-miles
per day
56
51
39.904
11,204.00
60
48
38.206
11,897.83
62
47
33.072
11,616.05
64
45
31.756
12,050.39
65
44
27.587
11,553.59
66
43
29.465
12,029.47
67
42
27.084
11,785.71
68
42
26.59
12,072.65
70
41
23.342
11,541.78
72
40
18.677
10,555.38
The mix of trains originally configured for the signaled single-track scenario is composed of four
passenger trains (24 percent), five expedited trains (29 percent), and eight freight trains (47
percent) – which results in a standard deviation of 0.09998. Based on the standard deviation, the
practical capacity for this mix of trains in the signaled single-track results in 34 trains per day.
Table 26 summarizes the calculations of practical capacity and TUL for this scenario.
Table 26. Practical Capacity Summary for the Signaled Single-Track Operational Scenario
Mixed Train Types Single Train Type
Signaled Single-track 30 48
Signaled Double-track
75 100
Signaled Triple-track 133 163
Non-signaled 16 20
Practical Capacity (Trains per Day)
Operational Scenario
88
Type of Train Single Type of Train Mix of Trains of the Scenario
TUL Practical Capacity
(100 percent TUL)
Practical Capacity
(100 percent TUL)
75 percent
TUL
50 percent
TUL
25 percent
TUL
Number of
Trains per Day 48 34 26 17 9
Practical Capacity of the Triple-Track Operational Scenario
TTCI used the same method applied to determine the capacity of the signaled single-track
scenario to determine the practical capacity of the signaled triple-track scenario. The initial
number of trains, 242, was gradually increased to 262 trains per day. RTC was unable to resolve
the case with higher number of trains due to the increasing number of conflicts that were being
generated during the simulations. TTCI made more than 40 attempts of simulation with 264
trains per day, each with different seed numbers for the randomization process, but RTC failed to
complete the runs. TTCI held conference calls with Berkeley Simulations to review the issues
found and it was concluded that the model had reached the maximum number of feasible daily
trains that could be dispatched. This number – 262 trains per day – was considered the
theoretical capacity for this scenario. Table 27 shows the results of the practical capacity
simulation runs performed for this scenario.
Table 27. Results of RTC Runs for the Signaled Triple-Track
Theoretical Capacity Calculation
Theoretical Signaled Triple-Track Capacity Runs (RTC)
Train count
per day
Headway
(min)
Average speed
(mph)
Total Train-
miles per day
242
13:35
39.54
25,102.33
246
13:20
38.54
25,521.38
250
13:05
38.47
25,780.64
254
12:51
38.39
26,270.94
258
12:37
37.61
26,503.99
262
12:24
37.10
27,057.19
The practical capacity for the triple-track scenario for a single type of train resulted in 183 trains
per day (70 percent of 262 trains). This number is slightly higher than what is shown in Table 24
(163 trains per day for signaled triple-track), but the difference between both numbers is acceptable
as the results in the NRTC study represent average numbers obtained from multiple lines.
The mix of trains originally configured for the signaled triple-track scenario is composed of 75
passenger trains (68 percent), 15 expedited trains (14 percent) and 20 freight trains (18 percent),
which results in a standard deviation of 0.24711. The practical capacity for this mix of trains in
the signaled triple-track scenario results in 159 trains per day.
Table 28 summarizes the calculations of practical capacity and TUL for this scenario.
Table 28. Practical Capacity Summary for the Signaled Triple-Track Operational Scenario
89
Type of Train Single Type of Train Mix of Trains of the Scenario
TUL
Practical Capacity
(100 percent TUL)
Practical Capacity
(100 percent TUL)
75 percent
TUL
50 percent
TUL
25 percent
TUL
Number of
Trains per Day
183 159 120 80 40
Practical Capacity of the Signaled Double-Track and
Non-signaled Territory Operational Scenarios
The practical capacity results obtained from the RTC simulation runs for the signaled single-
track and triple-track operational scenarios showed results comparable to the NRFICI study
practical capacity values for the same operational scenarios. As the simulation runs are extremely
time-consuming, and as the project was facing budget restrictions, TTCI did not perform RTC
simulation runs for the signaled double-track and non-signaled territories, but rather used the
practical capacity numbers as calculated in the NRFICI study.
The practical capacity for the signaled double-track scenario with a single type of train is
calculated as 100 trains per day in the NRFICI study (Table 24).
The mix of trains for the signaled double-track scenario is composed of 4 passenger trains (5
percent), 19 expedited trains (22 percent), and 63 freight trains (73 percent) – which results in a
standard deviation of 0.29113. The practical capacity for this mix of trains in the signaled
double-track scenario results in 81 trains per day. Table 29 summarizes the calculations of
practical capacity and TUL for this scenario.
Table 29. Practical Capacity Summary for the
Signaled Double-Track Operational Scenario
Type of Train Single Type of Train Mix of Trains of the Scenario
TUL Practical Capacity
(100 percent TUL)
Practical Capacity
(100 percent TUL)
75 percent
TUL
50 percent
TUL
25 percent
TUL
Number of
Trains per Day
100 81 61 41 21
The practical capacity for the non-signaled operational scenario with a single type of train is
calculated as 20 trains per day in the NRFICI study, as shown in Table 24. The typical train mix
for this scenario is 4 passenger trains (18 percent), 11 expedited trains (50 percent), and 7 freight
trains (32 percent) – which results in a standard deviation of 0.13033. The practical capacity for
this mix of trains in the non-signaled operational scenario results in 17 trains per day. Table 30
summarizes the calculations of practical capacity and TUL for this scenario.
90
Table 30. Practical Capacity Summary for the Non-Signaled Operational Scenario
Type of Train
Single Type of Train
Mix of Trains of the Scenario
TUL
Practical Capacity
(100 percent TUL)
Practical Capacity
(100 percent TUL)
75 percent
TUL
50 percent
TUL
25 percent
TUL
Number of
Trains per Day 20 17 13 9 5
Practical Capacity of Dense Urban Area Operational Scenario
The DUA operational scenario is a complex mix of tracks that includes 13 subdivisions with
interconnections between them. The subdivisions include signaled single-, double-, triple-, and
quadruple-tracks. The complexity of the scenario (number of subdivisions, interconnections,
different train routes, etc.) makes it very difficult if not possible to calculate the practical
capacity by systematically increasing the number of trains in the overall network model until the
maximum number of train miles per day is achieved. The NRFICI study does not include a
capacity reference for this type of complex scenarios that could be used as a reference.
TTCI developed a method to calculate the practical capacity of a DUA where the capacity is
calculated per individual sections of the entire model, which when combined, determines the
practical capacity of the DUA. The DUA model contains 13 interconnected subdivisions, as
shown in Figure 43.
Figure 43. Schematic Diagram of Subdivisions in the DUA RTC Model
Each subdivision has several mainline tracks as shown in Table 31.
91
Table 31. Number of Mainline Tracks in Each DUA Subdivision
Subdivision
Number of Mainline Tracks
1
2
2
4
3
2
4
2
5
2
6
1
7
2
8
2
9
2
10
3
11
2
12
1
13
2
TTCI separated the 13 subdivisions into nine sections based on how they were connected and the
train routes that operate on them. Subdivisions with multiple train routes were merged into one
section. The capacity of each section was calculated separately per the NRFICI study, based on
the lowest number of tracks of each subdivision included in that section. For example,
Subdivisions 4 and 5 are merged and become a single section limited to the capacity of a
signaled single-track, since this is the most restrictive capacity of the two merged subdivisions.
Table 32 shows the theoretical and practical capacity for each the sections of the DUA, as well as
the calculation for the entire DUA operational scenario (sum of all sections).
Table 32. Practical Capacity Calculation of the DUA Sections
Section Merged
Subdivisions
Number of
Mainline Tracks
Practical Capacity
Three Types of Train
Equally Distributed
Single Type
of Train
1
7
2
75
100
2
4, 5
2
75
100
3
1, 8, 11
2
75
100
4
8, 10
3
133
163
5
3
2
75
100
6 13 1 30 48
7 9 2 75 100
8
2
4
248
340
9
6, 12
1
30
48
DUA (Total)
816
1,099
92
The sum of the practical capacity of the summarized subdivisions give a minimum (Types of
Train Equally Distributed) and a maximum (Single Type of Train) practical capacity for the
DUA operational scenario. This calculation, however, does not account for the capacity that is
lost at diamond crossings between subdivisions.
There are two diamond crossings in the model, the first between Section 1 (Subdivision 7) and
Section 9 (Subdivisions 6 and 7) and Section 2 (Subdivisions 4 and 5), and the second between
Sections 2 and 3 (Subdivisions 1 and 4). Both diamond crossings are between signaled double-
track lines.
The reduction of capacity (number of daily trains) is calculated by resolving the set of equations
that express the frequency of trains arriving at a diamond crossing in each subdivision including
the delay incurred by the diamond crossings in a day (1,440 minutes):
11 +  2 = 1,440 (8)
22 +  1 = 1,440 (9)
In Equations 8 and 9, NTrains1 is the number of daily trains in one subdivision, while NTrains2
is the number of daily trains in the other subdivision. Assuming that each crossing in a diamond
causes 10 minutes of delay, the first diamond cross (between Sections 1 and 9) will result in:
Number of trains per day = 75 (practical capacity for 3 types of trains equally distributed)
Headway = 1,440/(75/2) = 38.4 minutes (in each track)
As the headway is the same in both sections, the equations become:
38.4 1 + 10 2 = 1,440 (10)
38.4 2 + 10 1 = 1,440 (11)
Resolving the equations, the practical capacity for equally distribution of train types in the
subdivision becomes 59 instead of 75 daily trains; i.e., a reduction of 16 trains in each
subdivision. The total reduction in the DUA operational scenario practical capacity due to
diamond crossings is 64 trains (16 trains in each subdivision), which brings the brings the lower
range of the practical capacity range down to 752 daily trains. Applying the same calculation to
the single type of train, brings the higher end of the range to 995 daily trains.
The number of trains in the baseline DUA operational scenario (based on the average of train
types during weekday in Table 21) is composed of 344 passenger trains (68 percent), 98
expedited trains (19 percent), and 78 freight trains (13 percent); which results in a standard
deviation of 0.2404. Based on this standard deviation, the practical capacity of the DUA
operational scenario is 810 trains.
TTCI analyzed the results of the RTC simulation of the baseline DUA configuration to verify
how it compares with the theoretical practical capacity method presented above. The baseline
DUA configuration is based on actual train traffic operation in downtown Chicago and can
provide good insights of capacity; particularly at peak operation times. The number of daily
trains in the baseline DUA configuration vary, as shown in Table 21. During weekdays, train
traffic is higher, reaching a peak of 518 daily trains on Wednesdays, while weekends see less
93
traffic. The traffic density varies during the day, reaching a peak 19 trains running
simultaneously at any given moment. Rush hour occurs between 6:00 a.m. to 9:00 a.m.,
weekdays.
On Wednesdays during rush hour, 119 trains run in total; however, only 100 trains run routes
long enough to have a significant effect on the capacity of the scenario. Assuming that during
rush hour the model is operating at practical capacity or very close to it, the number of trains
during rush hours can be extrapolated to estimate the practical capacity of the scenario for the
entire day, which results in 800 trains daily (100 trains every 3 hours). This result is very close to
the calculation made with the method previously presented (810 daily trains) and supports the
use of those results for the DUA operational scenario analysis.
Table 33 summarizes the calculations of practical capacity and TUL for this scenario.
Table 33. Practical Capacity Summary for the DUA Operational Scenario
Type of Train Single Type of Train Mix of Trains of the Scenario
TUL
Practical Capacity
(100 percent TUL)
Practical Capacity
(100 percent TUL)
75 percent
TUL
50 percent
TUL
25 percent
TUL
Number of
Trains per
Day
995 810 608 405 203
94
Appendix C: Theoretical Headway Reduction Calculations
Figures 44 through 55 show the theoretical train headway calculations for each of the scenarios
selected for this analysis.
Figure 44. EO-PTC and FMB Train Headway for Empty Steel Coal Cars at 60 mph
Figure 45. EO-PTC and FMB Train Headway for Empty Steel Coal Cars at 30 mph
95
Figure 46. EO-PTC and FMB Train Headway for Loaded Steel Coal Cars at 50 mph
Figure 47. EO-PTC and FMB Train Headway for Loaded Steel Coal Cars at 30 mph
96
Figure 48. EO-PTC and FMB Train Headway for Empty Aluminum Coal Cars at 60 mph
Figure 49. EO-PTC and FMB Train Headway for Empty Aluminum Cars at 30 mph
97
Figure 50. EO-PTC and FMB Train Headway for Loaded Aluminum Cars at 50 mph
Figure 51. EO-PTC and FMB Train Headway for Loaded Aluminum Cars at 30 mph
98
Figure 52. EO-PTC and FMB Train Headway for Empty Intermodal at 70 mph
Figure 53. EO-PTC and FMB Train Headway for Empty Intermodal at 30 mph
99
Figure 54. EO-PTC and FMB Train Headway for Loaded Intermodal at 70 mph
Figure 55. EO-PTC and FMB Train Headway for Loaded Intermodal at 30 mph
100
Appendix D: PTC Braking Rate Calculation
TTCI used the results of TOES simulations developed for multiple FRA PTC braking algorithm
projects [4] to calculate the PTC target braking rates that were used in RTC simulation.
The braking rate is calculated as a linear deceleration rate between the target stopping position
and the start of the simulation at the initial start speed. To simulate the locomotive engineer
initiating braking to avoid PTC enforcement, using the braking enforcement warning from the
onboard PTC system, the start of the simulation is calculated by adding the distance traveled by
the train over a period of 20 seconds at the initial start speed to the braking distance (Figure 56).
Figure 56. Braking Rate Calculation Diagram
The TOES simulations included runs with multiple grade profile inclination and initial train
speeds, as shown in Table 34.
Table 34. Track Profile Inclination and Initial Train Speeds Included in the TOES
Simulation Runs for Each Train Class
The results of the simulation runs were compiled.
Figure 57, Figure 58, and Figure 59 show the histogram of the results obtained for each of the
train classes.
Train Class Trac k Grade Inclination (%)
Flat 10 30 50 60 70
- 0.5 10 30 50 60 70
+ 0.5 10 30 45 50 60
-1.1 10 30 45 55 60 70
+1.5 10 15 20 25
-1.7 25
-2.2 15 20
-2.8 15 20
Flat 10 80 90
+0.5 10
-1.5 10 80 90
+1.5 10 80 90
Expedited
and
Freight
Passenger
Train Speed (MPH)
101
Note that the acceleration rate due to grade was removed from each simulation to eliminate its
influence on the results. This was done because data was pulled from a large number of different
simulations that simulated trains on several different grades. The acceleration rate (mph/s) due to
grade force is 21.94*percent grade.
The grade force is related to the train weight and the percent grade, as shown in Equation 12.
= ( 20 )/2000 (12)
Additionally, the grade force is equal to the mass multiplied by the acceleration as shown in
Equation 13, where the train mass is in slugs, as shown in Equation 14.
 =󰇡
.󰇢
^ (13)
  
 = 󰇡
.󰇢
^  (14)
Resolving Equation 14 in mph/s, results in Equation 15, the acceleration due to the force of
grade.
 =(0.2194 )/ (15)
Figure 57. Histogram of Braking Rates for Train Class Expedited
102
Figure 58. Histogram of Braking Rates for Train Class Freight
Figure 59. Histogram of Braking Rates for Train Class Freight
The median values of the braking rate results calculated for each train class are shown in Table
35. These values were used in the configuration of the Normal service application with PTC
target in RTC.
Table 35. PTC Braking Rates per Train Class
Train Class
Braking Rate (mph/s)
Expedited
0.32
Freight
0.29
Passenger
1.06
Train Type=Man
Histogram of Brake Rate M PH/s (exc luding grade force)
PTC Brake Rate Dat a_3.st a 18v*3953c
-0.1923
-0.1554
-0.1186
-0.0817
-0.0448
-0.0080
0.0289
0.0658
0.1027
0.1395
0.1764
0.2133
0.2501
0.2870
0.3239
0.3607
0.3976
0.4345
0.4713
0.5082
0.5451
0.5820
0.6188
0.6557
0.6926
0.7294
0.7663
0.8032
0.8400
0.8769
0.9138
Brake Rat e MPH/s (exc luding grade force)
0
20
40
60
80
100
120
140
160
180
No of obs
Histogram of Brake Rate M PH/s (ex Ac cel Due to Grade)
PTCL Brake Rate Dat a (passenger). st a 66v*114273c
Include condi tion: v42>10
-0.4936
-0.3890
-0.2843
-0.1797
-0.0751
0.0295
0.1342
0.2388
0.3434
0.4480
0.5527
0.6573
0.7619
0.8665
0.9711
1.0758
1.1804
1.2850
1.3896
1.4943
1.5989
1.7035
1.8081
1.9128
2.0174
2.1220
2.2266
2.3313
2.4359
2.5405
2.6451
Brake Rat e MPH/s (ex A ccel Due to Grade)
0
1000
2000
3000
4000
5000
6000
No of obs
103
Appendix E: Office-To-Locomotive Communications Link Availability
In the current overlay ITC PTC system, there are two message types sent by the back office to
the locomotive that can result in impact on operations if not received by the locomotive onboard
within a specified time period:
Office Segment Poll Messages: Message sent by the back office to the train to provide
information on the current set of mandatory directives and track data.
Wayside Status Relay Service (WSRS) Messages: Wayside Status Messages (WSMs)
sent by the WSRS server at the back office with the latest received status of monitored
field devices received from WIUs.
If a train does not receive the Office Segment Poll Message within a certain timeout period, the
information on mandatory directives and track data becomes outdated. For this reason, after a
pre-determined elapsed time since the last Office Segment Poll message was successfully
received, the locomotive onboard determines that it can no longer rely on that information. The
onboard then prompts the crew with a request to acknowledge that it will disengage from PTC. If
the crew does not respond within a certain time, the locomotive onboard will enforce the train to
stop. It is assumed for this study that the crew acknowledges the request; i.e., the locomotive
onboard disengages in this situation. Office Segment Poll messages are sent periodically every 3
minutes and the locomotive onboard will disengage if three consecutive messages are missed. In
a worst-case scenario, if a coverage gap coincides with the location where the next Office
Segment Poll is sent and persists for more than 6 minutes, the locomotive onboard will miss
three consecutive messages, as illustrated in Figure 60. As a result, the PTC system will not be
protecting train operation if there is a loss of Office-to-Locomotive communications for a
duration of between 6 and 9 minutes. This study assumes 6 minutes as the threshold for
assuming that the locomotive onboard is disengaged.
Figure 60. Coverage Gap Threshold for Office Segment Poll Messages
WSRS messages only impact PTC operation in territories where trains are dependent on WSRS
to receive WSMs. The status of the monitored wayside signaling devices are constantly updated
to WSRS servers. In territories where WIUs do not have their own 220-MHz radios, or where
trains cannot reliably receive WSMs directly from WIU radios, the WSRS server relays WSMs
to trains; thus, trains operating in these territories depend on the Office-to-Locomotive link to
receive WSMs. In territories where WIUs have their own 220-MHz radios, the WIUs
communicate the WSMs directly to the trains without depending on the Office-to-Locomotive
link. The PTC onboard system is currently designed to assume the most restrictive state of a
wayside device if it does not receive the status of that device for more than four 220-MHz radio
superframe cycles, which equates to 16 seconds. Therefore, in territories where WIUs rely on
104
WSRS for communication of WSMs, a loss of Office-to-Locomotive communications for a
duration of 16 seconds when approaching a WIU will cause trains to stop and negatively impact
operations.
Locomotives can communicate with the back office through multiple communication paths,
including Wi-Fi, cellular, and 220-MHz radios. Railroads equip their locomotives with all three
communication paths. The Wi-Fi infrastructure is typically available only at terminals/yards;
thus; the analysis of the availability of the Office-to-Locomotive link in this study included only
the cellular and 220-MHz radio communication paths.
Thus, the unavailability of the Office-to-Locomotive link is determined by the probability that
both communication paths are simultaneously unavailable at a given moment.
TTCI prepared a methodology to account for these conditions that is comprised of the following
steps:
1. Determine the probability of a base station continuous coverage gap greater than 6
minutes.
2. Determine the probability of a cell continuous coverage gap greater than 6 minutes.
3. Determine the probability of cell service being down.
4. Determine the probability of both Steps 1 and 2, OR both Steps 1 and 3.
5. Repeat Steps 1 through 4 for coverage gaps greater than 16 seconds for WSRS territory.
The estimation of base station coverage gap sizes per operational scenario (Step 1 from the list
above) was prepared with the results of RF simulations along railroad tracks.
For the estimation of cell service (Step 3), TTCI used an aggregate number provided by the
railroads (0.997 availability). For the estimation of cell coverage (Step 2), TTCI was provided
with the average cell coverage availability per subdivision by one of the railroads. Because data
was provided as an average for the entire subdivision, but not as discrete values along the tracks,
TTCI was unable to estimate cell coverage gap sizes. As a result, TTCI applied the availability
number as the probability of cell coverage. Cell coverage availability was calculated separately
for DUA (0.995) and non-DUA (0.984) areas.
Base Station Communication Path Availability
An analysis of the impact of base station failures was performed for each operational scenario, as
redundancy of base station coverage is expected to differ for each operational scenario. Two
aspects were included in the analysis:
The impact on PTC protected time when a train cannot communicate with a base station.
The level of redundant coverage typically observed in each operational scenario.
As explained, if there is a loss of Office-to-Locomotive communications for more than 6 minutes
and an Office Segment Poll message is not received, PTC unprotected time will result. In
territories where trains depend on WSRS to obtain the status of WIUs, operations will be
impacted if there is a loss of Office-to-Locomotive communications for more than 16 seconds.
The minimum size of coverage gap that would impact PTC protection is dependent on the speed
of the train; i.e., the slower a train operates, the longer it will remain in a coverage gap. Table 36
105
shows the coverage gap sizes that would impact PTC operation that are WSRS dependent for
various train speeds.
Table 36. Coverage Gap Size Impacting PTC Protection Due to Not Receiving WSM in
WSRS Territory, as a Function of Train Speed
Train Speed (mph)
40
30
24.6
20
16-second Gap Size (feet)
939
704
577
469
Table 37 shows the coverage gap sizes that would impact PTC protection as a result of not
receiving Office Segment Poll messages.
Table 37. Coverage Gap Size Impacting PTC Protection Due to Not Receiving Office
Segment Poll Messages, as a Function of Train Speed
Train Speed (mph)
40
30
24.6
20
6-minute Gap Size (miles)
4.0
3.0
2.5
2.0
The coverage gap resulting from the failure of a base station is dependent on the level of
redundancy; i.e., how much coverage can be provided by other base stations in the vicinity of the
failed base station. TTCI developed a three-step method to determine the typical coverage gaps
caused by single base station failure for each of the operational scenarios:
1. Simulate the failure of one base station at a time within a defined area (such as a DUA or
a single subdivision) using an RF simulation tool (Planet™), which generates a list of
points along the track that are below coverage requirements (coverage gap results).
2. Export coverage gap results to a Microsoft Excel file and visualize in Google Earth
mapping service to estimate the size of the coverage gap.
3. Process coverage gap sizes and tabulate for the area being analyzed.
Figures 3 and 4 provide a visualization of the coverage gap estimation process.
E
Figure 61. Illustration of Coverage Gaps Resulting from the Failure of a
Base Station along the Tracks of a Railroad Subdivision
106
Figure 62. Illustration of Coverage Gap Size Estimation, Using Google Earth
TTCI executed the above method for all operational scenarios using selected reference territories
agreed to by the participating railroads. The selected reference territories include subdivisions
from BNSF, CSX and UP for the signaled single-, double- and triple-track and dark territory
scenarios. For the DUA operational scenario, it includes subdivisions for all railroads operating
in the Chicago and Dallas-Fort Worth DUAs. Note that for the DUA operational scenario,
coverage provided by foreign base stations (i.e., base stations belonging to a railroad other than
the railroad that owns the tracks where coverage is being analyzed) was considered. For all other
operational scenarios, coverage provided by non-U.S. base stations was not considered.
TTCI used results of PTC RF network designs studies developed for DUAs [2] and for the
Northeast corridor [5] to calculate the coverage gaps in case of base station failure. Table 38
shows the average gap sizes if one base station failed for each operational scenario assuming an
average normal train speed of 24.6 mph and average reduced speed of 20.0 mph (and assuming
no other communications path was available). The two rightmost columns in Table 38 show the
estimated gap sizes for each operational scenario due to base station failure. The Non-WIU
Communication (WSRS Dependent) column relates to the impact caused by not receiving WSMs
from the WSRS server (through a base station) and this would affect territories where there is
exclusive dependency on receiving WSMs from WSRS servers. The PTC Disengagement (No
BOS Comms) column relates to the impact caused by outdated mandatory directives and track
data information, which affects all territories. Typically, railroads configure their tracks with a
large predominance of WIU configuration on their tracks – either WIUs equipped with radios
(i.e., not exclusively depending on WSRS) or not (i.e., exclusive WSRS dependency).
107
Table 38. Average Gap Sizes Resulting from Base Station Failure
for Each Operational Scenario
Operation
Scenario
Reference
Average Gap Length (miles)
MTA Territory
/Subdivision RR Route
Miles
# of Base
Stations
Non-WIU
Communication
(WSRS
Dependent)
PTC
Disengagement
(No BOS
Comms)
DUA Chicago
Chicago
DUA ALL 1,157 38 0.62 0.04
DFW
DFW DUA
ALL
435
26
Triple-
Track
Kansas
City Kearney UP 140 7 2.14 0.00
Double-
Track
Chicago
Erie
CSX
90
8
4.47 0.87
Chicago
Mendota
BNSF
125
5
Single-
Track
Chicago
Joliet
UP
116
7
9.33 3.15
DFW
Plainville
Slaton BNSF 145 7
DFW
Wichita
BNSF
210
10
Charlotte
Monroe
CSX
141
8
Dark
Territory
New York
St. Lawrence
CSX
137
7
3.41 10.73
Wichita
Enid
UP
85
3
The average gap sizes calculated for each operational scenario were included in the estimation of
the availability of the Office-to-Locomotive link in conjunction with the probability that a train
reaches a base station that is failed at a given time, and the probability that there is not cell
service or coverage.
108
Appendix F: Detailed PTCIE Train Delay Results
Tables 39 through 50 show the results of train delay per PTCIE. The results were calculated at 50
percent TUL and do not include operational disruption events.
Table 39. En route Onboard Software Recoverable Train Delay per
Operational Scenario and Train Control Method
Table 40. Back Office Downtime Train Delay per
Operational Scenario and Train Control Method
Table 41. PTC Wayside Failure at CP Train Delay per
Operational Scenario and Train Control Method
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.14726 N/A N/A 0.16888
Single Track 2.87053 3.17021 2.98766 2.82026
Double Track 2.92683 3.24328 3.07916 2.66021
Triple Track 0.11287 0.10272 0.09287 0.10263
Dense Urban Area 1.71198 1.68643 1.67816 1.51531
Operational
Scenario
Enroute Onboard Software Recoverable
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00005 N/A N/A 0.00006
Single Track 0.00009 0.00003 0.00007 0.00013
Double Track 0.00003 0.00002 0.00003 0.00004
Triple Track 0.00003 0.00002 0.00002 0.00004
Dense Urban Area 0.00008 0.00012 0.00014 0.00014
Back Office Downtime
Total Train Delay (Minutes/100,000 Train-miles)
Operational
Scenario
Overlay PTC EO-PTC QMB FMB
Dark Territory N/A N/A N/A N/A
Single Track 0.00309 0.00291 0.00246 0.00291
Double Track 0.00286 0.00312 0.00229 0.00296
Triple Track 0.00215 0.00205 0.00173 0.00198
Dense Urban Area 0.00421 0.00446 0.00377 0.00427
Operational
Scenario
PTC Wayside Hardware Failure at CP
Total Train Delay (Minutes/100,000 Train-miles)
109
Table 42. PTC Wayside Failure at IS Train Delay per
Operational Scenario and Train Control Method
Table 43. PTC Wayside Failure at Controlled Switch Train Delay per
Operational Scenario and Train Control Method
Table 44. En route Onboard Hardware Non-Recoverable Train Delay per
Operational Scenario and Train Control Method
Table 45. Sync Error Train Delay per Operational Scenario and Train Control Method
Overlay PTC EO-PTC QMB FMB
Dark Territory N/A N/A N/A N/A
Single Track 0.00276 0.00302 0.00790 0.00327
Double Track 0.00312 0.00437 0.00777 0.00395
Triple Track 0.00120 0.00090 0.00131 0.00120
Dense Urban Area 0.00066 0.00070 0.00094 0.00066
Operational
Scenario
PTC Wayside Hardware Failure at IS
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.02700 N/A N/A 0.02700
Single Track N/A N/A N/A N/A
Double Track N/A N/A N/A N/A
Triple Track N/A N/A N/A N/A
Dense Urban Area N/A N/A N/A N/A
Operational
Scenario
PTC Wayside Hardware Failure at Controlled Switches
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00495 N/A N/A 0.00499
Single Track 0.03883 0.03969 0.03948 0.04472
Double Track 0.03481 0.04372 0.03855 0.03068
Triple Track 0.00109 0.00101 0.00093 0.00124
Dense Urban Area 0.00698 0.00993 0.01109 0.00707
Operational
Scenario
Enroute Onboard Hardware Non-Recoverable
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00852 N/A N/A 0.00772
Single Track 0.02035 0.03016 0.07000 0.04998
Double Track 0.01959 0.01954 0.00976 0.02914
Triple Track 0.00059 0.00118 0.00177 0.00353
Dense Urban Area 0.03537 0.02323 0.03370 0.04834
Operational
Scenario
Sync Error
Total Train Delay (Minutes/100,000 Train-miles)
110
Table 46. BOS-Loco Link Train Delay per Operational Scenario and
Train Control Method
Table 47. En route Operator Error Speed Enforcement Train Delay per
Operational Scenario and Train Control Method
Table 48. En route Operator Error Other Enforcement Train Delay per
Operational Scenario and Train Control Method
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00001 N/A N/A 0.00001
Single Track 0.00003 0.00003 0.00011 0.00009
Double Track 0.00000 0.00000 0.00000 0.00000
Triple Track 0.00000 0.00000 0.00000 0.00000
Dense Urban Area 0.00000 0.00000 0.00000 0.00000
Operational
Scenario
BOS-Loco Link
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00262 N/A N/A 0.00283
Single Track 0.04785 0.05066 0.03696 0.04701
Double Track 0.02962 0.04267 0.03608 0.04895
Triple Track 0.00139 0.00139 0.00139 0.00277
Dense Urban Area 0.01980 0.02146 0.02076 0.01985
Operational
Scenario
Enroute Operator Error - Speed Enforcement
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.02185 N/A N/A 0.02357
Single Track 0.39862 0.42203 0.30787 0.39164
Double Track 0.24677 0.35548 0.30060 0.40780
Triple Track 0.01158 0.01155 0.01154 0.02307
Dense Urban Area 0.16496 0.17875 0.17293 0.16534
Operational
Scenario
Enroute Operator Error - Other Enforcement
Total Train Delay (Minutes/100,000 Train-miles)
111
Table 49. Initialization Delay Train Delay per
Operational Scenario and Train Control Method
Table 50. Initialization Onboard Hardware Failure Train Delay per
Operational Scenario and Train Control Method
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00566 N/A N/A 0.00560
Single Track 0.08114 0.08018 0.07976 0.07972
Double Track 0.07813 0.07792 0.07787 0.07747
Triple Track 0.00472 0.00470 0.00470 0.00470
Dense Urban Area 0.04701 0.04631 0.04480 0.04283
Operational
Scenario
Initialization Delay
Total Train Delay (Minutes/100,000 Train-miles)
Overlay PTC EO-PTC QMB FMB
Dark Territory 0.00000 N/A N/A 0.00156
Single Track 0.02261 0.02234 0.02222 0.02221
Double Track 0.02177 0.02171 0.02170 0.02158
Triple Track 0.00131 0.00131 0.00131 0.00131
Dense Urban Area 0.01310 0.01290 0.01248 0.01193
Operational
Scenario
Initialization Onboard Hardware Failure
Total Train Delay (Minutes/100,000 Train-miles)
112
Appendix G: PTC Requirements for Railroad Network Simulation
Background and Scope
This document contains the list of requirements that a Railroad Network Simulator (“the
Simulator”) must satisfy to provide the features needed for the Higher Reliability and Capacity
Train Control (HRCTC) project.
It is assumed that the Simulator already implements functions to simulate a railroad network
model including train operations in signaled and non-signaled territories.
The requirements herein described aim to provide functions in the Simulator to analyze potential
impacts and/or benefits with the implementation of PTC and potential new methods of train
control in a railroad network. The Simulator shall provide functions to simulate PTC-related
failure events (e.g., failures in PTC components or human errors impacting train operation) and
their impacts on train operations, as well as functions to quantify benefits (e.g., the ability to not
necessarily reduce speed at approach signals on PTC-equipped trains, or the implementation of a
moving block concept).
The requirements are divided in three groups, per planned development phases. The first phase
includes the requirements needed to simulate PTC as it is being currently deployed by U.S.
railroads (PTC Overlay). The second phase includes the requirements needed to simulate
currently envisioned technologies/methods that could be applied in addition/extension to PTC;
specifically moving block methods. A third development phase may be required if additional
features are needed to address some of the analysis required and/or due to new
methodologies/technologies that can be identified as the HRCTC project evolves.
Each section of this document generally contains two parts: narrative text and explicit
requirements. The narrative text includes background information, goals, and other supplemental
information provided to clarify the requirements. The explicit requirements, each containing the
word “shall,” follow in a numbered or lettered list beneath the narrative text.
Concepts and Terminology
For purposes of this document, the following concepts and terminology will be used:
Control Points and Control Blocks:
- In a Manual Block System (MBS), such as Track Warrant Control (TWC), a control
point is any point identified in the dispatching system where one train can clear the
main track to allow another train to pass. It may be at a siding or a junction. A control
block extends between two successive control points.
- In Centralized Traffic Control (CTC) systems (including PTC overlay systems), a
control point is any signal that can be “controlled” by the train dispatcher; that is, a
dispatcher may request a permissive signal or may command the signal to a Stop
indication. The vast majority of controlled signals are at power-operated switch
locations, but a controlled signal may also be placed at a location where a dispatcher
may need to hold a train. All controlled signals are absolute signals and a train may
not pass one that is displaying a Stop indication without dispatcher authority. A
control block extends between two successive controlled signals governing
movement in the same direction.
113
- Note that signals governing entry to an automatic interlocking (railroad crossing at
grade) are also absolute signals, requiring specialized procedures to pass in the event
of a signal system failure. These are not considered as controlled signals for purposes
of defining a control block.
Signal Block: Extends between two successive signals governing movement in the same
direction.
Phase 1 Functional Requirements – PTC Overlay Operation
The list of requirements for this phase is divided into six groups:
1. Overall system configuration
2. Train braking in PTC operation
3. PTC response to signal aspect upgrades
4. PTC-related events that impact train operations.
5. Rules that govern operations for trains under PTC failure (fallback operation).
6. Configurable signal rules
The requirements under each group are listed in the following subsections.
Overall System Configuration
The following requirements describe overall PTC configuration parameters for the Simulator.
For trains to operate under PTC control, both the track and trains must be configured for PTC
operation. Thus, the Simulator shall provide features to allow the user to set tracks and trains in
such condition.
The Simulator shall allow the user to display and select the sets of PTC configurations that will
be active for a simulation run.
Table 51 lists the requirements to be satisfied by the system under this group.
114
Table 51. Requirements for Overall System Configuration
Req. ID
Req. Description
SC01
The Simulator shall allow the user to toggle ON/OFF tracks for PTC Mode operation at
different levels:
1. To the entire model
2. To designated subdivisions within the network and/or to designated segments
(between control points or model nodes) within one or more subdivisions
SC02
The Simulator shall allow the user to toggle ON/OFF trains to operate in PTC Control at
different levels:
1. To a specific train
2. To a class of trains (such as passenger, freight, etc.)
3. To a subgroup of trains
4. To all trains in the entire model
SC03
The Simulator shall allow the user to toggle ON/OFF an entire model to operate in PTC
Mode.
When turned ON, The Simulator shall activate PTC functions for the tracks set to PTC
Mode ON and for trains set to PTC Control ON.
SC04
The Simulator shall allow the user to display and select the sets of PTC configuration
parameters that will be active in a simulation run.
The sets of PTC configuration parameters:
1. Train braking in PTC operation
2. PTC response to signal upgrades
3. Individual train operation impact events
4. WIU failure events
5. Script mode events
6. Fallback operation.
SC05
The Simulator shall allow the user to configure maximum train speeds (in mph) to be used
under certain operational scenarios:
Restricted Speed (SC05_RS). Default value = 20 mph
Medium Speed (SC05_MS). Default value = 30 mph
SC06
1. The Simulator shall allow the user to indicate which method of PTC operation
should be applied for the tracks set for PTC Mode operation:
2. PTC Overlay (default): trains are simulated per Phase1 requirements.
3. QMB: trains are simulated per Phase1 and Phase 2 requirements .
4.
FMB: trains are simulated per Phase1 and Phase 2 requirements..
SC07
The Simulator shall allow the user to indicate the method of PTC operation (SC06) per the
following:
1. For an entire subdivision
2. For a group of subdivisions
3. For the entire model
115
Requirements for Train Braking in PTC Operation
This group includes the requirements for the simulation of train braking behavior in PTC
operation.
In concept, there are three types of train braking curves the Simulator should implement:
1. Full-Service Application: How train actually brakes when a PTC enforcement or critical
failure occurs.
2. Normal Service Application: The manner in which the engineer brakes at events that
are not affected by PTC, such as crew change points or station stops. Trains not operating
under PTC will also use Normal Service Application.
3. PTC Braking Curve: How the OBC will calculate the braking curve at events that are
monitored by PTC, such as enforceable stops (stop signals and roadway worker work
limits) and enforceable speed reductions (civil speed reductions, temporary speed
reductions and turnout speeds). Currently, this is more conservative than normal service
braking; however, ways to make the prediction of enforcement braking rate closer to
actual enforcement braking rate (full-service application) are being
investigated/developed and will be likely implemented as PTC deployment evolves.
Figure 63 illustrates those three types of braking curves.
Figure 63. Illustration of the Three Conceptual Types of Braking Curves
Prior to enforcement, a count-down of time to enforcement is displayed to the train engineer. The
start of reduction (SoR) in train speed under train engineer control occurs several seconds before
the countdown reaches zero in the OBC display to prevent unwanted initiation of enforcement
braking. Typically, the faster the train is operating, the earlier the train engineer will start braking
the train to ensure that the PTC system detects that the train is under control. Figure 64 illustrates
the effect, showing the train engineer’s reaction in distance.
It is also known that the SoR is not only dependent on the train speed but also on the train type. For
example, a typical SoR of a freight train travelling at 60 mph would be around 20 to 30 seconds,
while for a passenger train it would be typically lower (5 to 10 seconds). A freight train travelling
at 20 mph would also typically have a SoR lower than when the same train is at 60 mph. For that
116
reason, the Simulator will take a typical response time at a certain speed (for example, 60 mph) and
interpolate it proportionally to the PTC Braking Curve for other train speeds.
For practical purposes, the engineer braking with PTC will become the PTC Braking Curve
(calculated by the OBC) plus the reaction time of the train engineer to TTE.
Figure 64. Illustration of the Reaction of the Train Engineer to the
Time to Enforcement Indication in the OBC
Table 52 lists the requirements to be satisfied by the Simulator, based on these conceptual
braking curves above described.
117
Table 52. Requirements for Train Braking in PTC Operation
Req. ID
Req. Description
TB01
For trains set to PTC Control ON and operating on tracks with PTC Mode ON, the
Simulator shall simulate train braking operation based on three braking rates in mph/sec: 1)
Full-Service Application; 2) Normal Service Application; and 3) Engineer Braking with
PTC.
1. Full-Service Application rate (TB01_FSA) shall be used for PTC system onboard
failures to determine where the train will stop as a result of the failure.
2. Normal Service Application rate (TB01_NSA) shall be used for train stops when
the train engineer is not influenced by the PTC onboard system, such as stops at
yards or other work points to perform work; crew change points; or station stops
(unless the braking curve due to a stop signal beyond the station stop is more
restrictive).
3. PTC Braking Curve rate (TB01_PBC) shall be used for braking when
approaching stop signals, signal speed reductions, civil speed reductions,
temporary speed reductions (Form A), work limits in effect (Form B), and entering
non-controlled track (Restricted Speed).
- The Simulator shall also account for the Start of Reaction time of the train
engineer, (TB03_SOR), to start the braking application.
- Exception: When the braking rate of the PTC Braking Curve is greater than the
braking rate of the Normal Service Application for any class of train, the
Simulator shall use the Normal Service Application braking rate.
TB02
The Simulator shall allow the user to set train deceleration values in mph/sec. for the three
different braking rates defined in TB01:
For a specific train
For a class of trains (such as passenger, freight, etc.)
For a subgroup of trains
For all trains in the entire model
TB03
The Simulator shall allow the user to set the Start of Reaction time (TB03_SOR), in
seconds for a given speed (in mph):
For a specific train
For a class of trains (such as passenger, freight, etc.)
For all trains in the entire model
TB04
The Simulator shall allow the user to display the list of existing train braking configuration
parameters.
TB05
The Simulator shall allow the user to select an entry from the list and perform an action,
per the following:
1. ACTIVATE The Simulator shall make the selected entry Active.
2. EDIT The Simulator shall open the selected entry and allow the user to modify
its braking parameters (TB01 to TB03).
118
Req. ID
Req. Description
3. NEW The Simulator shall add a new entry in the list and:
a. The Simulator shall allow the user to give a name to the entry.
b. The Simulator shall allow its braking parameters (TB01 to TB03) to be
modified by the user.
4. DELETE – The Simulator shall delete the selected entry, after confirmation of the
action from the user.
5. RENAME – The Simulator shall allow the user to change the name of the selected
entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
TB06
The Simulator shall allow the user to save an entry that is being edited as a new entry in the
list.
Requirements for PTC Response to Signal Aspect Upgrades
Each signal aspect/indication identifies the requirements at this signal and what is to be expected
at the next signal. A signal indication upgrade occurs when a condition changes ahead to permit
the signal to convey an indication that is less restrictive than before the condition changed. When
a train is operating without PTC control, the train engineer is typically driven by the last signal
aspect observed; the operational target cannot be changed until the next aspect can be seen. With
PTC control, signal aspects are conveyed to the train engineer through the OBC display when
they actually happen, which many times will be at a location ahead of the location where the next
aspect would become visible to the train engineer. Generally, in these cases the train engineer is
taking actions to slow the train to a slower speed or to a stop. On becoming aware of a signal
indication upgrade, the train engineer may continue at the current train speed to the upgraded
signal and then handle the train at that signal in accordance with the new indication.
This group of requirements describes how the Simulator must react when a signal ahead of the
train is upgraded when the train is under PTC Control and operating on tracks configured with
PTC Mode ON.
Table 53 lists the requirements to be satisfied by the Simulator under this group.
119
Table 53. Requirements for PTC Response to Signal Aspect Upgrades
Req. ID Req. Description
RU01 The Simulator shall allow the user to turn the Signal Aspect Upgrades feature ON or
OFF.
When turned OFF, Signal Aspect Upgrades features (RU02 to RU05) shall not be in
effect.
RU02 For trains set to PTC Control ON and operating on tracks with PTC Mode ON, when
the signal aspect/indication in advance of a train is upgraded and the train has been
operating with a Stop and Proceed signal authority or a Restricted Proceed signal
authority, or a Restricting signal authority, the Simulator shall continue simulating
the train to the next signal in advance of the train at Restricted Speed (SC05-RS).
RU03 For trains set to PTC Control ON and operating on tracks with PTC Mode ON, when
the signal aspect/indication in advance of a train is upgraded and the train is
operating under a restrictive signal authority other than those in RU01 towards that
signal, the Simulator shall simulate the resumption of speed per the upgraded signal
aspect/indication four seconds after the signal aspect upgrade.
RU04 The Simulator shall allow the user to define at what sight distance (in feet) the train
engineer will be able to see the next signal, per the following:
_For the entire model (RU04_SDM) default: 500 feet
_For a subdivision (RU04_SDS) default: empty
_For an individual signal (RU04_SDI) default: empty
Configuration values defined for subdivision supersedes values informed for the
entire model. Configuration values defined for individual signals supersedes values
informed for subdivision and entire model.
RU05 For trains set to PTC Control OFF, when the signal aspect/indication in advance of a
train is upgraded and the train is operating under a restrictive signal authority other
than those in RU01 towards that signal, the Simulator shall simulate the resumption
of speed per the upgraded signal aspect of the next signal when the train is within
sight distant from the next signal, as specified in RU04.
RU06
The Simulator shall allow the user to display the list of existing Response to Signal
Aspect Upgrade Configuration Parameters entries.
RU07 The Simulator shall allow the user to select an entry from the list and perform an
action, per the following:
1. ACTIVATE The Simulator shall make the selected entry Active.
2. EDIT The Simulator shall open the selected entry and allow the user to
modify its parameters (RU01 to RU05).
3. NEW The Simulator shall add a new entry in the list, and:
a. The Simulator shall allow the user to give a name to the entry
b. The Simulator shall make its parameters (RU01 to RU05) enabled to
be modified by the user.
120
Req. ID Req. Description
4. DELETE – The Simulator shall remove the selected entry, after confirmation
of the action from the user.
5. RENAME – The Simulator shall allow the user to change the name of the
selected entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
RU08 The Simulator shall allow the user to save an entry that is being edited as a new entry
in the list.
121
PTC-related Events that Impact Train Operations
There are several PTC-related events that can impact train operations. Table 54 lists the potential
events currently identified and their impact in train operation.
Table 54. List of PTC-Related Events that Impact Train Operations
No. Category PTC Operation Impact Event Impact in train operation
1 Train
Initialization
Issues with system (various
potential sources) causing train
delay at departure time.
Causes delay to train departure. Train
subsequently departs with normal PTC
operation.
2 Human error at system
configuration/initialization causing
train delay at departure time.
Causes delay to train departure. Train
subsequently departs with normal PTC
operation.
3 Issues (various potential sources,
including human error), causing
PTC disengagement (missed
opportunity).
Causes train to operate disengaged per
PTC Overlay Fallback mode until
destination.
4 Onboard Event
En route
Onboard failure causing
enforcement (non-recoverable).
Causes train to stop, cut-out brakes, and
resume operation per PTC Overlay
Fallback mode.
5 Onboard failure causing
enforcement (recoverable).
Causes train to stop, resume normal
PTC operation after delay.
6 SW Defect causing enforcement
(recoverable).
Causes train to stop, resume normal
PTC operation after delay.
7 State change from "Active to
Disengaged" (non-recoverable)
Causes train to slow to fallback speed,
operate per PTC Overlay Fallback mode
until destination.
8 State change from "Active to
Disengaged" (recoverable)
Causes train to slow to fallback speed,
operate per PTC Overlay Fallback mode
until recovery.
9 Human Error
En route
Non-confirmation of switch
position under WIU failure in non-
signaled territory causing train
enforcement.
Causes train to stop if crew does not
confirm switch position in time. Train
resumes operating at normal PTC
operation after delay.
10 Human error at system
configuration/initialization causing
train enforcement.
Causes train to stop, resume operating
at normal PTC operation after delay.
11 Human error during operation
causing train enforcement.
Causes train to stop, resume operating
at normal PTC operation after delay.
122
No. Category PTC Operation Impact Event Impact in train operation
12 WIU Non-
communicating
WIU Msg Status not received from
intermediate signal.
Causes a Stop target to be applied at the
intermediate signal. If the signal
indication is Restricting, the Stop target
is lifted when the train speed is at or
below the maximum speed for
Restricted Speed and a Restricted Speed
limit is applied for the next signal
block. If the signal indication is Stop
and Proceed, the Restricted Speed limit
is applied after the train has stopped.
13 WIU Msg Status not received from
absolute signal.
Causes train to slow down per stop
target at signal, stop to obtain dispatch
authority and operate at Restricted
Speed through next signal block then
resume normal PTC operation.
14 WIU Msg Status not received from
monitored switch in non-signaled
territory.
Causes train to slow down per stop
target at inoperative WIU, operate at
normal permitted speeds after crew
confirms switch position.
15 Office Fault Synchronization error of train with
Office
Causes the train to slow to fallback
speed, operate per PTC Overlay
Fallback mode until recovery.
16 Office services are down. Causes all trains registered to the Office
Servers to slow to fallback speed,
operate per PTC Overlay Fallback mode
until recovery.
17 Base Station
Non-
communicating
Base station failure causing trains
to disengage PTC (WIUs have
own radio).
When one of the two conditions below
(whichever happens first) is reached,
train will resume normal PTC operation
as indicated:
1) BOS Heartbeat timeout (558
seconds). Train slows to fallback speed,
operate per PTC Overlay Fallback mode
until coverage is regained.
2) Train reaches end of current
movement authority and needs a new
TW. Train will stop, resume per PTC
Overlay Fallback mode after obtaining
new movement authority until coverage
is regained.
123
No. Category PTC Operation Impact Event Impact in train operation
18 Base station failure causing WIU
messages not to be transmitted
(WIUs do not have own radio).
When one of the three conditions below
(whichever happens first) is reached,
train will resume operation as indicated:
1) BOS Heartbeat timeout (558
seconds). Train slows to fallback speed,
operate per PTC Overlay Fallback mode
until coverage is regained.
2) Train reaches end of current
movement authority and needs a new
TW. Train will stop, resume per PTC
Overlay Fallback mode until coverage
is regained.
3) Train needs to communicate with a
WIU. Train will operate as per WIU
non-communicating (events 12, 13, and
14.)
19 Comms
Backbone
Failure
Trunk communication line
controlling multiple base stations
fails.
Causes trains under the coverage of the
failed base stations to be affected
according to what is described in the
Base Station non-communicating
condition (events 17 and 18), depending
on the configuration of the bases.
The impact in train operation varies depending on the type of event, as indicated in Table 54
(Impact in Train Operation column). Some events cause just the disengagement of PTC or a train
delay while others will cause a train to stop. Some events may be recoverable (i.e., return to
normal PTC operation immediately after the event occurs or after some time), or not (i.e., train
will operate under PTC Fallback mode until destination). The system shall provide the user the
ability to configure each one of the events in Table 54 with their own configurable parameters.
Note that for Phase 1 development, only event types 1 to 15 need to be included. Events 16 to 19
may be included in Phase 3, if needed.
The PTC Operation Impact events are divided in the list of requirements into two groups:
1. Individual Train Operation Impact EventsThese are events that are specific to one
individual train, and thus affect directly that train only (such as events 1 to 11 and 15).
2. WIU Failure EventsThese are related to WIU failures (such as events 12, 13, and 14).
When a WIU fails, all PTC-controlled trains that operate across that failed WIU will be
affected until it is repaired and restored to normal operation; i.e., potentially this type of
events can affect multiple trains.
PTC Operation Impact events will also have to be triggered in the Simulator per the following
criteria:
1. Script Mode: PTC-related failure events set to specific train/trains; each at a specific
location; each at a specific time. There can be more than one scripted event per
simulation run.
124
2. Random Mode: PTC-related failure events are triggered based on a user-defined
probability.
Requirements for Individual Train Operation Impact Events
Table 55 lists the requirements to be satisfied by the system for each of the events that impact
individual trains (such as events 1 to 11 and 15, from Table 54).
Table 55. Requirements for Individual Train Operation Impact Events
Req. ID Req. Description
IO01 The Simulator shall allow the user to view the list of existing Individual Train
Operation Impact Configuration Parameters.
IO02 The Simulator shall allow the user to select an entry from the list of Individual Train
Operation Impact Configuration and perform an action, per the following:
1. ACTIVATE The Simulator shall make the selected entry Active.
2. EDIT The Simulator shall open the selected entry and allow the user to
modify its parameters (IO04 to IO21).
3. NEW The Simulator shall add a new entry in the list and:
a. The Simulator shall allow the user to give a name to the list.
b. The Simulator shall make its parameters (IO04 to IO21) enabled to be
modified by the user.
4. DELETE – The Simulator shall remove the active entry, after confirmation
of the action from the user.
5. RENAME – The Simulator shall allow the user to change the name of the
selected entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
IO03 The Simulator shall allow the user save an entry that is being edited as a new entry in
the list.
IO04 The Simulator shall allow the user to ADD, EDIT or DELETE events from the active
Individual Train Event Configuration Entry.
Each entry in the list will have multiple fields to be configured, as described in the
next requirements.
IO05 The Simulator shall allow the user to enter/edit the name of the event type. The field
shall be alphanumeric with up to 60 characters.
125
Req. ID Req. Description
IO06 The Simulator shall allow the user to select individually for each Individual Train
Operation Impact event, which type of trigger should be used for the event, either
“SCRIPT,” “RANDOM,” or “NONE” mode:
SCRIPT – The Simulator shall trigger the event per the triggering commands
included in the script.
RANDOM The Simulator shall trigger the event per the probability number
defined for the event (per IO08_PRO).
NONEThe Simulator shall not trigger the event during simulation.
IO07 The Simulator shall trigger events only to affect trains configured with PTC Control
ON and operating on tracks that are configured with PTC Mode ON.
IO08 The Simulator shall allow the user to set a probability value to trigger each failure
event to occur based on one or more of the following conditions:
Simulation clock time since the beginning of the simulation (IO08_SCT)
After total train-miles of the simulation reaches a value provided by the user
(IO08_TTM).
After total train-hours of the simulation reaches a value provided by the user
(IO08_TSH).
IO09 For failure events that will be triggered randomly (per IO06), when a trigger event is
reached, the Simulator shall randomly select an active train configured with PTC
Control ON and apply the triggered failure to that train. For train-mile and train-hour
triggers, when a failure is applied to a train, the respective counters shall be reset,
ready for a new trigger event.
IO10 The Simulator shall allow the user to set under which train operation status the event
should occur:
Departure: The Simulator shall trigger the event at departure time (before
train departs from origin).
En route: The Simulator shall trigger the event after train departs from its
origin.
IO11 The Simulator shall allow the user to set whether the event causes enforcement to the
train or not (IO11-ENF).
IO12 The Simulator shall allow the user to set whether train enforcement is to happen
immediately when the event occurs or at the next speed restriction target (IO12-
BRM).
IO13 If the event is set to cause enforcement to the train (per IO11-ENF) and it causes an
immediate train brake application (per IO12-BRM), when it occurs the Simulator
shall immediately apply Full-service Application Brakes, (per TB01_FSA).
126
Req. ID Req. Description
IO14 If the event is set to cause enforcement to the train (per IO11-ENF) and it causes the
train brake application at the next speed restriction target (per IO12-BRM), the
Simulator shall apply Full Service Application (per TB01_FSA) starting the braking
application at the point where the braking curve would start for the next target speed
reduction.
The next target speed reduction can be determined by any of the following:
Signal aspects
Temporary Speed Restriction/Form A
MOW Work Limits/Form B
Civil Speed Reduction
Switch speed
IO15 The Simulator shall allow the user to set whether the event causes an additional delay
to the train or not (IO15-TDE).
IO16 If the event causes a delay to the train (per IO15-TDE), the Simulator shall allow the
user to configure the minimum and maximum time (in hours and minutes) that the
train will be delayed until it can resume operations.
IO17 If an event is set to cause a delay to a train when it occurs (per IO15-TDE), the
Simulator shall restore operations for the train after a randomly generated time delay
using a uniform distribution between a defined minimum and maximum delay (IO16-
MDE).
IO18 The Simulator shall allow the user to set whether the event causes the train to
disengage from PTC or not (IO18-DIS).
IO19 If the event causes the train to disengage from PTC (per IO18-DIS), the Simulator
shall allow the user to set whether the train will restore to Normal PTC operation or
not (IO19-RNO).
IO20 If the train is to restore to Normal PTC Operation after it resumes operation (per
IO19-RNO), the Simulator shall allow the user to configure the minimum and
maximum time (in hours and minutes) that the train will operate with PTC
disengaged (IO20-MDI).
IO21 If an event is set to cause a train to restore to Normal PTC Operation (per IO19-
RNO), the Simulator shall restore normal PTC operations for the train after a
randomly generated time delay using a uniform distribution between a defined
minimum and maximum time to restore to Normal PTC Operation (per IO20-MDI).
If the minimum and maximum times are set to 00:00 (per IO20-MDI), the Simulator
shall restore Normal PTC Operation immediately after the train resumes its operation.
IO22 If an event causes a train to disengage from PTC (per IO18-DIS), the Simulator shall
model that train to function per the PTC Fallback Operation while the train has PTC
disengaged.
127
Req. ID Req. Description
IO23 The Simulator shall record all the impact events that occurred during a simulation
run, including:
ID of the train impacted by the event.
Event type
Timestamp when event occurred.
Location the train was when event occurred.
Train stop time duration, if train was enforced.
Timestamp when train was restored to normal PTC operation, if train was
able to restore.
IO24 The Simulator shall allow the user to retrieve and visualize the impact events that
occurred during a simulation run.
IO25 The Simulator shall allow the user to export the impact events to an external file in
CSV format.
Table 56 illustrates a potential design for an interface where the user would configure parameters
for Individual Train Operation Impact events.
Table 56. Potential Interface Design/Layout for Individual Train Operation Impact Event
Event Name
Trigger
Mode
(Random/Sc
ript/NONE)
Probabilit y
of
Occur rence
(%)
Train
Operation
Status
(Departure/
Enroute)
Causes
Enfor cement to
Tra in ?
Causes
Del ay to
Tra in ?
Minumum
Del ay
(hh:mm)
Max imum
Del ay
(hh:mm)
Causes
Tra in to
Di senga ge
PTC?
Res tores to
Norma l PT C
Operation?
Mi nimum
Tim e to
Res tore to
Norma l PT C
Operation
(hh:mm)
Max imum
Tim e to
Res tore to
Norma l PT C
Operation
(hh:mm)
Train De parture Del ay
due to Human error
RA MDON 0. 00055 DEP N Y 0:20 0:40 N N 0: 00 0:00
Train De parture Del ay
due to System error
RA MDON 0. 00055 DEP N Y 0:20 0:40 N N 0: 00 0:00
Train Diesengagement
at Departu re
RA MDON 0. 00055 DEP N N 0: 00 0:00 Y N 0:00 0: 00
Onboard failure causing
enforcement (non-
recoverable).
SCRIPT 0. 00066 ENR Y Y 0:10 0:30 Y N 0:00 0: 00
XXXXXXXXXXXXXXXX xxx 9.99999 xxx Y/N Y/ N hh:mm hh:mm Y/N Y/N hh:mm hh:mm
XXXXXXXXXXXXXXXX xxx 9.99999 xxx Y/N Y/ N hh:mm hh:mm Y/N Y/N hh:mm hh:mm
XXXXXXXXXXXXXXXX xxx 9.99999 xxx Y/N Y/ N hh:mm hh:mm Y/N Y/N hh:mm hh:mm
128
Requirements for WIU Failure Events
When a WIU fails, trains approaching the location where the WIU is monitoring (Control Point
or Intermediate Signal in signaled territory or a Monitored Switch in non-signaled territory), will
be impacted (such as events 12, 13, and 14 from Table 54).
For signaled territories, the impact varies depending on whether the component is a Control
Point or an Intermediate signal. The requirements describe the difference in the impact. It is
assumed that the visual signals are still operational and train engineers will abide to the signal
aspects indicated to proceed in Fallback operation mode.
For non-signaled territories, the reaction of the OBC will depend on how the train engineer
responds to the system instructions. The following sequence will occur:
1. When a train approaches a WIU in failure, the OBC will ask the train engineer to confirm
whether the switch is aligned to the desired position.
2. If the train engineer fails to confirm the position of the switch, the OBC will assume that
the train needs to stop before the controlled switch and will calculate the braking curve
accordingly. The OBC will enforce the train engineer to operate the train per the braking
curve.
3. When the train engineer is able to see the position of the switch and confirm, the OBC
will resume the train to normal PTC operation. This assumes that the switch is correctly
aligned.
a. It is the consensus among the Railroad’s Advisory Group for this project that train
engineers typically can see/confirm the position of the switch when the train is 500
feet from the monitored switch.
b. If the train engineer cannot see/confirm the position of the switch, the OBC will
enforce the train to stop. The train engineer must verify/confirm the status of the
switch, inform the system, and proceed with normal PTC operation. This will cause a
delay in train operation.
Table 57 lists the requirements to be satisfied by the Simulator for WIU Failure Events.
Table 57. Requirements for WIU Failure Events
Req. ID Req. Description
MO01 The Simulator shall allow the user to select individually for each type of WIU Failure
event which type of trigger the simulation run should use, either “SCRIPT,” “RANDOM,
or “NONE”:
SCRIPT – The Simulator shall trigger the event per the triggering commands
included in the script.
RANDOM The Simulator shall trigger the event per the probability number
defined for the event (per MO02-PRE).
NONE The Simulator shall not trigger the event during simulation.
129
Req. ID Req. Description
MO02 The Simulator shall allow the user to set a probability value to trigger each type of WIU
failure event based on one or more of the following conditions:
Simulation clock time since the beginning of the simulation (MO02_SCT)
WIU operational hours since the beginning of the simulation (MO02_WOH)
MO03 For the events that will be triggered randomly (per MO01), when a trigger event is reached,
the Simulator shall randomly select a WIU and apply the triggered failure to that WIU. For
failures triggered by WIU operational hours, when a failure is applied to a WIU, the
operational hour counter shall be reset, ready for a new trigger event.
MO04 The Simulator shall allow the user to configure the minimum and maximum time (in hours
and minutes) that a WIU will remain in failure condition until it is restored to a normal
condition (MO04-MTR), individually for each of the WIU types (Control Point,
Intermediate Signal and Monitored Switch).
MO05 The Simulator shall allow the user to configure MO04-MTR per the following:
For the entire model Configuration shall be applied to all WIU locations.
On a subdivision base Configuration values will apply to all WIUs in the
subdivision. This superimposes values that may have already been assigned for the
entire model
Individually for a single WIU component This superimposes values that may
have already been assigned for the entire model and for the subdivision to which
the WIU belongs.
MO06 When a WIU failure event is triggered (per MO02) and there is no explicit scripted time to
restore the component, the Simulator shall restore the failed WIU to normal condition
based on a uniform distribution probability, from a minimum to a maximum duration (per
MO04-MTR).
MO07 The Simulator shall allow the user to configure the minimum and maximum time (in hours
and minutes) that a train will remain stationary when a train stops due to a WIU Failure
event (MO07-TST), separately for Control Point and Monitored Switch WIU types.
MO08 The Simulator shall trigger WIU Failure events only to locations (Control Points,
Intermediate Signals and monitored switches) on tracks that are configured with PTC
Mode ON.
MO09 When a WIU Failure event occurs to an Intermediate (permissive) Signal (Event type 12),
the Simulator shall:
Treat the signal as a Stop and Proceed aspect for the trains approaching that
signaling location.
Reduce train speeds using Engineer Braking with PTC braking rate (per TB01).
130
Req. ID Req. Description
When train reduces to restricted speed (per SC05_RS), the Simulator shall allow
train to continue to next signal, operating at restricted speed according to signaling
conditions ahead.
MO10 When a WIU Failure event occurs at a Control Point (Event type13), the Simulator shall:
Treat the signal as a Stop aspect for the trains approaching that Control Point.
Reduce train speeds using PTC Braking Curve rate (per TB01_PBC) and stop at
the Control Point location.
MO11 The Simulator shall allow the user to set whether trains will stop or not when approaching
a monitored switch in a non-signaled territory whose WIU is in failure (MO11-MSS).
MO12 The Simulator shall allow the user to define at what sight distance in feet (MO12-SDR) a
train will resume normal PTC operations when approaching a monitored switch in a non-
signaled territory whose WIU is in failure.
Default value shall be 500 feet.
MO13 When a WIU Failure event occurs to a monitored switch in non-signaled territory (event
type 14) and a train is approaching this monitored switch, the Simulator shall:
1. Reduce train speed using PTC Braking Curve rate (per TB01_PBC).
2. If it is configured that trains should stop in such condition (per MO11-MSS), the
Simulator shall enforce train to stop at the failed signal target; otherwise the
Simulator shall resume normal PTC train operation when the train is MO12-SDR
feet away from the location of the monitored switch.
MO14 The Simulator shall restore normal PTC operation for a train that stops due to a WIU
Failure at Control Points and Monitored Switches after a randomly generated time delay
using a uniform distribution between a defined minimum and maximum delay (MO07-
TST), obeying the signal aspect displayed.
(This assumes that the signal is displaying a valid aspect, but the WIU is unable to
communicate the aspect. As the train will stop short of the signal, it is assumed that the
engineer can see the signal aspect and proceed according to the rules.)
MO15 The Simulator shall allow the user to view the list of existing WIU Failure Events
Configuration Parameters.
MO16 The Simulator shall allow the user to select an entry from the list of existing WIU Failure
Events Configuration Parameters and perform an action, per the following:
1. ACTIVATE The Simulator shall make the selected entry Active.
2. EDIT The Simulator shall open the selected entry and allow the user to modify
its parameters (MO01 to MO14).
3. NEW The Simulator shall add a new entry in the list and:
a. The Simulator shall allow the user to give a name to the entry.
b. The Simulator shall make its parameters (MO01 to MO14) enabled to be
modified by the user.
131
Req. ID Req. Description
4. DELETE – The Simulator shall delete the active entry, after confirmation of the
action from the user.
5. RENAME – The Simulator shall allow the user to change the name of the selected
entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
MO17 The Simulator shall allow the user save an entry that is being edited as a new entry in the
list.
MO18 The Simulator shall record all the WIU failure events that occurred during a simulation
run, including:
ID of the WIU that failed.
Timestamp when event occurred.
Timestamp when WIU was restored to normal operation.
MO19 The Simulator shall allow the user to retrieve and visualize the impact events that occurred
during a simulation run.
MO20 The Simulator shall allow the user to export the impact events to an external file in .CSV
format.
132
Requirements for Scripted Mode Events
The Simulator must provide features for the user to write commands (script list) that will
deterministically trigger PTC failure events.
Table 58 lists the requirements to be satisfied by the Simulator for Script Mode Events.
Table 58. List of Requirements for Script Mode Commands
Req. ID
Req. Description
SM01
The Simulator shall allow the user to view the existing Script Mode Event Command
Lists.
SM02
The Simulator shall allow the user to select an entry from the list and perform an
action, per the following:
1. ACTIVATE The Simulator shall make the selected entry Active.
2. EDIT The Simulator shall open the selected entry and allow the user to
modify the commands in the list (SM03 to SM07).
3. NEW The Simulator shall add a new entry in the list and:
a. The Simulator shall allow the user to give a name to the entry.
b. The Simulator shall allow the user to modify the commands in the entry
(SM03 to SM07).
4. DELETE – The Simulator shall remove the Active entry, after confirmation
of the action from the user.
5. RENAME – The Simulator shall allow the user to change the name of the
selected entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
SM03
The Simulator shall allow the user to add, remove and modify command lines in the
entry that has been selected by the user to be edited.
SM04
The Simulator shall allow the user to save an entry that is being edited as a new entry
in the list.
SM05
The Simulator shall trigger events as per the script command line during the
simulation, per the triggering configuration of each event type (IO04 and MO01).
SM06
The Simulator shall allow the user to configure scripts to trigger Individual PTC
Operation Impact events in any of the following ways:
On a specific train on a specific day at a specific time in the simulation
On a specific train at a specific point on a specific day in the simulation
On a specific train after a specific number of train miles after start of
simulation
On a specific train after a specific number of train hours after start of
simulation
The user can optionally define how long (in hours and minutes) it will take
for the event to be restored.
133
Req. ID
Req. Description
SM07
The Simulator shall allow the user to configure scripts to trigger WIU Failure events.
Each command line includes:
Specific WIU location, which can be a Control Point, an Intermediate Signal
or a monitored switch.
Specified day at a specified time in the simulation that the event is to occur.
The user can optionally define how long (in hours and minutes) each WIU
will be inoperative until it is restored to normal operation.
Requirements for Configurable Signal Rules
One of the potential improvements with the deployment of PTC can come from eventual changes
in signal rule instructions given to train engineers.
One of the envisioned cases would be a change in signal rules to no longer require a speed
reduction for approach signal aspects in PTC (e.g., Approach + Advance Approach), referred to
as Enhanced Overlay PTC (EO-PTC).
Figure 65 shows the speed profile (dashed black lines) that a train moving towards a signal with
Restricted Speed (RSR) with Advance Approach and Approach signal aspects ahead as
compared to the speed that would be enforced purely based on the train braking curve, as
calculated by the onboard system (dashed green line).
Figure 65. Illustration of Potential Benefit of Modified Signal Rules for Approach Signals
with PTC in Passenger Trains
To provide flexible ways for the user to explore any potential changes in signal rules, the
Simulator shall essentially provide features to allow the user to configure and select sets of signal
rules for a network model flexible enough to create sets of rules that can simulate a scenario like
the one illustrated in Figure 65.
Table 59 lists the requirements to be satisfied by the system under this group.
Table 59. Requirements for Configurable Signal Rules
Req. ID
Req. Description
CR01 The Simulator shall allow the user to create/select/edit multiple set of signal rules for a
network model.
134
Req. ID Req. Description
CR02
The Simulator shall allow the user to associate a set of signal rules to signaling devices
configured in the tracks, which can apply to:
The entire model; or
Designated subdivisions within the network and/or to designated segments
(between control points or model nodes) within one or more subdivisions.
Note that for the same model several sets of signal rules can be in effect, but only one at a
time for a portion of track.
CR03 The Simulator shall allow the user to easily display and toggle among sets of signal rules
associated with the tracks.
Requirements for Fallback Operation
There are different rules for the operation of a train with PTC disengaged/cut-out or not equipped
with PTC (PTC inactive), herein referred to as PTC Fallback Mode, based on the following
combination of items:
Type of system control configured for the tracks (Block Signal Control or Non-Signaled
Territory).
Conditions ahead of the train that is operating in PTC Fallback Mode.
Whether field signals are retained for fallback operation.
The type of PTC control method: PTC-Overlay, QMB and FMB
Under normal operations in a CTC controlled territory, the OBC applies a target of the most
restrictive aspect for that signal (e.g., a Stop and Proceed, Restricting, or a Stop) at each WIU
site (control point and intermediate signal) until it receives a status message from the WIU
containing the signal aspect and, if applicable, the switch status, at which point the stop target is
removed and the appropriate target is placed per the WIU status message.
For a train to operate in PTC Fallback Mode under the current PTC deployment, there are
specific rules (such as train stop, proceed at Restricted Speed until next signal block and resume)
that have to be followed. Those operations are based on 49 CFR Part 236, Subpart I.
In CTC controlled territory where signals are retained, it is assumed that the train engineer can
see and abide to the signal aspects displayed in the field. If the signals are removed from the
field, it is assumed that trains will operate under Track Warrant Control, with voice authorization
issued by the dispatcher. In such condition, speed restrictions apply depending on the train type.
In non-signaled territory, movement authority boundaries will be controlled the same for trains
with and without operating PTC; i.e., TWs will be issued between sidings, junctions and other
named points.
For territories where FMB is deployed and signals are removed, trains operating in PTC Fallback
Mode will be dispatched under TWC. Trains with operating PTC that are following trains in PTC
Fallback Mode in FMB will also have to be dispatched under TWC, as the location of the train
ahead cannot be obtained.
135
Table 60 lists the various combination of scenarios and the fallback operations.
Table 60. List of Operational Scenarios and Their Fallback Operation
Train Control and Field
Configuration PTC Fallback Operation
PTC Overlay TWC no
Block Signals
_Train is dispatched by TW (voice).
_Trains operate at a speed not exceeding 40 mph; 30 mph if carrying PIH
materials [per CFR 236.1029(b)(1)].
PTC Overlay – TWC
with ABS
_Passenger trains operate at a speed not exceeding 59 mph (per CFR
236.1029(b)(2)(i)).
_Freight trains carrying PIH materials operate at a speed not exceeding 40
mph (per CFR 236.1029(b)(2)(ii)).
_Other freight trains operate at a speed not exceeding 49 mph (per CFR
236.1029(b)(2)(iii)).
PTC Overlay – CTC–
Field signals kept in
place.
_Passenger trains operate at a speed not exceeding 59 mph (per CFR
236.1029(b)(2)(i)).
_Freight trains carrying PIH materials operate at a speed not exceeding 40
mph (per CFR 236.1029(b)(2)(ii)).
_Other freight trains operate at a speed not exceeding 49 mph (per CFR
236.1029(b)(2)(iii)).
PTC Overlay – CTC –
All field signals removed.
_Train is dispatched by TW (voice).
_Trains operate at a speed not exceeding 40 mph; 30 mph if carrying PIH
materials [per CFR 236.1029(b)(1)].
PTC Overlay Cab
signaling territory
Trains operate as per cab signal, but not exceeding 79 mph. (per CFR
236.1029(b)(3)).
QMB All field signals
removed.
1) Operation of train that has PTC inactive:
_Train is dispatched by TW (voice).
_Trains operate at a speed not exceeding 40 mph; 30 mph if carrying PIH
materials [per CFR 236.1029(b)(1)].
2) Operation of train that is following train with PTC inactive:
_Following train is not affected (track circuits continue to inform the
position of train ahead in a vital way).
QMB Field signals kept
in place.
_Passenger trains operate at a speed not exceeding 59 mph (per CFR
236.1029(b)(2)(i)).
_Freight trains carrying PIH materials operate at a speed not exceeding 40
mph (per CFR 236.1029(b)(2)(ii)).
_Other freight trains operate at a speed not exceeding 49 mph (per CFR
236.1029(b)(2)(iii)).
136
Train Control and Field
Configuration PTC Fallback Operation
FMB – All field signals
removed.
1) Operation of train that has PTC inactive:
_Train is dispatched by TW (voice).
_Trains operate at a speed not exceeding 40 mph; 30 mph if carrying PIH
materials [per CFR 236.1029(b)(1)].
2) Operation of train that is following train with PTC inactive:
_Train behind operates under TW (voice) as there is no way for the
onboard computer to know the position of train ahead (track circuits are
removed).
Table 61 contains the requirements for fallback operation, including specific operation rules and
speed restrictions that are applied under each case.
Table 61. Requirements for PTC Fallback Operations
Req. ID Req. Description
FO01 The Simulator shall allow the user to set the configuration of field signals under fallback
operation (FO01-CFS) for CTC signaled territories, to be one of the following:
1. All signals are kept operational (Intermediate and Absolute signals). Train
engineers operating a train in Fallback Mode will be able to see the signal aspects
and operate per normal CTC operation.
2. All signals are eliminated. Trains in Fallback Mode will be dispatched per TWC
rules.
FO02 The Simulator shall allow the user to indicate the configuration of field signals for
fallback operation (FO01-CFS) for the following:
An entire subdivision
A group of subdivisions
The entire model
FO03 The Simulator shall allow the user to visualize the configuration of field signals under
fallback operation (as per FO01-CFS), showing the colors of the tracks based on their
expected fallback operation.
FO04 The Simulator shall allow the user to specify the minimum (FO04-MIN) and maximum
(FO04-MAX) duration of time (in minutes and seconds) that a train must wait to restore
operations after a preceding train has cleared the Control Block ahead.
Default value is 3 minutes for FO04-MIN and 5 minutes for FO04-MAX.
FO05 When a train disengages or is cut-out from PTC and starts operating in PTC Fallback
Mode, the Simulator shall operate the train to end of the current Control Block at a speed
not exceeding Medium Speed (SC05-MS).
137
Req. ID Req. Description
FO06 When a train is operating in PTC Fallback Mode in a CTC signaled territory where all
signals are kept operational for fallback operation (per FO01-CFS), the Simulator shall
operate the train in PTC Fallback Mode per the following, after the train reaches the end
of the Control Block where it started operating in PTC Fallback Mode:
1. Passenger trains operate at a speed not exceeding 59 mph.
2. Freight trains carrying PIH materials operate at a speed not exceeding 40 mph.
3. Other freight trains operate at a speed not exceeding 49 mph.
FO07 When a train is operating in PTC Fallback Mode in a cab signal territory, the Simulator
shall operate the train as per cab signal, but not exceeding 79 mph, after the train reaches
the end of the Control Block where it started operating in PTC Fallback Mode.
FO08 The Simulator shall operate a train following another train that is in PTC Fallback Mode
in a territory where all signals are retained for fallback operation (per FO01-CFS) per
normal signal aspect indication.
FO09 When a train is operating in PTC Fallback Mode in a non-signaled territory or in a CTC
signaled territory where signals are not retained for fallback operation (per FO01-CFS),
the Simulator shall operate the train per the following:
1. Train will operate at a speed not exceeding 40 mph; 30 mph if carrying PIH
materials.
2. If the train reaches the end of a Control Block and the Control Block ahead is
occupied by another train, train will stop and wait a random-generated time
between user-defined duration times (FO04-MIN and FO04-MAX) after
preceding train has cleared the Control Block ahead before resuming operation.
FO10 The Simulator shall operate a train with active PTC that is following another train in PTC
Fallback Mode in a non-signaled territory or in a territory where signals are not retained
for fallback operation (per FO01-CFS) per the following:
1. If the train behind reaches the end of the Control Block and the train in PTC
Fallback Mode has not cleared the Control Block ahead, the train behind must
wait a random-generated time between user-defined duration times (FO04-MIN
and FO04-MAX) after preceding train has cleared the block ahead and then
resume operation at track speed.
2. If the train behind reaches the end of the Control Block and the train in PTC
Fallback Mode has already cleared the Control Block ahead, the train behind can
resume operation at track speed.
FO11 The Simulator shall operate trains in PTC Fallback Mode only on tracks that are configured with
PTC Mode ON.
FO12 The Simulator shall allow the user to display the list of existing PTC Fallback Operation
Configurations.
138
Req. ID Req. Description
FO13 The Simulator shall allow the user to select an entry from the list and perform an action, per the
following:
1. ACTIVATE – The Simulator shall make the selected entry Active.
2. EDIT – The Simulator shall open the selected entry and allow the user to modify the
parameters in the list (FO00 to FO08).
3. NEW The Simulator shall add a new entry in the list and:
a. The Simulator shall allow the user to give a name to the entry.
b. The Simulator shall allow the user to modify the parameters in the entry (FO00 to
FO08).
4. DELETE – The Simulator shall delete the Active entry, after confirmation of the action
from the user.
5. RENAME – The Simulator shall allow the user to change the name of the selected entry.
The name of an entry in the list shall be alphanumeric with up to 40 characters.
FO14 The Simulator shall allow the user save an entry that is being edited as a new entry in the list.
Phase 2 Functional Requirements for PTC Improvements
Introduction
This section describes the requirements needed to simulate methods of train control based on the
principle of moving block that could be implemented by railroads in their PTC deployment.
Two concepts of train control methods are envisioned:
1. QMB – A method based on centralized Movement Authorities (MA) sent to trains and
that still relies on fixed blocks in the field (such as track circuits) as primary source of
train location.
2. FMB A method where train location is determined by the trains themselves, i.e., does
not depend on fixed block (such as track circuits) to determine the tracks trains are
occupying.
The two methods are detailed in the next sections.
Requirements for Quasi-Moving Block Operation
For the purpose of this project, the QMB, a limited moving block design that relies on the
existence of track circuit blocks, will be adopted as a potential intermediate design between
conventional fixed block (such as CTC) and FMB systems.
In this method of train control, MAs are created in the dispatching system, verified by a Safety
Server, which also implements the interlocking logic to each train under the control of the
system. The Safety Server uses the position of the trains (front- and rear-end) and the status of
the track circuits and switches to update/send the MAs. The OBC receives the MAs and
compares it with the status of field devices received directly from the WIUs. As a train
approaches the next train ahead, it verifies its distance to the rear-end of the train ahead, and
139
when in close proximity, the train ahead will start reporting its location periodically with a high
frequency, so the OBC of the train behind can calculate an approaching distance that allows the
train behind to approach safely. When trains are operating in the same track circuit, the speed of
the following train is limited to Restricted Speed, as there is no way to determine whether there
is a broken rail between the two trains. Figure 66 illustrates the overall architecture of this
method of train control.
Figure 66. Illustration of the Architecture of the
QMB Method of Train Control
This method of train control can be abstracted to a simplified model for simulation where
components such as WIUs, base stations, safety server and BOS are not included. This method of
operation would be similar to a CTC operation without intermediate signals.
Figure 67 illustrates the sequence of events under a simplified model for this method of
operation in a signaled territory:
1. The Dispatcher creates a route for Train 1 between two control points (CP1 and CP2).
2. The system internally truncates this route into an MA, based on the (dynamic) status of
occupation blocks ahead of the train.
3. As Train 1 moves, a second route is aligned for Train 2 between the same two control
points.
4. The system creates a MA for Train 2 up to the last unoccupied block behind Train 1.
140
Figure 67. QMB Abstraction Sequence of MAs
Based on the QMB principle, the concept of block occupancy that exists in a CTC territory will
remain; however, it is not necessarily associated to the existence of a signal (such as absolute or
intermediate signals) anymore, as the elimination of signals is an option with QMB. This means
that between Control Point locations, the Simulator shall be able to allow the configuration of
multiple Occupancy Blocks (OB) that, for practical purposes would represent actual track
circuits in the field, as illustrated in Figure 68.
Figure 68. Illustration of Occupancy Blocks in QMB
It is envisioned that the Simulator will provide features that will facilitate the analysis of what-if
scenarios – for example, adding OBs between Control Points by splitting existing OBs into
multiple individual OBs, as illustrated in Figure 69. Notice that it is more likely that the railroads
may split existing track circuits into two new OBs, and no more than that for practical reasons,
however, it will be up on the user to configure as many OBs as desired between Control Points.
141
Figure 69. Illustration of Addition of OBs between Control Points in QMB
It is also expected that the Simulator will allow a user to select an existing model created with
CTC configuration or with non-signaled tracks and convert it to be QMB controlled territory.
Table 62 lists the requirements to be satisfied by the system under this group.
Table 62. Requirements for Quasi-Moving Block Operation
Req. ID
Req. Description
QM01
The Simulator shall allow the user to configure OBs for a portion of the track. The user
shall be able to:
1. EDIT: The Simulator shall allow any OBs configured in the portion of track
selected to have its configuration modified.
2. ADD: The Simulator shall allow the user to add a new OB to a portion of the
track selected by the user.
3. DELETE: The Simulator shall allow the user to delete an OB from a portion of
the track selected by the user.
Under options EDIT and ADD, the Simulator shall allow the user to configure an OB, by
inputting the following information:
Initial Milepost (numeric, two decimal digits)
Final Milepost (numeric, two decimal digits)
When adding an OB to a selected portion of track, the Simulator shall set the initial and
final mileposts by default to the same initial and final mileposts of the selected portion of
track.
The Simulator shall not allow the user to EDIT or ADD an OB that would overlap with
another OB.
The Simulator shall allow the Initial of Final Milepost of the OB to be at the same
location as the Initial or Final Milepost of another OB.
The OB shall be contained within the portion of track selected by the user.
An OB can be defined for the following components:
1. An entire continuous section of track between two consecutive switches
2. A portion of continuous section of track between two consecutive switches; i.e.,
between two user-identified mileposts or between a user-identified milepost and
a switch
142
Req. ID
Req. Description
3. A turnout
4. A crossover
5. A diamond
QM02
The Simulator shall allow the user to perform the functions described in QM01 either by
editing a configuration file or by interacting with the graphical interface (point and click).
QM03
The Simulator shall allow the user to automatically create OBs for a selected area (group
of tracks).
Under this option, the Simulator shall create OBs per the following:
1. In a signaled territory area, one OB for each continuous section of tracks
between Signal Blocks within the selected area
2. In a non-signaled territory area, one OB for each continuous section of tracks
between Control Blocks within the selected area
3. One OB for each turnout, crossover and diamond within the selected area
QM04
The Simulator shall allow the user to split an existing OB (or group of OBs) into multiple
OBs with equal size, by dividing OB’s original size per a number informed by the user
(QM04-NOB).
QM05
The Simulator shall provide a graphic display of the OBs that are configured in the
model.
QM06
During a simulation run, the Simulator shall determine the status of occupation of each
OB, per the following:
1. Unoccupied: When no portion of any train is within the OB limits.
2. Occupied: When a portion of at least one train is within the OB limits.
QM07
The Simulator shall allow a train to occupy an Unoccupied OB ahead even if there are
other trains in the same Control Block of the Unoccupied OB but moving in the same
direction.
QM08
The Simulator shall not allow a train to occupy an Unoccupied OB ahead if there is
another train in the same Control Block of the Unoccupied OB authorized to move in
opposite direction.
QM09
The Simulator shall allow the user to trigger the generation of output file containing
details of train movements for a selected train or a group of trains or all trains in the
model.
QM10
The Simulator shall generate an output file containing the information of train movements
at every second containing for the trains selected by the user (per QM07):
1. Identification of the train
2. Timestamp
3. Location of the train (head-end and rear-end)
4. Distance to the next train ahead if there is a train ahead along the current train route.
5. Identification of the OBs occupied by the train.
143
Requirements for Full-Moving Block Operation
The general principle of the moving block concept essentially allows trains moving in the same
direction to ideally be separated by just the footprint of the train ahead (location of the train head
and rear-end) and the braking distance of the train behind, as illustrated in Figure 70.
Figure 70. Illustration of Fixed Block and Moving Block Concepts
Figure 71 illustrates additional components that may increase the separation distance between the
two trains, depending on how the system is implemented:
Error Margin: This is related to potential errors in the onboard location determination
system.
Latency Effect: This would be specified in time and is related to the latency that a
message containing the information of location of the train ahead (front- and rear-end) is
conveyed to the train behind.
Figure 71. Illustration of All Elements that Contribute to Train Separation Distance
Between Trains in Following Moves in a Moving Block Operation
Two components contribute to the Latency Effect in following train moves:
1. Intrinsic Latency: This is the delay caused by the communication path the message will
traverse until destination (from the time it is originated in one train until it is received by
another train)
2. Frequency Rate: This informs how frequently trains will notify their location to the
system. A train behind in a following movement will always assume that the rear-end of
the train ahead is at the location informed by the last message received. As this
144
information can be as old as the frequency rate, additional separation will be added
between trains.
Based on the above, the Latency Effect will be as small as the Intrinsic Latency at the time the
train ahead reports its position (best-case scenario) and as large as the sum of the two
components (Intrinsic Latency + Frequency Rate) at a time just before the train ahead reports its
position (worst case scenario). Assuming that the latency is 4 seconds and the Frequency Rate is
16 seconds, and the train ahead is moving at 36 mph; a train behind would be assuming in a
worst-case scenario (just before a new train position report for the train ahead is received) that
the train ahead is 20 seconds behind of where it actually is, which would be 0.2 mile behind its
current location. If the train ahead is operating at 18 mph, the worst-case scenario is reduced to
0.1 mile.
It must be assumed that the Latency Effect will be the sum of the two components ( i.e., the
worst-case scenario) because for practical purposes in actual train operation, it is not expected
that the train engineer will be adjusting speed to conform to the best- and worst-case scenarios,
but is keeping the train separation based on the worst case scenario.
Like the QMB operation, a Safety Server will be issuing periodic MAs to each train under PTC
control. Figure 72 illustrates the overall architecture of this method of train control.
Figure 72. Illustration of the Architecture of FMB Method of Train Control
For the purposes of simulation, the model for the method of train control can also be abstracted
as per the following:
The location of each train (front- and rear-end) is calculated at every instant (as trains
move).
The location of each train is reported periodically at a rate determined by the user (in
matter of seconds). This is the last reported position of a train.
145
Based on a train’s granted route and on the last reported position of the train ahead, the
system calculates the train’s MA.
- If there are no other trains on the tracks between the current track location and the end
of the train’s authorized route, the train can proceed per maximum authorized or
achievable speed based on civil speed limits and speed restrictions.
- If there are other trains moving in the same direction, the limit of the MA is based on
the location of the rear-end of the next train ahead. The calculation of the MA also
includes a safety margin and latency effect.
The system calculates the train’s braking curve based on train speed, consist
characteristics, and track grade.
Train movements are enforced per their MAs and braking curve.
This method of train control can also be abstracted to a simplified model for simulation, which
would be similar to a CTC operation without intermediate signals. The main difference when
compared with the QMB method is that track circuits are eliminated; thus, the MA for a certain
train is limited to the rear-end of the next train ahead moving in the same direction including the
margins to the rear-end explained earlier in this section. Figure 73 illustrates the sequence of
events under a simplified model for the FMB method of operation.
Figure 73. FMB Simplified Model Sequence in a Signaled Territory
A train following another train ahead cannot be authorized to move beyond the rear- end of the
train ahead. As illustrated in Figure 73, each train reports its location to a Safety Server, who in
turn issues MAs to trains based on the location of all trains.
The frequency rate that a train will report its location depends on its separation from a train
following behind. If the separation from its rear-end (including margins) to the following train’s
head end is less than the following train’s braking distance plus the distance the following train
146
travels in a pre-determined duration of time (e.g., 70 seconds), the train behind is said to be in a
Close Following Move (CFM) to the train ahead. Under this condition, the train ahead will report
its location with a higher frequency rate than when there is no train behind in CFM. Figure 74
illustrates a train following a preceding train in a CFM condition. The Simulator shall indicate
when such condition happens to a train as this will be valuable information to be used in further
analysis of train message traffic.
Figure 74. Illustration of Close Following Move Condition
Table 63 lists the requirements to be satisfied by the system under this group.
Table 63. Requirements for FMB Operation
Req. ID
Req. Description
FM01
The Simulator shall allow the user to specify the Error Margin (in feet) to be added
to the rear-end of the train to account for errors in the train determination location
system (FM01-SMR). Default value is 100.
FM02
The Simulator shall allow the user to specify the Intrinsic Latency (in seconds) that
defines how long it will take for a train location message from a train to be
delivered to other trains (FM02-ITL). Default value is 2.
FM03
The Simulator shall allow the user to specify the Update Rate (FM03-UPR) that
trains report their location in seconds. Default value is 16 seconds.
FM04
The Simulator shall allow the user to configure Control Point locations for FMB for
a portion of track in the same fashion as done for a CTC territory or for a dark
territory area.
FM05
The Simulator shall allow the user to adopt the location of Absolute Signals
configured for a CTC territory and/or the location of Signaled Switches configured
for dark territory as the Control Points to be used for FMB, per the following
options:
For an entire subdivision
For a group of subdivisions
For the entire model
FM06
The Simulator shall allow the user to configure the duration (in seconds) used to
calculate the separation that determines a CFM condition of a following train
(FM06-CFS). Default value is 70 seconds.
147
Req. ID Req. Description
FM07
During a simulation run, the Simulator shall calculate the location of each train at
every instant per the following:
1. Head-End: Current location of the front of the train as calculated per the
Simulator.
2. Rear-end: Current location of the rear-end of the train, based on the head-end,
train length, and the following margins:
a. Error Margin (FM01-SMR)
b. Distance train would travel at current speed during Intrinsic Latency
(FM02-ITL) time.
c. Distance train would travel at current speed during train update rate
(FM03-UPR) time.
FM08
During a simulation run the Simulator shall determine if a train moving in a certain
direction is in a CFM to a train ahead moving in the same direction on the same
track, using the following information:
Head-end location of the train behind
Rear-end location of train ahead
CFM separation duration (FM06-CFS)
The Simulator shall compare the time that it will take for the head-end of the train
behind to reach the location of the rear-end of the train ahead if train behind keeps
current train speed. If the calculated time is below FM06-CFS, train behind is in
CFM.
FM09
During a simulation run, the Simulator shall calculate the train braking curve (as per
TB01) considering the following:
The MAS of the tracks along the train authority
The TSRs imposed to the tracks along the train authority.
If there is another train ahead moving in the same direction along the
current train route, the Simulator shall calculate the braking curve so that
the train stops at the rear-end of the train ahead.
- Otherwise (i.e., no train within the current train route), the braking
curve shall be calculated so that the train stops at the end of the current
train authority, per TB01_PBC.
FM10
The Simulator shall allow the user to trigger the generation of output file containing
details of train movements for a selected train or a group of trains or all trains in the
model.
FM11
The Simulator shall generate an output file containing the information of train
movements per FM10, including:
Identification of the train
Timestamp
Location of the train (head- and rear- end)
148
Req. ID Req. Description
Distance to the next train ahead if there is a train ahead along the current
train authority, based on the rear-end location of train ahead.
Identification of the next train ahead if there is a train ahead along the
current train authority.
CFM status of the train
.
149
Abbreviations and Acronyms
Abbreviation
Definition
ABS
Automatic Block Signaling
AG
Advisory Group
ATC
Automatic Train Control
BER
Bit Error Rate
BOS
Back-Office System
BSS
Berkeley Simulation Software
CAD
Computer-Aided Dispatching
CFM
Close Following Move
CIXL
Centralized Interlocking
ConOps
Concepts of Operation
CP
Control Point
CTC
Centralized Traffic Control
CTC
Centralized Traffic Control
DP
Distributed Power
DUA
Dense Urban Area
EO-PTC
Enhanced Overlay Positive Train Control
FMB
Full-moving Block
FOAD
Fiber optic acoustic detection
GDOP
Geometric Dilution of Precision
GNSS
Global Navigation Satellite System
GPS
Global Positioning System
HRCTC
Higher Reliability and Capacity Train Control
IS
Information System
ITC
Interoperable Train Control
LOS
Line-Of-Sight
MAS
Maximum Authorized Speed
MBS
Manual Block System
MTBDE
Mean Time Between Downing Events
MTTR
Mean Time To Repair
NGTC
Next Generation Track Circuit
150
Abbreviation
Definition
NRFICI
National Rail Freight Infrastructure Capacity and Investment
OB
Occupation Block
OBC
Onboard Computer
OBRD
Onboard Broken Rail Detection or Onboard Broken Rail Detector
PTC
Positive Train Control
PTCEA
PTC Enforceable Authority
PTCIE
PTC Impact Event
PTL-EOT
Positive Train Location – End Of Train
QMB
Quasi-moving Block
RAM
Reliability, Availability and Maintainability
RF
Radio Frequency
ROI
Return Of Investment
RSR
Restricted Speed Restriction
RTC
Rail Traffic Controller
RVCCM
Requirements Verification Conditions and Criteria Matrix
SG
Signal Group
SysRs
System Requirement Specification
TOES
Train Operation and Energy Simulation
TSR
Temporary Speed Restriction
TUL
Track Utilization Level
TWC
Track Warrant Control
WIU
Wayside Interface Unit
WSM
Wayside Status Message
WSRS
Wayside Status Relay Service
Conference Paper
Full-text available
Positive Train Control (PTC) has been successfully deployed in the USA at the end of 2020 where mandated by the Rail Safety Improvement Act of 2008 (RSIA2008). As currently implemented, PTC is an overlay sys-tem that satisfies the RSIA requirements, providing essentially safety improvements. Taking advantage of the communication backbone, system components installed in the office, onboard and wayside that were de-ployed with PTC, railroads and vendors are taking steps to implement improvements that should allow oper-ations to achieve additional benefits, such as capacity increase and further safety.
Technical Report
Full-text available
In 2014, the Federal Railroad Administration (FRA) funded Transportation Technology Center, Inc.’s (TTCI) development of the 220 MHz radio frequency (RF) network design for the Interoperable Train Control (ITC) compliant Positive Train Control (PTC) systems along the Northeast Corridor (NEC), in the area between Boston and Washington, DC. This report describes in detail the work conducted by TTCI to develop the RF network design for the NEC. It also includes a description of the research and development work, as well as the methodology, TTCI applied to support the project.
Technical Report
Full-text available
In 2013, the Federal Railroad Administration (FRA) funded Transportation Technology Center, Inc. (TTCI) to develop full designs of the 220 MHz Positive Train Control (PTC) radio frequency (RF) network for the dense urban areas (DUA) of Chicago, Kansas City (KC) and Dallas-Fort Worth (DFW). FRA funded these DUAs due to the high level of complexity of these areas, where multiple railroads converge and the resolution of the message loading traffic and resource sharing would require a comprehensive and detailed analysis, as well as the development of specific methods and tools to resolve the challenges encountered. The 220 MHz PTC radio system used for the design of the selected DUAs has unique characteristics that require a tailored RF network design. This singular aspect, combined with the complexity of the selected DUAs, required TTCI to work closely together with the railroads and other engineering companies to design and apply engineering solutions to produce designs that were feasible for deployment. It took several releases of the design, development of software tools, field test validation, development of special engineering analysis and methods before the RF design plans became ready for field deployment.
Research on Methods for Enhancing Positive Train Control Freight Braking Algorithms
  • S Pate
Pate, S. (2018). Research on Methods for Enhancing Positive Train Control Freight Braking Algorithms. Washington, DC: U.S. Department of Transportation, Federal Railroad Administration.
Development of an Operationally Efficient PTC Braking Enforcement Algorithm for Freight Trains
  • J Brosseau
Brosseau, J. (2013). Development of an Operationally Efficient PTC Braking Enforcement Algorithm for Freight Trains. Washington, DC: U.S. Department of Transportation, Federal Railroad Administration.