Abstract. The original oil in place suitable for chemical flooding in Shengli oilfield is 1.6 billion ton.
Though the resource is abundant, the oil recovery is poor due to rigorous reservoir conditions,
including high temperature, high salinity, high divalent-cation content, high oil viscosity and severe
heterogeneity. In an effort to counteract the rigorous reservoir conditions, polymer flooding
technologies for class I and II reservoirs has been improved, and surfactant/polymer flooding has been
implemented industrially. Heterogeneous combination flooding technology has made great
breakthroughs. A unique series of chemical flooding technologies has been developed and played a
significant role in maintaining oil production in mature fields.
1. Introduction
The original oil in place (OOIP) suitable for chemical flooding in Shengli oilfield is 16.05×108 ton [1].
Though the available chemical flooding resources are tremendous, the reservoir conditions are
difficult in terms of the high temperature, high salinity, high divalent-cation content, high oil viscosity
and severe heterogeneity. Stricter requirements have been established for reservoir recognition and
residual oil distribution studies, heat-resistant and salt-tolerant capabilities and the viscofication of
displacement systems. To counteract the rigorous reservoir conditions, a unique series of chemical
flooding technologies has been developed.
2. Chemical Flooding in Shengli Oilfield
By the end of 2016, 59 chemical flooding projects with an overall OOIP of 4.46×108 ton had been
implemented in Shengli oilfield. Chemical floods have contributed to an annual oil increment of
1.5×106 ton for twelve continuous years. The cumulative oil increment due to chemical floods has
reached 29.01×106 ton. It is estimated that the total incremental recovery will be 8.1%, and the
recoverable reserve will increase by 36.15×106 ton.
3. Chemical Flooding Technologies
With the continuing large-scale industrial application of chemical flooding, the remaining reservoir
conditions are becoming increasingly harsh. This situation has spurred the development of new
displacement systems with higher sweep efficiency and displacement efficiency. To help counteract
the challenges of class III high-temperature and high-salinity reservoirs, class IV high-permeability
reservoirs, and reservoirs after polymer flooding, novel chemical flooding systems, such as
surfactant/polymer flooding systems and heterogeneous combination flooding systems have been
developed.
Polymer flooding. It is well known that the mobility ratio plays an important role in oil recovery [2].
However, the viscosity of the polymer solution changes constantly during percolation, making the
mobility ratio of polymer flooding difficult to determine [3,4]. To solve this issue, the correlation
between the viscosity ratio of the polymer solution to oil and the enhanced recovery was studied. A
2nd International Conference on Advances in Energy, Environment and Chemical Science (AEECS 2018)
Copyright © 2018, the Authors. Published by Atlantis Press.
This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Advances in Engineering Research, volume 155
102
reasonable viscosity ratio range was determined to be 0.15~0.5, with a comparatively large recovery
increment magnitude. Numerical and physical simulations yielded consistent results (see Fig.1).
Fig. 1 Correlation between viscosity ratio of polymer solution to oil and enhanced recovery
Partially hydrolyzed polyacrylamide (HPAM) with a molecular weight of 15×106 was chosen for
class I reservoirs. Its viscosity satisfied the requirements of 20 mPa•s at 1500 mg/L. The formulation
of polymer flooding for class I reservoirs was 0.05 PV×2000 mg/L+0.20 PV×1500 mg/L. HPAM was
prepared using fresh water and injected using produced water. A pilot polymer flooding application
was conducted at Gudao’s ZYQ Ng3 (a class I reservoir) in 1992. The reservoir parameters were as
follows: oil viscosity at the surface of 46.3 mPa•s, formation temperature of 70 °C, salinity of 5293
mg/L, divalent cation content of 102 mg/L, and OOIP of 1.65×106 ton. An injection of 1389.5 ton of
polymer yielded a maximum water cut reduction of 19.3% (from 90.3% to 71.0%) and an increase in
oil production from 122 ton/day to 351 ton/day (see Fig.2). The cumulative incremental oil
production was 20×104 ton, while the enhanced recovery was 12.0% over waterflooding, and the
incremental oil per ton of polymer was 143 ton.
Fig. 2 Production curve of polymer pilot at Gudao’s ZYQ Ng3
HPAM with a molecular weight of 20×106 was suitable for class II reservoirs. Its viscosity reached
20 mPa•s at 1500 mg/L. In contrast, the viscosity of 1500 mg/L HPAM with a molecular weight of
15×106 was only 9.3 mPa•s. A pilot polymer flooding application was conducted at Shengtuo’s SYQ
(a class II reservoir) in 1998. The reservoir parameters were as follows: oil viscosity at the surface of
25 mPa•s, formation temperature of 80 °C, salinity of 21000 mg/L, and divalent cation content of 311
mg/L. From April 1998 to September 2001, 7005.7 ton of polymer was injected. After applying
polymer flooding, the maximum water cut reduction reached 15.4% (from 95.9% to 80.5%), and oil
production increased from 177 to 558 ton/day (see Fig. 3). The cumulative oil increment was
Advances in Engineering Research, volume 155
103
71.5×104 ton. The incremental recovery was 6.6% OOIP over waterflooding, and the incremental oil
per ton of polymer was 102 ton. It is estimated that the final enhanced recovery and oil increment per
ton of polymer will be 7.0% and 109 ton, respectively.
Fig. 3 Production curve of polymer pilot at Shengtuo’s SYQ
So far, 30 polymer flooding projects have been implemented in class I and II reservoirs, with an
OOIP of 3.2×108 ton. The cumulative oil increment was 18.88×106 ton, equivalent to 7.1% OOIP of
recovery.
Surfactant/polymer flooding. Research on combination flooding, mainly
alkaline/polymer/surfactant (ASP) and surfactant/polymer (SP) flooding, began in the late 1980s. It
has been suggested that ASP and SP techniques could improve oil recovery by 12~20% OOIP.
Considering the high acid value of Shengli crude oil, ASP flooding was considered first. The first
pilot of ASP flooding in China was conducted at Gudong in 1992. The water cut of the central wells
already had exceeded 98% for three years before the pilot. After applying the ASP system, the water
cut of the central wells declined from 99.3% to 85.2%, and the cumulative incremental oil production
increased to 1740 ton. The enhanced oil recovery was 16.8%, and the oil increment per ton of polymer
was 110 ton. By the end of the ASP pilot, 76.2% OOIP was obtained in the central wells [5-6]. After
the great success of the pilot test, ASP flooding was extended to western Gudao in 1997. From May
1997 to April 2002, the cumulative incremental oil production and recovery were 29.6×104 ton and
15.5%, respectively.
Despite the high recovery factor of ASP flooding, the scale deposit in the injection system was a
serious issue. Additionally, the produced fluids contained a large number of emulsions, which were
difficult to break. Therefore, the industrial application of ASP flooding was restricted. To avoid the
problems caused by ASP flooding, an alkali-free surfactant/polymer system was developed. The first
SP pilot was conducted at Gudong’s QQX in 2003. The parameters were as follows: oil-bearing area
of 0.94 km2, OOIP of 2.77×106 ton, 10 injectors and 16 producers, with a distance between each
injector and producer of 300 m, oil viscosity at the surface of 40.1 mPa•s, formation temperature of
68 °C, total salinity of the formation water of 7883 mg/L, and divalent cation content of 244 mg/L.
The total water cut was 98.3% before the SP pilot. After the application of SP flooding, the water cut
in the central wells dropped to 60.4%, and oil production increased from 10.4 to 127.5 ton/day (see
Fig. 4). The cumulative oil increment in the central wells was 12.2×104 ton, and the enhanced
recovery was 18.0% OOIP. The cumulative oil increment over the entire pilot area was 24.7×104 ton,
and the enhanced recovery was 8.9%.
Advances in Engineering Research, volume 155
104
Fig. 4 Production curve of SP pilot at Gudong’s QQX
The large-scale industrial application of SP flooding began in 2007. By the end of 2016, 21 SP
projects had been conducted in the Gudao, Gudong, Shengtuo and Chengdong fields. The producing
reserves were 1.5×108 ton, with a cumulative incremental oil production of 9.57×106 ton. The oil
increment of SP flooding in 2012 accounted for 62% of the chemical flooding oil increment in
Shengli oilfield. The recoverable reserves and oil recovery had increased by 1052×104 ton and 10.2%,
respectively. SP flooding has become an important contribution to oil production in Shengli oilfield.
Heterogeneous combination flooding. The OOIP of reservoirs after polymer flooding in Shengli
oilfield was 2.9×108 ton. The average oil recovery was only 46.0%, implying that 54.0% of reserves
remained underground. Core tests and dynamic monitoring data have revealed that the heterogeneity
becomes more severe after polymer flooding. A novel heterogeneous combination flooding (HCF)
system was developed that consists of branched preformed particle gel (B-PPG), polymer and
surfactant. B-PPG is a kind of injectable soft solid displacement agent, in which partly crosslinked
3D-network and partly star-branched polymer chains are co-existed. Partly crosslinked 3D network
forms swelling deformable viscoelastic particle. Branched polymer chains are soluble to increase
viscosity. Therefore, B-PPG is suitable for conformation control and oil displacement. Physical
simulation experiments showed that the HCF system improved oil recovery by 13.6% over polymer
flooding.
The HCF pilot was conducted at Gudao’s ZYQ Ng3 in October 2010 with 15 injectors and 10
producers. It had a line drive well network with well spacing of 135×150m. The water cut and oil
recovery before the pilot were 98.2% and 52.3%, respectively. After applying the HCF system, the
water cut in the central wells dropped to 81.3%, and oil production increased from 3.3 to 79.0 ton/day
(see Fig. 5). The enhanced oil recovery was 8.5%. The final oil recovery reached 63.6% OOIP.
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35
0
20
40
60
80 daily oil production
water cut
Injection volume PV
daily oil production t/d
80
82
84
86
88
90
92
94
96
98
100
79.0
3.3
81.3
water cut %
98.2
Fig. 5 Production curve of HCF pilot at Gudao’s ZYQ Ng3
Advances in Engineering Research, volume 155
105
4. Summary
In reservoirs in which oil recovery is difficult, such as those with high temperature and high salinity,
class III, IV and V reservoirs, and reservoirs after polymer flooding, it is recommended to integrate
chemical flooding material development based on theoretical and experimental research. Polymer
flooding and SP flooding have achieved great success but require further improvements in order to be
more applicable under severe reservoir conditions. HCF flooding has potential as new enhanced oil
recovery opportunities for high-temperature, high-salinity and heterogeneous reservoir applications.
Acknowledgements
This work was financially supported by the National Science and Technology Major Project
(2016ZX05011-003).
References
[1] F.Q.Yuan, H.C. Li, and Z.Q. Zhang: Oil & gas Recovery Technology, Vol. 2(2000), p. 12.
[2] H.Q. Sun, Z.Q. Li, and X.L. Cao: SP technology (China Science and Technology Press, Beijing
2007).
[3] Z.Q. Li: Petroleum Exploration and Development, Vol. 31(2004), p. 119.
[4] Y. Li, and X.L. Cao: SPE 68697 (2000).
[5] H.Q. Sun: Petroleum Exploration and Development, Vol. 33(2006), p. 262.
[6] C.L. Wang, and X.L. Cao: SPE 38321(1997).
Advances in Engineering Research, volume 155
106
ResearchGate has not been able to resolve any citations for this publication.
  • Y Li
  • X L Cao
Y. Li, and X.L. Cao: SPE 68697 (2000).