The climatic probability signaling lines can be used for the sizing rainfall water drain structures when they are envelope lines. When, on the contrary, the risk criterion is introduced, and is computed in a predetermined return period, the use of climatic possiblity signaling lines as a means of dimensioning is no longer acceptable since the relating logic - although proposed again in a correct
... [Show full abstract] way - would be needlessly too complicated, whereas it is obvious the risk should be directly related to the structures. The problem is analyzed with systematic and actual reference to a sewer system. The formalized calculation process is mainly carried out with respect to the probabilistic formulation.