ArticlePDF Available

A multi-objective location-allocation optimization for sustainable management of municipal solid waste

Authors:

Abstract and Figures

The location problem of treatment and service facilities in municipal solid waste (MSW) management system is of significant importance due to the socioeconomic and environmental concerns. The consideration of waste treatment costs, environmental impact, greenhouse gas (GHG) emissions, social fairness as well as other relevant aspects should be simultaneously taken into account when a MSW management system is planned. Development of sophisticated decision support tools for planning MSW management system in an economic-efficient and environmental friendly manner is therefore important. In this paper, a general multi-objective location-allocation model for optimally managing the interactions among those conflicting factors in MSW management system is proposed. The model is comprised of a three-stage conceptual framework and a mixed integer mathematical programming. The inclusion of environmental impact and GHG emission objectives push the output of the model tightening toward more environmentally friendly and sustainable solutions in MSW management. The application of this model is demonstrated through an illustrative example, and the computational efficiency of the programming is also tested through a set of incremental parameters. Latter in this paper, a comparison with previous case studies of MSW system design is presented in order to show the applicability and adaptability of the generic model in practical decision-making process, and the perspectives of future study are also discussed.
Content may be subject to copyright.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Title: A multi-objective location-allocation optimization for sustainable
management of municipal solid waste
Author: Hao Yua, Wei Deng Solvanga
a Department of Industrial Engineering, Faculty of Engineering Science
and Technology, UiT The Arctic University of Norway, Postboks 385,
Lodve Langes gate 2, NO-8505 Narvik, Norway
Email: hao.yu@uit.no; wei.d.solvang@uit.no
Corresponding author: Hao Yu
Email: hao.yu@uit.no
Tel.: (+47)-76966328
Address: Department of Industrial Engineering, Faculty of Engineering
Science and Technology, UiT The Arctic University of Norway, Postboks
385, Lodve Langes gate 2, NO-8505 Narvik, Norway
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
A multi-objective location-allocation optimization for sustainable
management of municipal solid waste
Abstract: The location problem of treatment and service facilities in municipal solid waste (MSW)
management system is of significant importance due to the socio-economic and environmental concerns.
The consideration of waste treatment costs, environmental impact, greenhouse gas (GHG) emissions, social
fairness as well as other relevant aspects should be simultaneously taken into account when a MSW
management system is planned. Development of sophisticated decision support tools for planning MSW
management system in an economic-efficient and environmental friendly manner is therefore important. In
this paper, a general multi-objective location-allocation model for optimally managing the interactions
among those conflicting factors in MSW management system is proposed. The model is comprised of a
three-stage conceptual framework and a mixed integer mathematical programming. The inclusion of
environmental impact and GHG emission objectives push the output of the model tightening towards more
environmentally friendly and sustainable solutions in MSW management. The application of this model is
demonstrated through an illustrative example and the computational efficiency of the programming is also
tested through a set of incremental parameters. Latter in this paper, a comparison with previous case studies
of MSW system design is presented in order to show the applicability and adaptability of the generic model
in practical decision-making process, and the perspectives of future study are also discussed.
Key words: Waste management, environmental impact, sustainable development, municipal solid waste,
MSW, multi-objective programming, mixed integer programming, location-allocation problem
1. Introduction
The management of municipal solid waste (MSW) has become increasingly important over the past few
decades due to significant growth of public’s awareness and concern of environmental issues. The planning
of MSW management system is therefore of essential importance and needs usually taking careful
consideration of many critical factors, i.e., waste treatment costs, potential environmental impact,
greenhouse gas (GHG) emissions, social fairness, opposition of local residents it influences, as well as the
interests of different stakeholders. In most cases, those factors are in conflict with each other and the optimal
scenario for one factor may be irrational for others. For instance, if an incineration plant is located near to
populated areas, the system operating costs can be decreased due to the reduction in waste transportation
costs, however, the environmental impact it imposes to the health and lifestyle of nearby residents will be
greatly increased, which may lead to serious opposition and dissatisfaction of local people. On the other
hand, if the incinerator is located far away from populated areas, the local residents’ satisfaction could be
improved, while the substantial increasing on waste transportation costs may become a big burden for the
service providers of MSW management. Therefore, it is extremely important to take all the influencing
factors into consideration in order to find out an overall optimal solution which balances the economic-
efficiency and environmental influences in MSW management system.
In this paper, a multi-objective location-allocation model is formulated for managing the trade-off among
system operating costs, potential environmental impact, GHG emissions as well as social fairness in an
optimal manner, and the weighted sum method is employed to generate the optimal solution of the multi-
objective optimization problem. The reminder of this paper is structured as follows. A comprehensive
literature review of previous multi-objective models for waste management is given in section 2, and the
problems of existing models are also discussed and presented in this section. In section 3, the general
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
conceptual framework of MSW management system is established, and the mathematical model is
accordingly formulated in order to solve those problems, and the weighted sum method for aggregating the
three objective functions is also presented and discussed in this section. In section 4, a small-scale case study
is proposed and resolved for explicitly demonstrating the application of this multi-objective location-
allocation model. Section 5 presents numerical experiments of the proposed model with incremental
parameters so as to test its computational performance in resolving complex problems. Section 6 provides
the comparison and discussion of the proposed mathematical model with previous case studies in MSW
system design. The last section concludes this paper with a summary and outlook.
2. Literature review
The application of multi-objective programming in location and allocation optimization related to waste
management have been introduced and extensively studied for over three decades. This section provides the
literature review of the application of multi-objective mathematical programming in waste management,
and a comprehensive review of other multi-criteria decision analysis tools in waste management is given by
Achillas et al. (2013). An early mathematical model proposed by Koo et al. (1991) handling especially the
location problem of hazardous waste disposal facilities from a long-term perspective. The model involves
linear objective functions as well as a set of non-linear membership functions. The linear objective functions
are defined to find out the break-even point at which total costs and system risks are minimized while equity,
public satisfaction, ease of construction and maintenance are maximized. Fuzzy set theory is applied for
quantification of non-linear membership functions and determining the time-varying changes of above
mentioned five parameters. Caruso et al. (1993) introduced a multi-objective model for waste management
based on three objectives: minimization of overall waste treatment costs, waste of resources and
environmental risks, respectively. The environmental risks are defined as a sum of fixed and variable risks
related to waste treatment, while the waste of resources is determined by the quantity of solid waste being
landfilled. Li and Wang (2011) developed a bi-objective integer-programming (IP) model for planning of
waste collection and transportation. The objective function includes a cost-minimization function
accompanying with a disutility function that represent the potential risks. A similar attempt can also be
found in Sun and Gao (2002).
Other research works also focus on the equity and technical factors, i.e., the optimization model of toxic
waste transportation by Wyman and Kuby (1995). The significant difference between this model and the
previous ones is that its inequity factor is formulated as linearly related to waste quantity and transport
distance. Potential risks related to toxic waste transportation are also fairly allocated to all communities
along the transportation routes. The highlight of this paper is that the costs of different types of technologies
are involved, and in their case study in Maicopa County, Arizona, they perform a comparative study of
traditional incineration and photolytic detoxification for demonstrating the difference and characteristics of
treatment technologies. A similar model is given by Nema and Gupta (1999), unlike that of Wyman and
Kuby´s, the inequity factor is not referred. Instead, the researchers took waste treatment techniques for
hazardous waste into calculation.
Rakas et al. (2004) further introduced social risks into multi-objective waste management model. They
proposed a single-stage multi-objective model for determining the location of undesirable facilities. This
model only includes waste generation points and candidate points for treatment facilities. The objective of
their model is to achieve the minimization of overall system costs and social risks. The social risks are
measured by quantification of the opposition from local communities. They also extend their model by using
fuzzy set optimization techniques so as to increase the flexibility in dealing with the uncertainty from
parameters. A composite model which combines both fuzzy set theory and mixed integer programming
(MIP) is given by Galante et al. (2010). This composite model is designed for locating transfer stations in
MSW management system by achieving the minimization of overall system costs and environmental impact.
There are two parts in this model, the first part is preliminary selection for the potential locations of transfer
stations, which is based upon fuzzy equivalence relations, and the second part is the final selection process
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
where the MIP model is employed. In this model, the environmental impact is simply related to total fuel
consumption. As the target of the research is only to locate transfer stations, and as negative environmental
influence from the transfer station is insignificant comparing to GHG emissions form the transportation of
solid waste among different facilities, the simplification is both reasonable and cost-effective.
Location-routing is another topic that has high relevance in the field of waste management. Alumur and
Kara (2007) developed a location-routing model for the transportation of hazardous waste. Their location-
routing model comprises three levels of facilities: hazardous waste generation node, treatment center and
disposal center. The model is designed for minimizing the system operating costs and waste transportation
risk. The transportation risk is proportional to the population exposure along the transport routes of
hazardous waste.
To consider time-varying changes related to waste management, Hu et al. (2002) proposed a time-discrete
single objective model to minimize the total costs of a reverse logistics system for hazardous waste. In this
model, the reverse logistics system for multi-sourced hazardous waste is comprised of waste collection,
treatment, distribution, disposal and/or reuse. By using this model, the overall system costs can be reduced
greatly in terms of facility operating costs, waste storage and distribution costs, especially from long-term
perspective. Sheu (2007) further developed this model into a multi-objective dynamic model that
emphasizes the minimization of both system operating costs and risks. The risks of hazardous wastes system
are constituted by uncollected hazmat exposure risks, transportation risks, treatment risks and storage risks.
Sheu (2007)'s model also takes into account the reusable processed wastes storage costs and the useless
processed wastes storage costs. Su et al. (2008) developed a multi-objective model for dealing with the
dynamic, interactive and inexact characteristics of the MSW management system in Fo Shan, China. The
interval representation is employed in this inexact model to express the uncertain parameters, and the
negative environmental influence is monetized for denoting the potential risks and simplifying further
calculation. Furthermore, the discount factor for calculating net present value (NPV) is also introduced to
adopt the characteristics in a long-term context. Yu et al. (2015) developed a multi-objective linear
programming for waste allocation problem of MSW management over several continuous periods, and the
objective of this model is to balance the overall system costs, environmental impact and waste of resources.
Table 1 Literature survey of multi-objective programming for waste management
Article
Mathematical programming
Objective functions
LP
NLP
MIP
DP
FP
CT
RK
EQ
WR
FC
PO
EC
OT
Alcada-Almeida et al.
(2009)
Alumur and Kara
(2007)
Badran and El-
Haggar (2006)
Coruso et al. (1993)
Eiselt (2007)
Eiselt and Marianov
(2014)
Erkut et al. (2008)
Galante et al. (2010)
He et al. (2006)
Hu et al. (2002)
Koo et al. (1991)
Li and Wang (2011)
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Nema and Gupta
(1999)
Noche and Chinakupt
(2010)
Or and Akgiil (1994)
Rakas et al. (2004)
Sheu (2007)
Su et al. (2008)
Sun and Gao (2002)
Wang et al. (1997)
Wyman and Kuby
(1995)
Yu et al. (2015)
Zhao and Ma (2010)
Zhang et al. (2011)
a LP=Linear programming, NLP=Non-linear programming, MIP=Mixed integer programming, DP=Dynamic programming,
FP=Fuzzy programming, IP=Interval programming, CT=Costs, RK=Risks, EQ=Equity, WR=Waste resource, FC=Fuel
consumption, PO=Public opposition, ECM=Ease of construction and maintenance
Through reviewing a number of previous studies and research works, multi-objective models for waste
management are formulated based upon linear programming (LP), non-linear programming (NLP), mixed
integer programming (MIP), dynamic programming (DP), fuzzy programming (FP) and interval
programming (IP). The main goal of those models is to seek the balance among several interactive objectives
i.e., system operating costs, potential risks, inequity, waste resource, ease of construction and maintenance,
etc. Table 1 gives a summary of previous multi-objective models for waste management. As shown in Table
1, the most frequently used method is MIP combined with LP or NLP, and the most common goal is to
achieve the simultaneous minimization of both costs objective and risks objective. This is mainly due to the
fact that not only MSW but also hazardous wastes are considered in those models, however, the concern of
potential risks is less important in MSW management system, so it is replaced by environmental impact
objective in this paper. Furthermore, some objective functions, i.e., ease of construction and maintenance,
are quantified through qualified analysis or estimation. Although great efforts have already been contributed
to multi-objective models for waste management system, it is still difficult to find a model which can
completely depict the general characteristics of MSW management system due to the following reasons:
In most previous studies, the MSW management system is usually modeled as single-stage system
which merely includes waste collection point and treatment facility, or two-stage system where
transfer station is introduced as an intermediate point. The transportation and treatment of the
residue from some waste recycling or treatment facilities, i.e., incineration plant, are not involved
in most of the previous models, but in reality, they may incur higher system operating costs, larger
environmental impact (i.e., secondary pollution caused by improper treatment of waste residue) and
higher level of GHG emissions.
The environmental impact and GHG emissions have not been formulated in most of the previous
location models for MSW management. The inclusion of those two objectives will lead to more
application of environmentally friendly technologies applied in waste transportation and treatment.
In some models, the fair allocation of environmental impact to each waste generation point is
attempted, and it follows the principle that the environmental impact should be borne by the one
who generate it. However, some other locations that do not generate any waste or are served by the
waste treatment facility may be affected from the environmental impact as well, so the interests of
communities or other types of affected points next to the waste treatment facility but not be served
by it due to jurisdiction or other reasons should also be taken into account.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
The loss of weight in transfer station has rarely been discussed in mass-balance constraints of
previous models, but it may be crucial, especially in some transfer stations at which compression of
MSW is performed. For example, the MSW are not separately collected in China, so a great weight
is lost when the mixed MSW is compressed at transfer station due to the loss in the moisture content.
The transportation of MSW from waste collection points to treatment facilities may combine both
direct shipment and transshipment, and this characteristic is not addressed in previous studies.
Therefore, in order to resolve those deficiencies, a general multi-objective model for location-allocation
problems of MSW management system is developed in this paper.
3. Model development
The multi-objective location-allocation model established in this section consists of two parts. In order to
explicitly demonstrate the waste flow among different facilities in MSW management system, the
conceptual flow chart is initially modeled and the mathematical model is then formulated.
3.1 Conceptual waste flow chart
Different from previous single-stage or two-stage models, in this paper, the conceptual flow chart of MSW
management system is modeled as a three-stage system in which direct shipment, transshipment,
transportation and treatment of residue are taken into consideration. According to the functionality, facilities
in MSW management system can be categorized into four levels. The first-level is waste collection point
which is not only the end point of product life span but also the starting point of waste management. Waste
collection service is usually provided by specialized waste management company or sanitation department
of the government, and the waste collection points are always located next to the populated areas so as to
deliver timely and efficient waste collection service to local residents. The second-level facility is transfer
station which is the intermediate point between waste collection point and waste treatment facility. The
introduction of transfer station can greatly enhance the integration of MSW management system and
improve the transport efficiency, because it is much cheaper to transport a large amount of solid waste over
long distance due to economy of scale. In transfer station, different types of waste are collected and
distributed to corresponding facilities for further treatment. Besides, pre-processing of MSW including
sorting, crushing and compression is also performed at some transfer stations in order to improve the
processing efficiency and quality of downstream treatments within MSW management system. In this three-
stage MSW management system, waste handling facilities are classified into two types. The recycling
facility and waste-to-energy (WTE) facility, i.e., incineration plant, composting plant, mechanical biological
treatment (MBT), etc., at which residues may be generated in the waste recycling/treatment process, are
defined as third-level facility. The fourth-level facility is disposal facility which is the final destination of
both waste and residue. Normally, it is the sanitary landfill in MSW management system.
Fig. 1 shows the waste flow through the entire MSW management system. As shown in this figure, the
MSW is transported along one direction from the starting point (first-level facility) via intermediate point
(second- and third-level facility) towards final destination (fourth-level facility). The MSW collected at each
generation point can either be directly transported to third- and/or fourth-level facility for
recycling/treatment/proper disposal, or be first transported to second-level facility for pre-processing and
further distribution. In MSW management system, direct shipment and transshipment are usually combined
to distribute different types of waste. Due to this reason, the three-stage conceptual waste flow chart has
better adaptation for the general characteristics of MSW management system. In addition, from the logistics
perspective, the reverse waste flow from downstream facilities to upstream facilities, which may increase
the level of difficulty in model formulation and computation, can be effectively eliminated in this system.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Fig.1 Conceptual framework of MSW management
Before the multi-objective location-allocation model for MSW management system is formulated, some
assumptions have to be primarily defined as follows.
The related data of locations of each waste collection points and candidate points for new facilities,
(planned) facility capacity, waste generation, unit waste treatment/transportation costs as well as
the other necessary parameters are known or can be estimated in the studied area.
Both heterogeneous and homogenous solid waste from one waste collection point can either be
directly transported for treatment or be distributed through transshipment.
The number of service (second-level) and treatment (third- and fourth-level) facilities that serve one
waste collection point is unlimited, which means MSW from one collection point can be
simultaneously allocated to several facilities for treatment or transshipment.
The costs objective function is assumed to be linear function or segmented linear function in nature.
The transportation costs of MSW are directly proportional to the transported waste quantity and
distance, and the waste treatment costs are directly proportional to the processed waste amount.
The time-varying parameters are not taken into consideration in this model. For example, the net
present value (NPV) and discount factor are not formulated when facility depreciation costs are
calculated.
The model and decision making consider normal operation of MSW management system, so the
additional costs associated with the equipment failure or malfunction of facilities are not taken into
account.
3.2 Mathematical model
The mathematical model formulated in this section aims to thoroughly describe the three-stage waste
management system and to optimally manage the interactions among different objectives. There are three
objective functions in this model, which are illustrated in Eq. (1), Eq. (2) and Eq. (3), respectively. The
definitions of decision variables and parameters are first given as follows.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Parameters:
I, i
Set and index of first-level point (waste generation and collection);
J, j
Set and index of the candidate point of second-level facilities;
K, k
Set and index of the candidate point of third-level facilities;
L, l
Set and index of the candidate point of fourth-level facilities;
H, h
Set and index of the communities or other type of important points
affected by waste treatment;
cij, cik, cil, cjk, cjl, ckl
Unit waste transportation costs from i to j, from i to k, from i to l, from
j to k, from j to l and from k to l;
Fj, Fk, Fl
Fixed facility costs of facility j, k and l;
fj, fk, fl
Unit variable waste treatment costs of facility j, k and l;
bk
Unit profit generated from waste recycling or treatment at facility k;
Eij, Eik, Eil, Ejk, Ejl, Ekl
Emission coefficient of waste transportation from i to j, from i to k,
from i to l, from j to k, from j to l and from k to l;
Lij, Lik, Lil, Ljk, Ljl, Lkl
Load capacity of transport vehicle from i to j, from i to k, from i to l,
from j to k, from j to l and from k to l;
Sh
Size of affected community or relevant importance of other type of
affected point;
Rk, Rl
level of environmental impact of waste treatment facility;
Xkh, Xlh
Pollution compensation coefficient to each affected point;
CAj, CAk, CAl
Capacity of facility j, k and l;
Limitj, Limitk, Limitl
Lower limits of facility j, k and l;
dhk, dhl
Euclidean matric between h and k, and between h and l;
α, δ, µ, θ
Adjustment parameters;
Dx
Depreciation costs of facility x;
Ccx
Construction costs of facility x including the interests of bank loan;
Lx
Expected life span of facility x;
Z
An infinite positive number;
Al
The waste amount treated at facility l;
Gi
The waste amount collected at facility i;
pj, pk, pl
Maximum number of each kind of facility to be built;
rj, rk
Input-Output rate at facility j and facility k;
Decision variables
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
xj, xk, xl
Boolean variable which decides whether the candidate point is selected
for building waste treatment facility, if it equals to 1, the candidate
point is chosen, if it equals to 0, otherwise;
wij, wik, wil, wjk, wjl, wkl
The waste amount transported from i to j, from i to k, from i to l, from
j to k, from j to l and from k to l;
Minimize overall system costs:

 
 
 
 


 



 



 
 


(1)
Minimize GHG emissions:


 

 

 

 





(2)
Minimize Environmental impact:

 

 


 

 
 
 

(3)
Eq. (1) is the cost-minimization objective function. The overall system costs are comprised of facility
operating costs and waste transportation costs. Facility operating costs include the fixed annual costs and
variable waste treatment costs. In MSW management, the first one usually refers to facility depreciation
costs, maintenance costs, personnel costs as well as other fixed annual investments, while the other one
mainly refers to the energy consumption costs, overtime costs and other variable costs that are directly
proportional to the waste amount. Facility depreciation costs constitute a great share of fixed annual costs,
and it is related to facility construction costs and expected life span. Eq. (4) is a simplified formula which
can be applied in roughly calculating and estimating the depreciation costs. The facility depreciation costs
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
are determined by the construction costs and bank interests over the entire payback period (overall
investment for constructing the facility), and expected life span of the facility, and it is noted that the value
change of currency within the facility life span caused by inflation or deflation is not taken into account in
this equation. When the system design is performed on a multi-period basis, the different cost components
in Eq. (1) should be discounted, as discussed in Zhang et al. (2011), and the facility depreciation costs should
be considered and calculated as an equivalent annual costs. For more information and discussion for the
facility cost estimation of MSW management, the research works conducted by Tsilemou and
Panagiotakopoulos, (2006) and Komilis and Liogkas (2014) can be referred.


(4)
Excessive GHG emissions have become the most important driving force for global warming and climate
change (Nojima et al., 2016), so the minimization of GHG emissions is of importance. Eq. (2) aims at
minimizing the GHG emissions from the transportation of MSW. In this model, GHG emissions are directly
proportional to the transported waste amount and the emission coefficient. The emission coefficient is
mainly determined by the type transport distance, and it increases with the increase of transport distance.
Furthermore, the emission coefficient is also affected by the type of transport vehicle, fuel consumption,
technical level, terrain, and driving habits (Elhedhli and Merrick, 2012). In this equation, the GHG emissions
are inversely proportional to the load capacity of transport vehicle, because, as a general rule, the number
or frequency of transportation of MSW decreases accordingly with the increase of the load capacity of
transport vehicles. Herein, it is noted that the facility-related GHG emissions are not formulated in this
equation due to the fact that it may lead to inappropriate solutions in the design of MSW management system.
For example, a large amount of MSW may be allocated to landfill but not incineration plant due to its more
GHG emissions, however, this is not the proper solution for a sustainable MSW management system,
because the environmental impact of landfill is much severer than incineration plant. Therefore, the facility-
related GHG emissions are considered as one of the indicators of environmental impact of the waste
treatment facility.
Eq. (3) aims at minimizing the environmental impact of waste treatment facilities and it is derived from a
disutility function. In Eq. (3), the environmental impact is directly related to the amount of MSW treated
and the size (population) of influenced community or the relative importance of affected point, while it is
inversely related to the Euclidean matric (straight-line distance) from waste treatment facility to affected
point. Meanwhile, the waste treatment technology applied in each facility determines the level of
environmental impact, which pushes the result of this objective function to more application and practices
of environmentally friendly technologies.
Some affected points may be more sensitive to and severely influenced by a certain type of waste treatment
facility. For instance, the leak of high-density toxic leachate from landfill imposes much higher level of
environmental impact to surface and ground water source than other types of affected points. The pollution
compensation coefficient is therefore introduced to Eq. (3) for balancing the level of environmental impact
of waste treatment facilities with respect to each affected point. Adjustment parameters , and represent
the corresponding importance of each impact factor, which increase the flexibility of this objective function.
For example, if adjustment parameter is set to 0, the influence of community size is eliminated, but the
equity or social fairness will be improved, which means a larger share of potential risks associated with
waste treatment cannot be imposed to a community due to its small size or population. In addition, the
environmental impact of waste collection points and transfer stations are not accounted in Eq. (3) due to
their insignificant influences on the environment. When determining the value of adjustment parameters,
stakeholders’ involvement is important due to the potential influence on the design and planning of MSW
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
management system. The influence of adjustment parameters (, and ) may be eliminated
in decision-making when time or relevant information are in scarce.
Besides the objective functions, six sets of constraints are also formulated in this model so that the mass
balance requirements, national and regional environmental legislations, pre-assumptions, facility capacity
and compatibility as well as other relevant requirements can be fulfilled. And they are presented as follows.

 
 
 
(5)

 
 
 
(6)

 
 
 
(7)

 
 
 
(8)
The first group of equations is mass balance constraint. Eq. (5) restricts the MSW collected at each demand
point can be totally served and transported to downstream facilities for further treatment. Eq. (6) depicts the
relationship between input and output waste amount at second-level facilities, and rj is less than 1 when pre-
processing of MSW is performed at transfer station. Eq. (7) illustrates the output waste amount equals to
the product of input waste amount and waste-to-residue rate at third-level facilities. Eq. (8) guarantees the
residue generated in waste treatment process and the wastes cannot be treated at third-level facilities are
totally disposed at four-level facilities. Mass balance constraint is the basic logistical requirement and is of
significant importance due to its necessity to the computation of this model, and the weight loss at transfer
stations is emphasized to better represent the characteristics of MSW management system.

 
(9)

 
 
(10)

(11)
The second group of formulas is facility capacity constraint. Eqs. (9), (10) and (11) restrict the waste
amounts treated at facility j, k and l are less than their capacity or planned capacity, and more than their
lower limits. Herein, the lower limits are introduced into capacity constraint in order to maintain the
utilization of facilities at an acceptable level.

(12)
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y

(13)

(14)

(16)

(17)

(18)
The third group of constraints restricts the transportation between two nodes within MSW management
system can happen only when the respective candidate locations are selected. For example, Eq. (12) restricts
the waste can be transported to and treated at second-level facility j only when the candidate point j is
selected for opening transfer station. Likewise, Eqs. (13)-(18) are transportation constraints for third-level
and fourth-level facility.
 
(19)
 
(20)
 
(21)
Eqs. (19), (20) and (21) restrict the maximum number of second-level, third-level and fourth-level facility
to be opened in MSW management system, respectively.

(22)

(23)
The last group of constraints is the basic requirements for decision variables. Eq. (22) determines if the
candidate point is selected for opening the respective facility. Eq. (23) guarantees the waste amount
transported from/to each facility is a positive number.

 
 

(24)
In addition, as a general model for the design of MSW management system, some prerequisites and
constraints can be relaxed or tightened for adapting the characteristic of a specific MSW management
system. For instance, if the direct shipment and transshipment of solid waste from one collection point
cannot be performed simultaneously and only one transportation mode can be applied in each waste
collection point, Eq. (24) can be applied in order to select the proper transportation mode for each waste
collection point.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
3.3 Model solution
In the design and planning of MSW management system, qualitative analysis and quantitative calculations
are usually combined in order to generate an appropriate solution. For resolving this multi-objective
location-allocation model, the qualitative analysis should first be applied in narrowing the set of feasible
solutions. Due to the significant environmental impact of some waste treatment facilities, it is necessary to
select qualified candidate locations that minimize the risks of pollution and negative influence on the health
and lifestyle of nearby residents. In most countries, a buffer area for waste treatment facility as well as other
undesirable facilities is imposed in order to decrease the potential risks. In addition, similar with the function
of adjustment parameter , the buffer area requirement can also be used for increasing the social fairness
and equity. In this model, although the inequity-minimization objective is not formulated independently, the
inequity can still be maintained in an acceptable range through adjusting those two parameters.
After the preliminary selection of candidate locations, quantitative calculation will be performed for
providing decision-makers with analytical scenario-based results. In this model, the objective functions
cannot be combined directly in a quasi-addictive form (i.e., distributing weights to each of them), because
their formulas have different measures of units. The units of Eq. (1) is a kind of currency while Eqs. (2) and
(3) are index and unitless. Therefore, a normalization function from Nema and Gupta (1999) is employed
in order to composite those three objective functions (Eq. (25)). Practices with similar methods for
combining multiple objectives with different measures of units are also provided in Sheu (2007), Sheu and
Lin (2012), Yu et al. (2014) and Yu et al. (2015).





(25)
Herein, ,  and  are the weight of each utility function, and ,
 and  represent the individual optimal value of each objective
function, respectively. Eq. (25) aims at eliminating the units in the objective functions and optimizing the
overall system performance with respect to the given weight combination. The individual optimal system
operating costs, GHG emissions and environmental impact can be calculated by separately solving each
single objective function. The cost utility, GHG emissions utility and environmental impact utility can then
be calculated through using Eqs. (1), (2) and (3) divided by their respective individual optimal value, so
each utility function should be more than or equal to 1 (best-case scenario). Similar with the meaning of
standard deviation in quality management, which represents the level of deviation of tested products to the
standard size and determines if the quality of this batch of products is satisfied with the requirement, the
utility of each objective function in Eq.(25) illustrates the level of deviation from the individual optimal
value. Therefore, the less the utility of each objective function achieves, the better the result is (low level of
deviation from the individual optimal value). The overall system performance can then be obtained through
multiplying by the respective weights of costs, GHG emissions and environmental impact, and the optimal
solution to this composite objective function is the one with the smallest utility. In addition, the summation
of the weights is specified in this model, and it equals to 1. Therefore, the optimal achievable overall utility
is 1 when the utility of each objective function equals to 1, but in practice, it is impossible to be achieved
and the value of the overall utility of this composite model should always be more than 1.
4. Numerical experiment
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
An example is given in this section to illustrate the application of proposed model. The parameters are
defined as a very small set representing a real-world decision-making for the network configuration of MSW
management system. The purpose of this example is to determine the optimal configuration of a regional
MSW management system with six communities (i1,i2,i3,i4,i5,i6), five candidate points for transfer stations
(j1,j2,j3,j4,j5), four candidate points for incineration plants and composting plants (k1,k2,k3,k4,k5), and four
candidate points for landfills (l1,l2,l3,l4). In this example, the set of waste generation points equals to the
set of affected communities (i=h). The maximum number of transfer stations, incineration plants and
composting plants, and landfills to be opened are pj=2, pk=2 and pl=1, respectively. In order to have a better
representation of generality, the input parameters are generated randomly, and the units of parameters are
not specified. Table 2 presents the parameter intervals used for generating random numerical values. As
shown in the table, the population of communities is between 10000 and 50000, and the waste generation
of each community is directly related to the population and waste generation per capita. In this example, a
reasonable assumption is applied for depicting the proportionality of both unit transportation costs and GHG
emission factors with transport distance. And the different intervals for multiplying the distance in unit
transportation costs and GHG emissions represents the different types of transport vehicles used in each
itinerary. Besides, it is also noted that the ratio between Emission coefficient and location capacity in Eq.
(2) is linearized for simplifying the problem. And intervals for other parameters are also given in the table.
In addition, adjustment parameters , and are set to 1, 2 and 0.8 for calculating the environmental
impact, and the weight of individual cost objective, individual GHG emission objective and individual
environmental impact objective are given as 0.4, 0.3 and 0.3 for determining the optimal value of the overall
performance.
The proposed model is resolved by using Lingo 11.0 optimization solver on a personal computer with Inter
Core2 Quad 2.4 GHz CPU and 2 GB RAM under windows 7 operating system. The CPU running time for
calculating the optimal value of individual cost objective, individual GHG emission objective, individual
environmental impact objective and overall performance objective are 6 seconds, 9 seconds, 10 seconds and
4 seconds, respectively. The computational results are presented in Tables 3 and 4 and Figs. 2 and 3. Table
3 illustrates the total system costs, GHG emissions, environmental impact and selection of facilities of
individual optimal cost scenario, individual optimal GHG emissions scenario, individual optimal
environmental impact scenario as well as the optimal overall performance scenario, and Table 4 presents
the transportation strategy of MSW in each scenario. Fig. 2 shows the comparison of system operating costs,
GHG emissions and environmental impact of each scenario, and the value of system operating costs, GHG
emissions and environmental impact are normalized through dividing by 103, 103 and 106, respectively, so
that the comparison is presented in an intuitive fashion. The comparison of the cost components is given in
Fig. 3, and the value of each cost component is normalized as well.
Table 2 Parameter intervals used for generating random numerical values
Parameter
Interval
Population
Pi (Sh)
(10000, 50000)
Waste generation
Gi
(200, 300)*Pi
Fixed costs
Fj, Fk, Fl
(200, 300) *105, (400, 500)* 105, (250, 400)* 105
Variable costs
fj, fk, fl
(5, 10), (5, 20), (5, 15)
Capacity
CAj, CAk, CAl
(300, 400) *105, (200, 300)* 105, (200, 400)* 105
Lower limits
Limitj, Limitk, Limitl
(40, 80) *105, (50, 80)* 105, (30, 50)* 105
Input-output rate
rj, rk
(0.7, 1), (0.4, 0.7)
Distance
dsij dsik dsil dsjk dsjl dskl
(5, 10), (20, 40), (30, 50), (15, 25), (15, 30), (10, 30)
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Unit transportation costs
cij, cik, cil, cjk, cjl, ckl
(3, 6)*dsij, (4, 7)*dsik, (4, 7)*dsil, (2, 5)*dsjk, (2,
5)*dsjl, (3, 5)*dskl
Emission coefficient/Load
E/Lij, E/Lik, E/Lil, E/Ljk,
E/Ljl, E/Lkl
(2, 5)*dsij, (2, 5)*dsik, (2, 5)*dsil, (4, 8)*dsjk, (4,
8)*dsjl, (2, 5)*dskl
Environmental impact level
Rk, Rl
(1, 3), (2, 5)
Euclidean matric
dhk,(dik) dhl dil)
dsik/1.5, dsil/1.5
Table 3 Optimal value and selection of facilities of individual cost objective, individual GHG emission objective, individual
environmental impact objective as well as the overall performance objective
Scenario
Value of objective functions
Facility selection
Cost (103)
GHG emissions
(103)
Environmental
impact (106)
Optimal cost
3410356
4916766
5293771
j1, j3, l3
Optimal GHG emission
6278061
3447465
6095225
j2, j3, k1, k2, l3
Optimal environmental
impact
7081819
7090780
3173146
j1, j2, k1, l2
Optimal overall
performance
4794319
3851658
3809423
j1, j5, l1
As shown in the tables and figures, candidate points j1, j3 and l3 are selected for opening transfer stations
and landfill when the overall system operating costs are minimized. It is noted that the least numbers of
facilities are opened in this scenario in order to minimize the overall system costs, and both facility costs
and transportation costs are significantly reduced compared with the other scenarios. In this scenario, the
lower fixed costs and unit processing costs accompanying with higher input-output rate at locations j1 and
j3 become advantage for reducing the second-level facility costs. Compared with landfill, the higher fixed
investment and additional costs for the transportation of residues become the main obstacles for opening
third-level facilities even though they are more environmentally friendly. In addition, all the MSW are
distributed via transfer stations, and no direct shipment between waste generation points and landfill exists.
And this has revealed that transportation of MSW via transfer stations has better economic efficiency than
direct shipment.
When the optimal value of individual GHG emissions objective is obtained, candidate points j2, j3, k1, k3
and l3 are chosen. Compared with the individual optimal cost scenario, the overall system operating costs
and environmental impact increase by 84.1% and 15.1%, respectively, and the GHG emissions reduce by
29.9%. It is noted that the maximum numbers of all levels of facilities are reached in this scenario, and the
network configuration is the most complex one. The individual GHG emissions objective aims at
minimizing the GHG emissions from the transportation of MSW, so the transportation network of MSW
management system is planned in a more complex manner in order to enhance the network integration and
reduce the overall GHG emissions. Furthermore, as shown in Table 4 and Fig. 3, the increase of system
operating costs is mainly contributed by the significant increase in the transportation costs in this scenario,
and this is caused by two reasons. First, the numbers of itinerary in MSW transportation are more than that
in the other scenarios due to the complex network configuration. Second, in this scenario, more advanced
transport vehicles with less GHG emissions are applied in the transportation of waste and residue in order
to reduce the overall GHG emissions of MSW management system, and this will lead to more investments
in the upgrade of transport vehicles (Wang et al., 2011).
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Fig.2 Comparison of system operating costs, GHG emissions and environmental impact of each scenario
Fig.3 Comparison of total costs, facility costs and transportation costs of each scenario
Candidate points j1, j2, k1 and l2 are selected when the optimal value of individual environmental impact
objective is achieved. Compared with the individual optimal cost scenario, the system operating costs and
GHG emissions increase by 107.6% and 44.2%, and the environmental impact decrease by 40%. Compared
with the individual optimal GHG emissions scenario, the system operating costs and GHG emissions
increase by 12.8% and 105.7%, and the environmental impact decrease by 47.9%. The environmental impact
is determined by the waste amount processed and the technology used at the third-level and fourth-level
facilities. In this scenario, it is observed that all the MSW are first compressed at and then distributed via
transfer stations, because this will significantly reduce the weight of MSW treated at the incineration plant
and landfill due to the elimination of the moisture content. Candidate points j1 and j2 are chosen in this
scenario, because of their higher input-output rate. Compared with the individual optimal cost scenario,
more solid wastes are treated at composting plants or incineration plant in this scenario in order to minimize
the environmental impact of the MSW management system, and both facility costs and transportation costs
are dramatically increased. In general, when the minimization of environmental impact is the primary target
in the decision-making, both the second-level and third-level facilities become preferable due to the loss of
weight and improved environmental sustainability, and the amount of waste directly sent to landfill is greatly
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
reduced. This results in more investments of MSW management due to the fact that more facilities have to
be opened at the second-level and third-level, and in this scenario, the waste is transported in a more complex
network leading to an increased transportation costs of MSW. Furthermore, without the consideration of the
use of advanced transport vehicles with less GHG emissions, this complex transportation network also
results in a significant increase in the overall GHG emissions of MSW management system.
Table 4 Transportation strategy of MSW in each scenario (Normalized by dividing 103)
Itinerary
Objective
Individual costs
Individual GHG
emissions
Individual impacts
Overall
performance
wij
(1, 3)/9838158
(2, 2)/6330580
(1, 1)/3247331
(1, 5)/9838158
(2, 3)/6330580
(4, 3)/2280321
(1, 2)/6590827
(2, 1)/2150738
(3, 1)/9604515
(5, 2)/7427048
(2, 1)/6330580
(2, 5)/115031
(4, 1)/7219696
(6, 3)/3499008
(3, 1)/9604515
(3, 5)/9604515
(5, 3)/7427048
(4, 1)/7219696
(4, 5)/7219696
(6, 3)/3499008
(5, 1)/7427048
(5, 5)/7427048
(6, 2)/3499008
(6, 1)/3499008
wik
(1, 3)/9838158
(3, 1)/9604515
(4, 1)/4939375
wil
(2, 1)/4064811
wjk
(1, 1)/12432800
wjl
(1, 3)/13459370
(2, 3)/13757630
(1, 2)/14630540
(1, 1)/4519797
(3,3)/24385310
(3, 3)/5201396
(2, 2)/10089840
(5, 1)/27363560
wkl
(1, 3)/7271945
(1, 2)/6216399
(3, 3)/4919079
When the optimal value of the overall performance objective is reached, candidate locations j1, j5 and l1
are selected for opening the transfer stations and landfill. Compared with the optimal values of each
individual objective function, the system operating costs, GHG emissions and environmental impact
increase by 40.6%, 11.7% and 20%, respectively. In this scenario, most MSW are distributed via transfer
stations and the only exception is the waste flow from community i2 from which 4064811 wastes are directly
transported to landfill l1. It is clearly shown that the three individual objective functions are compromised
with each other in the overall performance objective so as to obtain the optimal trade-off (minimum utility)
with respect to the given combination of weights. Besides, it is also observed that, with the increased
investment at 40.6% in the optimal overall performance scenario, the GHG emissions and environmental
impact improve by 21.7% and 27%, respectively, compared with the individual optimal cost scenario. This
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
reveals, with the evenly allocated weights to the GHG emissions objective and environmental impact
objective in this numerical experiment, the increased amount of investment leads to more effective reduction
of environmental impact of MSW management system.
Table 5 Sensitivity analysis
Scenario
Weight
Overall utility
Facility selection
Wt1
Wt2
Wt3
1
0.5
0.25
0.25
1.2705
j1, j3, l3
2
0.25
0.5
0.25
1.2513
j1, j5, k1, l1
3
0.25
0.25
0.5
1.2204
j2, j5, k2, l2
4
0.6
0.3
0.1
1.2193
j3, j5, l3
5
0.1
0.6
0.3
1.1774
j2, j5, k4, l2
6
0.3
0.1
0.6
1.1646
j2, j5, k2, l2
7
0.8
0.1
0.1
1.1094
j1, j3, l3
8
0.1
0.8
0.1
1.1268
j1, j5, k4, l1
9
0.1
0.1
0.8
1.1093
j2, j5, k2, l2
10
0.4
0.4
0.2
1.2484
j1, j5, l1
11
0.2
0.4
0.4
1.205
j1, j5, l1
12
0.4
0.2
0.4
1.2393
j2, j5, k2, l2
13
1/3
1/3
1/3
1.2738
j2, j5, k2, k4, l2
14
0.7
0.2
0.1
1.1519
j1, j3, l3
15
0.2
0.1
0.7
1.1373
j2, j5, k2, l2
16
0.1
0.7
0.2
1.2428
j2, j3, k3, l3
In this section, sensitivity analysis with different combinations of the weight of each individual objective
function is also performed, and the CPU running time for calculating the optimal result of each scenario
varies between 3 and 9 seconds. The purpose of the sensitivity analysis is to present a series of Pareto
solutions with respect to different combinations of weights. In the design of MSW management system, it
could be extremely difficult for the decision maker to determine the weight of each objective function at the
initial stage, and the result from the sensitivity analysis provides decision makers with a very good reference
of the trade-offs among different objectives with the change of weights. The combination of weights used
in the sensitivity analysis is adopted from Samanlioglu (2013) in order to generate dispersed representations
of Pareto solutions, and a detailed introduction for generating dispersed weight vectors is given by Steuer
(1986).
For generating the Pareto solutions, we resolve the problem for 16 times. Table 5 presents the result of the
sensitivity analysis. It is clearly shown that the overall utility and network configuration vary significantly
with the change of the weight combinations. The smallest overall utility 1.1094 is obtained in scenario 9
(0.1, 0.1 and 0.8) when facilities j1, j3, l3 are selected, and the largest overall utility1.2738 is achieved in
scenario 13 when facilities j2, j5, k2, k4, l2 are chosen. The overall utility is an indicator revealing the sum
of weighted deviations from the individual optimal performance, but the comparison is not meaningful
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
without the discussion of managerial insights. Due to this reason, we also compare the system operating
costs, GHG emissions and environmental impact of each Pareto solution.
Table 6 Comparison of the Pareto solutions
Scenario
Cost
(106)
Dev.C
GHG
emissions
(106)
Dev.G
Environmental
impact (109)
Dev.E
1
3472
1.8%
4644
34.7%
5390
69.9%
2
4925
44.4%
4015
16.5%
3908
23.1%
3
4062
35%
5038
46.2%
3285
3.5%
4
3584
5.1%
4813
36.6%
5390
69.9%
5
5718
67.7%
3926
13.9%
3452
8.8%
6
4464
30.9%
5200
50.8%
3285
3.5%
7
3410
0%
4917
42.6%
5294
66.8%
8
5352
56.9%
3616
4.9%
4154
30.9%
9
4602
35%
5038
46.2%
3285
3.5%
10
4833
41.7%
3804
10.4%
3809
20%
11
4833
41.7%
3804
10.4%
3809
20%
12
4464
30.9%
5200
50.9%
3285
3.5%
13
5066
48.6%
4345
26%
3424
7.9%
14
3472
1.8%
4644
34.7%
5390
69.9%
15
4464
30.9%
5200
50.8%
3285
3.5%
16
4692
37.6%
3581
3.9%
5998
89%
Optimal cost
3410
0%
4917
42.6%
5294
66.8%
Optimal GHG
emission
6278
84%
3447
0%
6095
92%
Optimal
environmental impact
7082
107.6%
7091
105.7%
3173
0%
a Dev.C=Deviation from the individual optimal costs, Dev.G=Deviation from the individual optimal GHG emission,
Dev.E=Deviation from the individual optimal environmental impact
Table 6 shows the comparison of system operating costs, GHG emissions and environmental impact of each
Pareto solution, and the deviation from the individual optimal performance is also illustrated in this table.
Besides, three benchmarking scenarios (individual optimal costs, individual optimal GHG emissions and
individual environmental impact) are included in the table. The combination of weights and deviation from
the individual optimal value are also given in Fig. 4 and Fig. 5, respectively. With the result of the sensitivity
analysis, decision makers do not have to make a rush decision on the allocation of weights to each objectives,
and it enables the comparison of different scenarios. For example, when Wt1=0.8, Wt2=0.1 and Wt3=0.1
(Scenario 7), the optimal result is the same as the individual optimal cost objective. And then scenarios 10
and 12 are selected to compare with the trade-offs among costs, GHG emissions and environmental impact
with respect to different weight combinations. Compared with Scenario 7, the overall system costs increase
by 41.7%, and the GHG emissions and environmental impact decrease by 22.6% and 28% in scenario 10
(0.4, 0.4, 0.2). In scenario 12 (0.4, 0.2, 0.4), the total system costs and GHG emissions increase by 30.9%
and 5.8%, respectively, and the environmental impact decreases by 37.9%. It is clear that scenario 12 is the
better choice when the primary target of the design of MSW management system is to reduce the
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
environmental impact in a cost-efficient manner, however, when the simultaneous balance of GHG
emissions and environmental impact is focused, scenario 10 has a better performance with more cost
increase.
Fig.4 Comparison of the weight combinations of the test scenarios
Fig.5 Comparison of the deviation from the individual optimal values of the test scenarios
In general, more costs have to be invested in order to reduce the GHG emissions and environmental impact
of MSW management system, and the sensitivity of GHG emissions and environmental impact with
increased investments (or cost efficiency) may vary greatly. The set of Pareto solutions provides decision
makers with several different efficient options, and in reality, the one reflecting the preference of the
decision makers will be selected to implement.
5. Computational efficiency
In this section, numerical experiment of six scenarios with different size of problem is given in order to test
the computational performance of the proposed model for resolving small, medium and large scale problems.
The same data structure and parameter intervals from previous section are employed so that the
computational efficiency of the proposed model is validated with a high level of confidence. In order to
simplify the problem and avoid infeasible solutions, the model is relaxed to a uncapacitated formulation
through taking out the constraints of the maximum number of each level of facilities to be opened (Eqs.(19)-
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
(21)). Table 7 presents the size of problem in each scenario in terms of the number of integer variables and
the number of total variables for each objective function. As shown in the table, the number of integer
variables increases incrementally by 15 from scenario 1 to 6, however, the number of total variables
increases more dramatically, for instance, the number of total variables of individual cost objective increases
from 180 at scenario 1 to 5580 at scenario 6. Based upon the size of problem, we divided the six scenarios
into three groups: small scale (scenario 1 and 2), medium scale (scenario 3 and 4), and large scale (scenario
5 and 6).
Table 7 Size of problem of each scenario
Scenario
Parameters
Integer variables
Total variables
i
j
k
l
CtO
GgO
EtO
OrO
1
5
5
5
5
15
180
165
180
180
2
10
10
10
10
30
690
630
690
690
3
15
15
15
15
45
1440
1395
1440
1440
4
20
20
20
20
60
2520
2460
2520
2520
5
25
25
25
25
75
3900
3825
3900
3900
6
30
30
30
30
90
5580
5490
5580
5580
a CtO=individual cost objective, GgO=individual GHG emission objective, EtO=individual environmental impact objective,
OrO=overall utility objective
The computational results are illustrated in Table 8 and Fig. 6. As shown in Table 8, it is obviously that the
time consumption for calculating the optimal value of each individual objective and overall utility objective
increases gradually with the increase of the size of problem, and only one exception is observed in scenario
4 for calculating the minimum value of individual environmental impact, which requires more CPU running
time than other scenarios. The individual cost objective is the most time consuming part, which requires
much more time than other objective functions for calculating the global optimal value. Furthermore, it is
also noted that the CPU running time for determining the optimal network configuration of individual
environmental impact objective is around 300 seconds for both medium and large sized problems. In
addition, all the six test scenarios in this section can be resolved with Lingo optimization solver within
reasonable time. In general, small and medium sized problems can be resolved within ten minutes, but much
more CPU running time is required for calculating the optimal result of large scale problems.
Table 8 CPU times and optimal value of overall performance
Scenario
CPU times (seconds)
Optimal overall performance
CtO
GgO
EtO
OrO
1
20
1
1
8
1.1678
2
56
5
22
37
1.1529
3
246
79
323
232
1.1204
4
292
289
215
321
1.1061
5
1110
306
305
522
1.1186
6
1336
396
307
548
1.1336
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Fig.6 Comparison of system operating costs, GHG emissions, environmental impact and overall utility in different
scenarios
Fig. 6 presents the comparison of the optimal value of individual cost objective, individual GHG emissions
objective, individual environmental impact objective and overall performance objective in each scenario.
As shown in the figure, system operating costs, GHG emissions and environmental impact of MSW
management system increase gradually with the increase of waste generation and number of communities
it serves, and this is because more facilities and transportations are required for dealing with the increased
amount of solid wastes and satisfying the demands for MSW treatment from increased number of
communities. Besides, it is also noted the increase system operating costs and GHG emissions over the six
scenarios is approximately a linear function, however, the environmental impact has a sharper curve and a
great increase from scenario 4 is observed, which means the increase of the size of MSW management
system will bring more significant environmental impact on the nearby communities. In addition, as shown
in the figure, the optimal value of overall utility is not proportional to the size of problem, which means no
matter how large the problem is, the optimal overall balance of system operating costs, GHG emissions and
environmental impact with constant weights belongs to a certain range. For the six test scenarios, the mean
value and standard deviation of the optimal values of overall utility are 1.1332 and 0.0232, respectively.
6. Comparison of the case studies in previous research works
In this section, the adaptability of the proposed generic multi-objective location-allocation model in the
design of MSW management system is discussed through the comparison with the numerical experiments
and case studies in previous research works. Section 4 illustrates the application of the model through a full-
scale numerical experiment, however in reality, the location-allocation problem of MSW management may
be in a smaller scale (e.g., only including one level or two levels of facilities). And sometimes, not all the
objectives and constraints have to be taken into consideration due to the characteristics of the system,
limitation of time and resources, or even the necessity to account. Therefore, the numerical experiments and
case studies from some of the previous research works in Table 1 are selected to compare with the proposed
model.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
The selected research works mainly focus on the design of MSW management system with certain input
parameters, so the cases regarding hazardous waste management and time-varying parameters are not taken
into account in this section. Table 9 presents the comparison and discussion of the adaptability of the
proposed model to resolve the numerical experiments and case studies in previous research works. As shown
in the table, all the numerical experiments and case studies from the previous studies with the similar setting
of the problem structure can be resolved with the modification of the generic multi-objective location-
allocation model. For most case studies, the generic model is simplified in order to adapt the characteristics
of the problems with less objectives and/or smaller network. Only two exceptions are given by Coruso et al.
(1993) and Erkut et al. (2008), in which additional objectives have to be introduced in order to improve the
utilization of resource. Besides, it is also observed that the introduction of adjustment parameters , and
improves the flexibility and adaptability of the environmental impact objective function, as compared
with Coruso et al. (1993), Eiselt and Marianov (2014) and He et al. (2006). This result reveals the proposed
multi-objective location-allocation model has a very good adaptability of the charateristic of different case
studies from the literature. Furthermore, with more comprehensive information and data collected at the
case regions, more sophisticated decision-making including system operating costs, GHG emissions and
environmental impact can be performed through the use of the proposed model for the design of MSW
management system.
Table 9 Comparison of the proposed model with the numerical experiments and case studies in previous research works.
Article
Model validation
Country of
the case
Capability to
solve with
the model
Modification for adaptation
Numerical
study
Case
study
Badran and
El-Haggar
(2006)
Egypt
Yes
Simplifying the model with only cost
objective function
Simplifying the location problem with
the only consideration of opening
collection center/transfer station
Coruso et al.
(1993)
Italy
Yes
Simplifying the model with cost and
environmental impact objectives to
determine the structure of a two-level
network
Introducing waste of resource objective
to minimize the waste amount landfilled
Simplifying the environmental impact
objective through setting adjustment
parameters , and
Eiselt (2007)
Canada
Yes
Simplifying the model with only cost
objective function
Simplifying the network to determine the
location of transfer station
Eiselt and
Marianov
(2014)
Chile
Yes
Simplifying the model with cost and
environmental impact objectives to
determine the structure of a two-level
network
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Simplifying the environmental impact
objective through setting adjustment
parameters , and
Erkut et al.
(2008)
Greece
Yes
Simplifying the model with cost and
GHG emissions objectives
Introducing waste of resource objective
and resource recycling objective to
improve the material utilization
Galante et al.
(2010)
Italy
Yes
Simplifying the model with only cost
objective to determine the locations of
transfer stations
He et al.
(2006)
Yes
Simplifying the model with cost and
environmental impact objectives to
determine the structure of a two-level
network
Simplifying the environmental impact
objective through setting adjustment
parameters , and
Li and Wang
(2011)
Yes
Simplifying the model with cost and
environmental impact objectives to
determine the structure of a two-level
network
Introducing a multiplier to monetize
environmental impact
Noche and
Chinakupt
(2010)
Japan
Yes
Simplifying the model with cost and
GHG emissions objectives
Incorporating the facility-related GHG
emissions
7. Conclusion
This paper has presented a generic multi-objective location-allocation model for optimal network design of
MSW management system, which balances the trade-off among system operating costs, GHG emissions
and environmental impact. Different from the single-stage and two-stage transportation network developed
in previous multi-objective models for waste management system, the model proposed in this paper is based
upon a three-stage transportation network in which the transportation and treatment of residues from third-
level facilities is taken into consideration. In accordance with the different functionalities, four levels of
facilities are defined, and MSW flows sequentially from upstream facilities to downstream facilities. The
waste flow is thoroughly presented in the three-stage transportation network, and the relationship between
different levels of facilities is explicitly depicted as well. The model is open to modification in order to adapt
decision-making for both multi-facility and single-facility location problems in MSW management system.
Furthermore, this model can perform planning or site selection for not only three-stage waste management
system, but also single-stage and two-stage waste management system by eliminating the respective parts
in the formulas. However, most previous models are inefficient to describe a complex three-stage waste
management system without lots of work for modification.
The multi-objective location-allocation model aims at optimizing the trade-off of cost objective, GHG
emissions objective and environmental impact objective through determining the network configuration and
waste allocation of MSW management system, and both direct transportation of MSW to treatment facilities
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
and transshipment via transfer stations are included in the model. Numerical experiment is conducted to test
the performance of the model in decision-making of different sized problems and the results are discussed
in order to show the applicability of the model. When the system operating costs are the only objective, the
network configuration is most economic efficient but least sustainable. The introduction of GHG emissions
objective and environmental impact objective significantly influence the network configuration of MSW
management system and results in more application of environmentally friendly treatment technologies and
more integration in the transportation of MSW. For instance, as shown in the illustrative example, the
transportation of MSW via transfer stations is the most economically efficient and effective way, but the
GHG emissions may become higher than the integrated network with both direct transportation and
transshipment. In addition, the result obtained from computational experiment shows the solvability of the
medium and large sized problems.
The limitations and suggestions for further improvement of this research are discussed as follows.
1. The development of systematic framework and method for quantifying the environmental impact
(including the adjustment parameters) of MSW treatment facility is first suggested. Compared with
the system operating costs and GHG emissions, the environmental impact is difficulty to be readily
quantified, and the Delphi method or dedicated analysis (e.g., Fehr and Arantes, 2015 and
Kimbugwe and Ibitayo, 2014) may be used for a specific project. In hazardous waste treatment
facility, the risk level is usually formulated proportionally to the population exposed and waste
amount. However, more environmental indicators should be measured for a MSW management
facility, i.e., noise, water pollution, hazmat emissions, etc., and some affected points may be more
sensitive to a certain type of MSW treatment technology, further, the resilience and vulnerability
may also be taken into account (Sikula et al., 2015). Due to this reason, the development of a generic
and systematic multi-criteria framework for quantifying the environmental impact of MSW
treatment facility is of significant importance.
2. The model is developed under exact input parameters, but the planning of MSW management
system is always a long-term decision, and great uncertainties of some parameters may be existed
within its life span. For example, the level of environmental impact changes when the upgrade of
waste treatment facility is performed. Therefore, development of this three-stage multi-objective
location-allocation model of MSW management system for dealing with those uncertainties through
stochastic programming (Yu and Solvang, 2016), fuzzy programing (Yu et al. 2016), etc., is also
suggested in order to improve the robustness and reliability of the result of the model.
3. The model is developed on the single-period basis, and it could be further extended to a multi-period
mathematical model, in which case the costs will be discounted with the time period, and a more
sophisticated cost estimation model should be formulated as illustrated in Zhang et al. 2011.
4. The costs and environmental impacts from the implementation of different recycling and treatment
technologies at MSW management system are by no means identical (Chadderton et al., 2017), so
the future research may also include the decision-making of technology selection at different
facilities within the MSW management system.
5. From the perspective of mathematical optimization, the normalized weighted sum is an effective
and efficient method for priori decision-making with the predetermined combination of weights of
each objective. However, when it comes to the posteriori decision-making with multiple objectives,
the weighted sum method cannot generate a complete set of evenly distributed Pareto solutions (Das
and Dennis, 1997), so advanced methods, i.e., lexicographic weighted Tchebycheff method
(Samanliogu, 2013), augmented constraint method (Yu and Solvang, 2016), etc., are suggested
in order to generate better Pareto efficient solutions for posteriori decision-making.
6. The CPU running time increases significantly with the increase of the size of problems, and future
development may also focus on more efficient and effective computational algorithms, i.e., genetic
algorithm (Lee et al., 2015), heuristics (Yu et al., 2016), etc., in order to resolve large scale problems
within reasonable time.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Acknowledgement
The authors would like to thank the two anonymous reviewers and the editor for their constructive comments
and suggestions that helped to significantly improve the quality and presentation of this research. The
authors would like to place sincere thanks to the financial support from “Development grant program”
(40033350-4033002) by Nordland County, Norway. The funding has enabled in a cooperating project
between Narvik University College and Zhejiang University of Technology with this paper as one of the
results.
References
Achillas, C., Moussiopoulos, N., Karagiannidis, A., Banias, G., Perkoulidis, G., 2013. The use of multi-criteria decision analysis to
tackle waste management problems: a literature review. Waste Management & Research 31(2), 115-129.
Alcada-Almeida, L., Coutinho-Rodrigues, J., Current, J., 2009. A multiobjective modeling approach to locating incinerators. Socio-
Economic Planning Sciences 43, 111-120.
Alumur, S., Kara, B.Y., 2007. A new model for the hazardous waste location-routing problem. Computers & Operations Research
34, 1406-1423.
Badran, M.F., El-Haggar, S.M., 2006. Optimization of municipal solid waste management in Port SaidEgypt. Waste Management
26, 534-545.
Bautista, J., Pereira, J., 2006. Modeling the problem of locating collection areas for urban waste management. An application to the
metropolitan area of Barcelona. Omega 34, 617-629.
Caruso, C., Colorni, A., Paruccini, M., 1993. The regional urban solid waste management system: A modeling approach. European
Journal of Operational Research 70, 16-30.
Chadderton, C., Foran, C.M., Rodriguez, G., Gilbert, D., Cosper, S.D., Linkov, I., 2017. Decision support for selection of food
waste technologies at military installations. Journal of Cleaner Production 141, 267-277.
Chen, Y.J., Sheu, J.B., Lirn, T.C., 2012. Fault tolerance modeling for en e-waste recycling supply chain. Transportation Research
Part E 48, 897-906.
Consonni, S., Giugliano, M., Massarutto, A., Ragazzi, M., Saccani, C., 2011. Material and energy recovery in integrated waste
management systems: Project overview and main results. Waste Management 31, 2057-2065.
Das, I., Dennis, J.E., 1997. A closer look at drawbacks of minimizing weighted sums of objectives for Pareto set generation in
multicriteria optimization problems. Structural Optimization 14(1), 63-69.
Economopoulou, M.A., Economopoulou, A.A., Economopoulos, A.P., 2013. A methodology for optimal MSW management, with
an application in the waste transportation of Attica Region, Greece. Waste Management 33, 2177-2187.
Eiselt, H.A., 2007. Locating landfillsOptimization vs. reality. European Journal of Operational Research 179, 1040-1049.
Eiselt, H.A., Marianov, V., 2014. A bi-objective model for the location of landfills for municipal solid waste. European Journal of
Operational Research 235(1), 187-194.
Elhedhli, S., Merrick, R., 2012. Green supply chain network design to reduce carbon emissions. Transportation Research Part D 17,
370-379.
Erkut, E., Karagiannidis, A., Perkoulidis, G., Tjandra, S.A., 2008. A multicriteria facility location model for municipal solid waste
management in North Greece. European Journal of Operational Research 187, 1402-1421.
Erkut, E., Neuman, S., 1989. Analytical models for locating undesirable facilities. European Journal of Operational Research 40,
275-291.
Fehr, M., Arantes, C.A., 2015. Making a case for recycling biodegradable municipal waste. Environment Systems and Decisions
35, 483-489.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Ghiani, G., Lagana, D., Manni, E., Triki, C., 2012. Capacitated location of collection sites in an urban waste management system.
Waste Management 32. 1291-1296.
Galante, G., Aiello, G., Enea, M., Panascia, E., 2010. A multi-objective approach to solid waste management. Waste Management
30, 1720-1728.
He, B., Yang, C., Zhang, H., Shi, Y.D., 2006. Optimal design of reverse logistics network for solid waste. System Engineering 8,
38-41. (In Chinese)
Hokkanen, J., Salminen, P., 1997. Choosing a solid waste management system using multicriteria decision analysis. European
Journal of Operational Research 98, 19-36.
Hu, T.L., Sheu, J.B., Huang, K.H., 2002. A reverse logistics cost minimization model for the treatment of hazardous wastes.
Transportation Research Part E 38, 457-473.
Khadivi, M.R., Fatemi Ghomi, S.M.T., 2012. Solid waste facilities location using of analytical network process and data
envelopment analysis approaches. Waste Management 32, 1258-1265.
Kimbugwe, E., Ibitayo, O.O., 2014. Analysis of characteristic, activities, and exposure to vermin of human landfill scavengers in a
developing nation. Environment Systems and Decisions 34, 358-365.
Kojima, N., Tokai, A., Nakakubo, T., Nagata, Y., 2016. Policy evaluation of vehicle exhaust standards in Japan from 1995 to 2005
based on two human health risk indices for air pollution and global warming. Environment Systems and Decisions 36, 229-
238.
Komlis, D., Lidgkas, V., 2014. Full cost accounting on existing and future municipal solid waste management facilities in Greece.
Global NEST Journal 16(4), 787-796.
Koo, J.K., Shin, H.S., Yoo, H.C., 1991. Multi-objective siting planning for a regional hazardous waste treatment center. Waste
Management & Research 9, 205-218.
Lee, J.E., Chung, K.Y., Lee, K.D., Gen, M., 2015. A multi-objective hybrid genetic algorithm to minimize the total cost and delivery
tardiness in a reverse logistics. Multimedia Tools and Applications 74(20), 9067-9085.
Li, J., Wang, H., 2011. Municipal solid waste collection facility siting model using a heuristic algorithm. Journal of Hunan
University of Science & Technology (Nature Science Edition) 26 (1), 104-109. (In Chinese)
Nema, A.K., Gupta, S.K., 1999. Optimization of regional hazardous waste management systems: an improved formulation. Waste
Management 19, 441-451.
Noche, B., Rhoma, F.A., Chinakupt, T., Jawale, M., 2010. Optimization model for solid waste management system network design
case study. Proceeding of International Conference on Computer and Automation Engineering (ICCAE) 5, 230-236.
Or, I., Akgul, M., 1994. An optimization approach for locating a hazardous waste disposal facility in Istanbul province. Waste
Management & Research 12, 495-506.
Pires, A., Martinho, G., Chang, N.B., 2011. Solid waste management in European countries: A review of systems analysis
techniques. Journal of Environmental Management 92, 1033-1050.
Rakas, J., Teodorovic, D., Kim, T., 2004. Multi-objective modeling for determining location of undesirable facilities. Transportation
Research Part D 9, 125-138.
Samanlioglu, F., 2013. A multi-objective mathematical model for the industrial hazardous waste location-routing problem.
European Journal of Operational Research 226, 332-340.
Sheu, J.B., 2007. A coordinated reverse logistics system for regional management of multi-source hazardous wastes. Computers &
Operations Research 34, 1442-1462.
Sheu, J.B., 2008. Green supply chain management, reverse logistics and nuclear power generation. Transportation Research Part E
44, 19-46.
Sheu, J.B., 2003. Locating manufacturing and distribution centers: An integrated supply chain-based spatial interaction approach.
Transportation Research Part E 39, 381-397.
This copy is the accepted manuscript by Environment Systems and Decisions.
The final version of the paper is available on Springerlink:
https://link.springer.com/article/10.1007/s10669-017-9632-y
Cite this article as:
Yu, H. & Solvang, W.D. Environ Syst Decis (2017) 37: 289. https://doi.org/10.1007/s10669-017-9632-y
Sheu, J.B., Lin, A.Y.S., 2012. Hierarchical facility network planning model for global logistics network configuration. Applied
Mathematical Modelling 36(7): 3053-3066.
Sikula, N.R., Mancillas, J.W., Linkov, I., McDonagh, J.A., 2015. Risk management is not enough: a conceptual model for resilience
and adaptation-based vulnerability assessment. Environment Systems and Decisions 35, 219-228.
Solvang, W.D., Hakam, M.H., 2010. Sustainable logistics networks in sparsely populated areas. Journal of Service Science &
Technology 3 (1), 72-77.
Srivastava, S.K., 2008. Network design for reverse logistics. Omega 36, 535-548.
Steuer, R.E., 1986. Multiple criteria optimization: theory, computation and application. John Wiley & Sons, New York.
Sufian, M.A., Bala, B.K., 2007. Modeling of urban solid waste management system: The case of Dhaka city. Waste Management
27, 858-868.
Sun, H.J., Gao, Z.Y., 2002. Study on the location model of a safe dumpsite for hazardous materials. China Safety Science Journal
12 (4), 36-39. (In Chinese)
Tsilemou, K., Panagiotakopoulos, D., 2006. Approximate cost functions for solid waste treatment facilities. Waste Management &
Research 34, 310-322.
Wang, F., Lai, X., Shi, N., 2011. A multi-objective optimization model for green supply chain network design. Decision Support
System 51, 262-269.
Wang, K.L., Xu, Y.F., Wang, Y.L., 1997. A decision support system for sitting hazardous materials. System Engineering Theory
and Practice 11, 60-65. (In Chinese)
Wyman, M.M., Kuby, M., 1995. Proactive optimization of toxic waste transportation, location and technology. Location Science 3
(3), 167-185.
Ye, L., Ye, C.M., Chuang, Y.F., 2011. Location set covering for waste resource recycling centers in Taiwan. Resource, Conservation
and Recycling 55, 979-985.
Yu, C., Zhang, D., Lau, H.Y.K., 2016. MIP-based heuristics for solving robust gate assignment problems. Computers & Industrial
Engineering 93, 171-191.
Yu, H., Solvang, W.D., 2016. An improved multi-objective programming with augmented e-constraint method for hazardous waste
location-routing problems. International Journal of Environmental Research and Public Health 13(6), 548.
Yu. H., Solvang, W.D., 2016. A stochastic programming approach with improved multi-criteria scenario-based solution method for
sustainable reverse logistics design of Waste electrical and electronic equipment (WEEE). Sustainability 8(12), 1331.
Yu, H., Solvang, W.D., Chen, C., 2014. A green supply chain network design model for enhancing competitiveness and
sustainability of companies in high north arctic regions. International Journal of Energy and Environment 5(4): 403-418.
Yu, H., Solvang, W.D., Yuan, S., Yang, Y., 2015. A decision aided system for sustainable waste management. Intelligent Decision
Technologies 9(1), 29-40.
Yu, K.D.S., Aviso, K.B., Promentilla, M.A.B., Santos, J.R., Tan, R.R., 2016. A weighted fuzzy linear programming model in
economic inputoutput analysis: an application to risk management of energy system disruptions. Environment Systems and
Decisions 36(2), 183-195.
Zhao, J.W., Ma, Z.J., 2010. Fuzzy multi-objective location-routing-inventory problem in recycling infectious medical waste.
Proceeding of International Conference on E-Business and E-Government (ICEE), 4069-4073.
Zhang, Y.M., Huang, G.H., He, L., 2011. An inexact reverse logistics model for municipal solid waste management systems. Journal
of Environmental Management 92, 522-530.
... However, it is worthy to note that there is poor literature on this field. Most of the optimisation fields related to the road management and maintenance problem are waste allocation problems [7]- [11], human resource allocation [12], allocating resources [13], [16], highway maintenance [14], [15], winter road maintenance [17], pavement and bridge maintenance [18], presents a summary of these most recent works. They address several optimization approaches ranging from linear programming to Mixed-Integer Programming (MIP), etc. Very few of these have relied on the benefits of machine learning techniques in order to combine traditional optimisation techniques with data-driven approaches. ...
... Lingo software [7] Waste allocation problem Balancing the overall system costs, environmental impact and waste of resources [14], [15] Calculating and analysing a numerical risk factor of a road. ...
... Zhang et al. (2016) introduced a multi-objective optimization approach to determine the location of healthcare facilities with the goal of enhancing accessibility for people while reducing the population outside of coverage areas. In another context, Yu and Solvang (2017) tackled the facilities location -allocation problem in municipal solid waste management. Their approach factored in waste treatment costs, environmental impact, and greenhouse gas emissions in the design of solid waste networks. ...
Article
Full-text available
This research focuses on efficiently selecting supplier and distribution center locations in a stochastic supply chain environment. It formulates the problem as a multi-objective optimization model aiming to minimize establishment costs, inventory expenses, and transportation costs while considering capacity limitations. To solve this complex problem, the study uses a single-objective mixed integer programming model along with LP-metrics and the T-H method. The research conducts a thorough comparison of two different methods in terms of solution quality and computational efficiency, supported by statistical hypothesis testing. Additionally, multi-criteria decision-making techniques like VIKOR and PROMETHEE II are applied to rank the effectiveness of these methods. The proposed model is validated through thirty sample problems, demonstrating its reliability and suitability for addressing the challenges of supplier and distribution center location selection in an uncertain supply chain environment.
... The supply chain design for municipal solid waste management could be divided into forward and reverse supply chains. In the forward supply chain, the waste directly enters the sanitary landfill without going to recycling centers, compost, waste incinerators, or other waste disposal facilities (Yu and Solvang 2017). However, in the reverse supply chain, the waste goes to the recycling center, compost, and waste-to-energy production plants after separation. ...
Article
Full-text available
Improper waste management could lead to serious risks to human health and the environment. Thus, improving and optimizing the waste processing network are crucial. Herein, a two-stage stochastic optimization model is presented to design the waste collection network under risk to minimize the total cost and population risk. Herein, the waste types are safe recyclable and hazardous non-recyclable. After collecting and separating the wastes, the safe items are transferred to the recycling centers for processing, and the hazardous wastes are also transshipped to refinery centers for safeguarding using vehicles compatible with waste types. Moving vehicles from the central depot, waste loading from production halls, and transferring wastes to the collection centers are the routing inventory sub-problem. Transferring separated wastes from collection centers to recycling and refinery centers is the transportation sub-problem. In this study, a case study of the automotive industry is applied to the developed optimization model. Due to the network's vulnerability to uncertainty and multiple disturbances, Monte Carlo simulation is employed to generate disruption-oriented independent scenarios, and the k-means clustering algorithm is adopted to reduce scenarios. Also, the two-stage stochastic programming approach is employed to tackle ambiguous parameters using the reduced generated plausible independent scenarios. The NSGA-II algorithm tuned using the Taguchi experiment is adopted to solve the real large-scale problem. The results indicate that using refineries could reduce population risk in waste transfer and processing to an acceptable extent. Observations show a significant conflict and negative dependence between the total cost and population risk associated with waste management. Graphical abstract
... Despite these shortcomings, optimal waste management facility location and allocation have an impact on several factors, including: (a) waste collection efficiency, (b) waste management effectiveness, (c) socioeconomic factors related to site location, (d) environmental factors related to site location, and (e) operating cost factors (Yazdani et al., 2020;Yu & Solvang, 2017). ...
Article
Full-text available
Due to the numerous infrastructure development projects taking place in developing nations, large amounts of construction and demolition waste (C&DW) are unavoidable. Most C&DW management strategies, however, involve ‘isolated’ operations with high overhead. Waste data transfers are difficult to watch over. Important information needed for decision-making is, therefore, challenging to obtain. This paper’s goal is to discuss C&DW management from an integrative standpoint. Using GIS functions and a fuzzy analytical hierarchy approach, the best sites for waste management facilities can be found. A mixed integer optimization model is created to identify optimal location and allocation of waste management facilities. The objective is to reduce waste collection costs under different operational scenarios. By incorporating ‘constructs elements’ and ‘connected elements’ that are linked, isolated C&DW management ventures are transformed into successful C&DW management ventures. The effectiveness and efficiency of waste management strategies are evaluated using GIS analysis. A dashboard for tracking waste data flows is created to show how stakeholder decision making can be made easier. The proposed integrative approach differs from other approaches since it re-purposes location-allocation models and GIS data to optimize ‘isolated’ C&DW management practices. In addition, the notion of ‘construct elements’ that can be time-shared is outlined. Moreover, the notion of ‘connected elements’ that are dynamic, time-limited, and yet transient enough to provide the necessary interconnectivity is developed to support and complement the seamless function of a network of C&DW management facilities. The usefulness of the integrative approach is illustrated by a case study. Analysis of case studies demonstrates that waste management strategies in developing countries can be made more effective and waste collection efficiency can be increased. According to comparative studies, updating current waste management facilities can cut operating costs by 26%, while implementing an integrative strategy can cut costs by 52%. The discussions in this paper can help towns reevaluate C&DW management and put useful, unified C&DW management techniques into practice.
... According to Guerrero et al. (2013), a successful system should recognize the links among the environment, society, and economy to promote the effective management of municipal solid waste (MSW) across the system. Addressing environmental goals based on the percentage of treated MSW and population, according to Yu and Solvang (Yu & Solvang, 2017), enhances the possibility of lowering MSW using sustainable and ecologically acceptable techniques. Meanwhile, incorrect or abandoned MSWM has serious detrimental effects on the environment, biodiversity, social welfare, and the economy (Sisto et al., 2017). ...
Chapter
Currently, waste is regarded as a symptom of inefficiency. The generation of waste is a human activity, not a natural one. Currently, landfilling and incinerating wastes are common waste management techniques; But the use of these methods, in addition to wasting raw materials, causes damage to the environment, water, soil and air pollution. In a new concept, "Zero Waste" (ZW), waste is considered a valuable resource. A vital component of the methodology includes creating and managing items and procedures that limit waste volume and toxicity and preserving and recovering all resources rather than burning or burying them. With ZW, the end of one product becomes the beginning of another, unlike a linear system where waste is generated from product consumption. A scientific treatment technique, resource recovery, and reverse logistics may enable waste from one product to become raw material for another, regardless of whether it is municipal, industrial, agricultural, biomedical, construction or demolition. This chapter discusses the concept of zero landfills and zero waste and related initiatives and ideas; It also looks at potential obstacles to putting the ZW concept into reality. Several methods are presented to investigate and evaluate efficient resource utilization for maximum recycling efficiency, economic improvement through resource minimization, and mandatory refuse collection. One of the most practical and used is the Life Cycle Assessment (LCA) approach, which is based on green engineering and the cradle-to-cradle principle; the LCA technique is used in most current research, allowing for a complete investigation of possible environmental repercussions. This approach considers the entire life cycle of a product, including the origin of raw materials, manufacturing, transportation, usage, and final disposal or recycling. Using a life cycle perspective, all stakeholders (product designers, service providers, political and legislative agencies, and consumers) may make environmentally sound and long-term decisions.
Article
Waste-to-energy technologies can significantly alter urban metabolism and sustainability. This article proposes a multicriteria analysis framework based on the extended exergy accounting method to assess and plan a sustainable municipal solid waste management system from urban metabolism perspective. This framework includes three components. Firstly, an accounting model that integrates material, energy, social, economic, and environmental criteria was developed to identify the contribution of municipal solid waste management system to urban sustainability and to decide whether it is sustainable. Then, a multiperiod municipal solid waste management system planning model was developed to provide the optimal strategy for waste-to-energy facilities deployment and municipal solid waste allocation for different periods. Finally, multidimensional indicators were proposed for a sustainability comparative analysis in overdeployment, pressure on urban ecosystem and urban resource conversion efficiency. The proposed method was applied to the case study of household solid waste management in Shanghai and two scenarios were considered. Our comparison showed that the hybrid scenario (in which various waste recycling technologies were applied together) theoretically performs significantly more sustainable than the incineration scenario in terms of material investment, emissions, economic performance, resource depletion, and recovery. Sensitivity analysis of three parameters—the maximum deployment number of each unit waste-to-energy facility ([Formula: see text]), the minimum utilization rate ([Formula: see text]), and the capacity budget ([Formula: see text])—were carried out. The proposed hybrid method was found to be sensitive to [Formula: see text], but less sensitive to [Formula: see text] and [Formula: see text]. Lessons learnt can be used to plan similar waste-to-energy strategies in other countries.
Conference Paper
Full-text available
Today, due to various reasons, including the increase in population and the advancement of technology, the amount of urban solid waste production has increased and according to the future perspective, it will be more than the current values. The increase in waste production has made the role of municipal solid waste management more prominent than before. In most developing countries, landfilling is the dominant method for municipal solid waste management. Burying waste brings many environmental damages, and its transportation and collection require a lot of money due to the vast areas and distances with landfills. In addition, waste contains materials and energy that can be recycled, and direct burial without processing wastes these materials and energy. There are new ways to process waste to recycle materials and energy, which are, of course, costly. Therefore, it is necessary to design a supply chain network for urban solid waste management and all its dimensions such as transportation, inventory control, appropriate method, etc., in order to reduce environmental damage, costs and identify the appropriate method for each region with the help of mathematical modeling.
Conference Paper
Full-text available
در مفهوم «زباله صفر»، زباله به عنوان یک منبع ارزشمند در نظر گرفته می‌شود. در این روش، زباله به عنوان ورودی برای چرخه تولید بعدی استفاده می‌گردد. یکی از اجزای حیاتی این روش شامل ایجاد، مدیریت و روش‌هایی است که حجم زباله و آلایندگی را محدود و زباله به جای سوزاندن یا دفن، استفاده و بازیافت ‌شود. در مطالعه حاضر، مفهوم زباله صفر، ایده‌های مرتبط و موانع احتمالی برای تحقق مفهوم زباله صفر مورد مطالعه قرار گرفته است
Preprint
Full-text available
In many developing countries, the regencies in them have a relatively high degree of autonomy one of which is related to rights to place capacitated waste collection facilities from which the waste is conveyed to final waste clearance facilities. The rights include the management of waste generated by the waste producers at some places yet, due to limited budget, do not touch the waste management at this lowest level at other places. Given the growing importance and emergence of waste-related issues, the paper deals with the problem of siting household solid waste collection facilities within the context of an autonomous region. A waste-weighted P-median, a pure P-median, a P-centre, a P-dispersion and a “distance gap” models are proposed for the problem. By using data obtained from Karanganyar Regency, the Republic of Indonesia, as a problem context, the paper concludes that the best model for the siting problem in such regions is driven by the objective of the siting itself. Moreover, the paper suggests that collection facilities with large capacities should be given a lot more attention in terms of having anticipation to the demand of household solid waste the regions will have in the future.
Article
Full-text available
Today, the increased public concern about sustainable development and more stringent environmental regulations have become important driving forces for value recovery from end-of-life and end-of use products through reverse logistics. Waste electrical and electronic equipment (WEEE) contains both valuable components that need to be recycled and hazardous substances that have to be properly treated or disposed of, so the design of a reverse logistics system for sustainable treatment of WEEE is of paramount importance. This paper presents a stochastic mixed integer programming model for designing and planning a generic multi-source, multi-echelon, capacitated, and sustainable reverse logistics network for WEEE management under uncertainty. The model takes into account both economic efficiency and environmental impacts in decision-making, and the environmental impacts are evaluated in terms of carbon emissions. A multi-criteria two-stage scenario-based solution method is employed and further developed in this study for generating the optimal solution for the stochastic optimization problem. The proposed model and solution method are validated through a numerical experiment and sensitivity analyses presented later in this paper, and an analysis of the results is also given to provide a deep managerial insight into the application of the proposed stochastic optimization model.
Article
Full-text available
Hazardous waste location-routing problems are of importance due to the potential risk for nearby residents and the environment. In this paper, an improved mathematical formulation is developed based upon a multi-objective mixed integer programming approach. The model aims at assisting decision makers in selecting locations for different facilities including treatment plants, recycling plants and disposal sites, providing appropriate technologies for hazardous waste treatment, and routing transportation. In the model, two critical factors are taken into account: system operating costs and risk imposed on local residents, and a compensation factor is introduced to the risk objective function in order to account for the fact that the risk level imposed by one type of hazardous waste or treatment technology may significantly vary from that of other types. Besides, the policy instruments for promoting waste recycling are considered, and their influence on the costs and risk of hazardous waste management is also discussed. The model is coded and calculated in Lingo optimization solver, and the augmented ε-constraint method is employed to generate the Pareto optimal curve of the multi-objective optimization problem. The trade-off between different objectives is illustrated in the numerical experiment.
Article
Full-text available
Climate change exposes economic systems to numerous risks, including reduced agricultural production and electric power supply shortages. The interdependent nature of economic systems causes disruptions in any sector to cascade to other sectors via forward and backward linkages. This work develops an optimization model with which allocation of scarce goods or resources can be optimized; the model uses an overall index of satisfaction of fuzzy economic output goals under conditions of scarcity caused by climatic disruptions. The proposed model includes a vulnerability measure that integrates information elicited from expert judgment. A case study based on a scenario of drought-induced electricity shortage in the Philippine economy is examined. Results show that trade, transportation and service-oriented industries suffer losses in gross domestic product in the Philippine case.
Article
Full-text available
Measures for vehicle exhaust emissions aimed at reducing either air pollution or global warming could have counterproductive effects on one another. Increasing diesel passenger vehicles, which generally have lower CO2 emissions than gasoline counterparts, leads to increasing particulate matter (PM) emissions, while gasoline has lower PM emissions than diesel. It is said that stringent limits on PM emission factors discourages improved CO2 emission factors. Without including both effects in a risk evaluation, one cannot evaluate whether the total risk is reduced or not. Hence, we evaluated representative exhaust emission measures based on risk evaluation for both air pollution and global warming. Considering consumer choice between diesel and gasoline passenger vehicles and emissions standards adopted in Japan from 1995 to 2005, we built five cases for vehicle policy evaluation. For each case, we estimated disability-adjusted life years (DALY) as an index of human health risk caused by lung cancer linked to inhalation exposure of elemental carbon in PM as well as due to global warming linked to CO2. The results of our risk evaluation reveal that the case adopting the 2005 new long-term Japanese emission standard reduces the human health risk caused by lung cancer due to air pollution by 0.6 × 103 DALY, but would increase the risk due to global warming by 31.9 × 103 DALY compared with the case of adopting EURO 4, for the same conditions of passenger vehicle choice from 1995. These results suggest that the characteristics of Japanese emissions standards are mainly designed to reduce air pollution.
Article
Full-text available
The city subject of this research does not have any reverse logistics scheme for biodegradable waste. It goes to the landfill because recycling is considered impracticable for technical and economic reasons. The objective of this study was to refute the objections raised against biodegradable municipal waste recycling. Of the 600 tonnes of waste collected daily, 308 tonnes are biodegradable material originating from residences, merchants and shopping centers. To refute the economic objections, the study presents calculations based on compost prices and tipping fees that show a possible revenue of BRL 0.39 per kg of biodegradable waste collected and composted. This compares favorably with cardboard, paper, steel and plastics, which are recycled by market forces alone. The study identifies composting enterprises interested in receiving biodegradable municipal waste. To refute the technical objections, the research produced precedents of biodegradable discards recycling in apartment buildings and restaurants replicable at larger scales.
Article
Full-text available
Nowadays, sustainable development has increasingly drawing public attention due to environmental, economic and social reasons. To pursue a more competitive and sustainable society needs greater concentration on waste management. However, waste management is a worldwide challenge, because several interactive influencing factors, i.e., costs, risks, equity, etc., and the characteristics of different regions have to be simultaneously taken into consideration. The optimal solution for one influencing factor is usually not a good choice for another. Therefore, it is highly preferred to develop a sophisticated system analysing tool for managing those interactive influencing factors as well as the characteristics of different waste management systems in an efficient and sustainable manner. In this paper, a decision aided system based upon multi-objective programming is proposed for addressing the optimal trade-off among costs, risks and sustainability of waste management system from long-term perspective. A theoretical framework of sustainable waste management is first established, and the mathematical model as well as the computation method is then formulated accordingly. To present the application of this model, an illustrative calculation is performed as well, and the model computation in this paper is done by using programming language in a professional optimization software Lingo 13.0.
Article
The selection of an appropriate technology for waste management in a way that enhances sustainability is a complex problem requiring information from multiple disciplines. This decision is made more complex for large, diverse organizations for which individual sites or components have different requirements and capacities for waste management. For U.S. Army installations, sustainable waste management is a major obstacle for resource constrained and overburdened installation personnel. The Army has prioritized landfill diversion at installations; there is a significant push for each installation to develop and implement waste management plans that follow high-level goals set by U.S. Army Installation Management Command (IMCOM). The main objective of this study is to demonstrate an excel-based dashboard tool incorporating Multi-Criteria Decision Analysis (MCDA) for site-specific waste management technology selection. The dashboard uses the preferences of an installation and a series of weighted metrics to evaluate technologies. With this information the dashboard can rank the technologies to identify those that simultaneously meet IMCOM's objectives and are appropriate for specific sites' capabilities and resources. Fourteen different technology makes and models were compared in this version of the decision model including dehydrators, pulpers, garbage disposals, containerized in-vessel composting, windrow composting, forced-air static composting, and containerized anaerobic digestion. MCDA provides for transparent comparison of technologies for all sites, and the dashboard visualizes the level of appropriateness of each technology for each site. The approach developed here adds value in that it utilizes the priorities of the organization and identifies the best performing waste management technology given the specific capacity and capabilities of an individual site.
Article
This paper considers the problem of robust gate assignment. Three factors having significant impact on gate assignment are considered: schedule robustness, facility and personnel cost during tows, and passenger satisfaction level. To precisely evaluate passenger satisfaction level, especially for transfer passengers, a model with quadratic terms is formulated. The quadratic model can exactly represent the traveling distance of transfer passengers, which can cannot be precisely considered by traditional approximate models. However, the quadratic model is rather difficult to solve. Therefore, we then transform the model to an equivalent MIP model which is proven to be more efficient than the linearized models proposed in previous literature. In addition, in order to handle large size instances, we developed four different algorithms including diving, local branching, and relaxation induced neighborhoods (RINS), which are popular algorithms for solving general MIP models, together with a new algorithm which hybridizes the strength of RINS and diving. Extensive experiments are performed to compare the performance of the proposed algorithms.
Article
The US government has focused considerable attention on enhancing our society’s ability to protect critical systems and services from disruptive events. Over the past decade, federal agencies have bolstered their efforts to identify and minimize threats using traditional risk-based approaches such as continuity of operations and disaster risk reduction processes. However, these valuable risk identification and management tools are limited because they rely upon foreseeable factor analyses of steady-state systems with predictable hazard frequencies and severities. In assessing the capability of complex adaptive systems to cope with disruptions, an overemphasis upon engineering resilience through risk management and planning for what is predictable may cloud or detract from our efforts to better understand a system’s emergent capabilities to withstand disruptions that are unforeseeable. This article contends that augmenting traditional risk approaches through the incorporation of methodologies grounded in socio-ecological system (SES) resilience principles offers a potential avenue for improving our agencies’ abilities to assess and manage both known and unknown risks. We offer a notional rationale for broadening our examination of system vulnerabilities and present a conceptual model that combines engineering and SES resilience paradigms to facilitate the identification, assessment, and management of system vulnerabilities. The Military Installation Resilience Assessment model described herein applies risk and resilience principles to evaluate whole systems, focusing on interconnections and their functionality in facilitating response and adaptation.
Article
Scavengers, an important and legitimate group especially in developing countries, seem to have been virtually ignored by local municipalities in formulating solid waste management policies. Using researcher-administrated survey and semi-structured interviews, this study provides comprehensive information about human landfill scavengers in Kampala, Uganda, a developing nation. The results showed that the human scavengers consider waste picking as a full-time employment and not as a transitory form of urban employment. Also, the scavengers live in residential areas and not in squatter villages around the landfill. Scavengers’ exposure to flies is noted to be relatively high. The respondents do not engage in fierce competition involving pushing one another and that they often leave the collected items on the landfill without the concern of having the materials stolen. The relatively high level of trust among the scavengers can serve as a spring board for establishing scavengers’ cooperatives.