Ferry Johnny Sangari

Ferry Johnny Sangari
Universitas Negeri Manado · Electrical Engineering Department

Dr

About

8
Publications
1,636
Reads
How we measure 'reads'
A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text. Learn more
17
Citations
Introduction
Ferry Johnny Sangari currently works at the Electrical Engineering Department, Universitas Negeri Manado. Their current project is 'Analysis of Axial Turbine Pico-Hydro Electrical Power Plant in North Sulawesi Indonesia'.

Publications

Publications (8)
Article
Full-text available
This study presents analysis of pico-hydro electrical power plant in North Sulawesi, Indonesia. The objective of this study is to get a design of axial turbine pico-hydro electrical power plant. The method used the study of literature, survey the construction site of the power plant and the characteristics of the location being a place of study, an...
Article
Full-text available
The paper presents validation of the numerical program that computes the distribution of marine current velocities in the Bangka strait and the kinetic energy potential in the form the distributions of available power per area in the Bangka strait. The numerical program used the RANS model where the pressure distribution in the vertical assumed to...
Conference Paper
Full-text available
The paper presents validation of the numerical program that computes the distribution of marine current velocities in the Bangka strait and the kinetic energy potential in the form the distributions of available power per area in the Bangka strait. The numerical program used the RANS model where the pressure distribution in the vertical assumed to...
Article
Full-text available
The electricity supply in North Sulawesi is still very limited so ubiquitous electric current outage. It makes rural communities have problems in life because most uses electrical energy. One of the solutions is a model of power plants to supply electricity in Tateli village, Minahasa, North Sulawesi, Indonesia. The objective of this research is to...
Article
Full-text available
One of equipment as prime movers in the marine current power plant is turbine. Marine current turbines require a data of marine currents velocity in its design. The objective of this study was to get the velocities distribution of marine currents in the Bangka strait. The method used survey, observation, and measurement in the Bangka strait. The da...
Article
Full-text available
span id="m_3697106264798858821m_4578206257817085836gmail-result_box" class="m_3697106264798858821m_4578206257817085836gmail-" lang="en"> One of marine current power plant equipment is turbine. In the design of marine current turbines required variables such as velocity and kinetic energy. This paper presents numerical study on a numerical design o...
Conference Paper
Full-text available
One of equipment as prime movers in the marine current power plant is turbine. Marine current turbines require a data of marine currents velocity in its design. The objective of this study was to get the velocities distribution of marine currents in the Bangka strait. The method used survey, observation, and measurement in the Bangka strait. The da...
Conference Paper
Full-text available
Study on marine current with approach of a numerical model for marine current power plant (PLTAL) in the Bangka strait North Sulawesi has been investigated. Construction of power plant is needed to overcome the shortage of electricity in North Sulawesi. Before building the electrical energy it would require a feasibility study which aim to ensure t...