Figure 2 - uploaded by Atilgan Altinkok
Content may be subject to copyright.
2. Turkey sunshine duration distribution map (MGM, n.d.).

2. Turkey sunshine duration distribution map (MGM, n.d.).

Source publication
Article
Full-text available
In this study, it is aimed to develop a suitable photovoltaic system design for the needs of Giresun University Faculty of Engineering. After the determination of the number of panels required for the photovoltaic system by mathematical equations, a 3-dimensional layout planning was made on the roofs of the Engineering building using the PVSol prog...

Citations

... While creating a photovoltaic system, there are some limitations and criterions that must be considered. These may vary according to the specifications of the selected system components such as panels and inverters [20]. The PV systems in the study were designed considering the criterions. ...
Article
Full-text available
The effective planning of urban areas is important in terms of improving both the urban density and the traffic problem. Parking lots should be arranged to manage spaces and traffic at the points where the population is highly dense. On the other hand, installing rooftop solar energy plants over parking lots are highly advantageous in terms of renewable energy production. During the design process of such urban power plants, the area-energy optimization and the shading caused by surrounding buildings have direct effect on overall performance. In this study, firstly a parking lot was designed on an empty parcel within the urban area of İzmir province, with the capacity of 1.704 vehicles, 64 motorcycles and 64 electric vehicle charging stations. In addition, a solar power plant was planned over the parking lot canopies, then a power system was designed by selecting the proper photovoltaic panels and inverters. On the parametric simulation software, which was used to determine the system performance, the solar radiation and shadow simulations on the designed parking lot were run. After that, the electricity generation performances were investigated and comparisons between the parking lot parcels and the selected dates were made. In the conclusion, it was found that 7.006 photovoltaic panels placed over the canopies with an area of 24.995 m2 are able to generate 8.084 MWh/year electricity.