Figure 1 - available via license: Creative Commons Attribution 4.0 International
Content may be subject to copyright.
Source publication
The wind generation causes some troubles on the stability of power network. Observing the critical clearing time of circuit breaker with existence of wind generation, one conclusion about the degrading of stability will be drawn. The location and the penetration level of this generation are also considered in this paper. The 14 buses IEEE network i...
Context in source publication
Similar publications
The major problems associated with distribution systems are voltage control and power losses. The placement of reactive power compensator (RPC) is one of the methods used in distribution systems to solve these problems. Minimization of power loss requires that RPC should be appropriately located. Inherent structural characteristic theory (ISCT) whi...