Contexts in source publication

Context 1
... classified by a decision tree into insecure (at least one of the 2 lines overloaded) and secure situations. The outages on 150.10 and 150.9 are called parallel and the 3 remaining outages other. The decision tree (6728 objects in the Learning Set, 1121 in the Pruning Set and 1121 in the Test Set, the er- ror probability is 4.728%) represented on Fig. 5 confirms the experience of the power system engineers. The tree is read top-down, and each decision node is represented by a box showing in its upper part the percentage of secure and insecure scenarios in the training and in its lower part the test set error rate. The tree of Fig. 5 shows that a conges- tion on one of those 2 lines ...
Context 2
... the Test Set, the er- ror probability is 4.728%) represented on Fig. 5 confirms the experience of the power system engineers. The tree is read top-down, and each decision node is represented by a box showing in its upper part the percentage of secure and insecure scenarios in the training and in its lower part the test set error rate. The tree of Fig. 5 shows that a conges- tion on one of those 2 lines can be fixed either by stopping a generating unit at sub-station E or by switching on the parallel line or by decreasing the generation around sub- station R. We mention the fact that a reinforcement has already been identified to fix the problem, but it was not considered in this ...

Similar publications

Article
Full-text available
In 2020, the first quick commerce businesses in grocery retail emerged in the European market. Customers can order online and receive their groceries within 15 min in the best case. The ability to provide short lead times is, therefore, essential. However, the ambitious service promises of quick deliveries further complicate order fulfillment, and...
Article
Full-text available
Optimal signal coverage has always been a fundamental issue for cellular network operators. Other issues related to capacity, quality of service and cost efficiency are also rapidly gaining prominence. In order to determine signal coverage, network engineers usually rely mainly on two dimensional (2D) terrain maps and rather simple empirical propag...
Preprint
Full-text available
p>This paper proposes a comprehensive optimization approach based on linear programming (LP) for the installation of multiple hybrid power plants (HPPs) in non-interconnected islands. Contrary to the current state-of-the-art solutions, the proposed approach optimizes simultaneously the size, location, and technology of each HPP in order to minimize...