Figure 5 - uploaded by Nabin Kharal
Content may be subject to copyright.
Overview map with all field methods. 

Overview map with all field methods. 

Contexts in source publication

Context 1
... map in Figure 5 gives an overview of which method has been done where in the study are. Observation wells are shown as well. ...
Context 2
... 10 is an example on how an interpretation can be based on structures. We measured a 180 meters long profile along the road to the river passing beside the water works ( Fig 5). The last ~50 meters of the profile are parallel to the ERT and Seismic profiles. ...
Context 3
... locations were chosen for the Mariotte infiltration test. Location 1 is the end of the seismic line, whereas location 2 is roughly the end of the ERT line (Fig. ...
Context 4
... slug test is performed through various ways, in this case of study the Hvorlev's Method was used where water is added through a tube and measure amount of water decrease or water that get percolated inside the soil (Fig. 15). The following task were carried during this test: 1) Measure depth of water table before test 2) Fill a given volume of water in the well and measure h at increasing times (e.g. every 5 cm), h0 is the head value at time t = ...
Context 5
... Values for(h-H)/(h0-H) are plotted along a logarithmic y-axis versus time along the linear x- axis as shown in Figure 15. ) T0 is found from the time of the cross point of the slope and a value 0.37 on the y-axis 5) K is calculated from (several exist): ...

Similar publications

Technical Report
Full-text available
Chandak –Aulaghat Watershed (CAW) is located 20 km North West of Pithoragarh city, Bind block, Pithoragarh district, Uttarakhand, India and covers approximately 24.19 sq.km area. It is a combination of two sub-watersheds which in its upper reaches forms the greater Gorang valley or Gorang-Desh while at lower reaches it forms the Aulaghat watershed,...
Article
Full-text available
two roadways in adjacent working face of Baode Mine may have the risk of water inrush at the same time, so it is necessary to construct long borehole to cover the roadway excavation. On the basis of the hydrogeological conditions of the mine, the safe water insulation thickness and water inrush coefficient of coal seam No .8 are calculated. The res...