Figure 17- - uploaded by David Bruton
Content may be subject to copyright.
Lifting frame with guides 

Lifting frame with guides 

Source publication
Conference Paper
Full-text available
A 16-inch gas export pipeline, installed in 2007, transports gas over 150 km from an FPSO to a platform in shallow water. The pipeline incorporates an in-line tee assembly (ITA) approximately 6 km from the FPSO for the future tie-in of a gas export pipeline from an adjacent field. The ITA is supported by a fixed mudmat foundation and is free to mov...