Example of a manufacturing inaccuracy on the Charging Rail (CR): the vertical distance between the different Conductor Rail Channels (CRCs) is not the same

Example of a manufacturing inaccuracy on the Charging Rail (CR): the vertical distance between the different Conductor Rail Channels (CRCs) is not the same

Source publication
Preprint
Full-text available
System Engineering (SE) methods and principles are nowadays widely adopted in the product development processes, especially in the industrial sector, where saving production time and costs are primary goals. This work describes an application of a particular SE methodology, the V-model based design, in which the system development lifecycle is divi...

Context in source publication

Context 1
... situation is due to the presence of imperfections on the CR, which, not being designed to be accurate along its entire 27 km length in the LHC tunnel, make the relative distance between the CRCs not always equal to the nominal one. An example is shown in the following Figure 3. ...