Cumulative NPV value of the process (see online version for colours)

Cumulative NPV value of the process (see online version for colours)

Source publication
Article
Full-text available
This study aims to perform energy, exergy, economic and emission-removal performance analysis of wet flue gas desulphurisation (FGD) systems in a coal-fired power plant with 660-MW capacity. The outcomes of the analysis reveal that energy and exergy performances are negatively correlated with flue gas temperature enhancement. The energy and exergy...

Context in source publication

Context 1
... the other hand, if NPV=0, the investment would neither gain nor lose value for the investor ( Punyawadee et al., 2008;Almaktar et al., 2016). The cumulative NPV value of the process with respect to time is presented in Figure 4. According to obtained results, NPV has been calculated as $605,500 the process is acceptable economically besides provide profit by means of gypsum trade. ...

Similar publications

Article
Full-text available
The ASPEN Plus V8.4 was used to model air- and oxy-combustion plants and determine the thermal efficiency penalty associated with retrofits, which was then compared to the thermal efficiency penalty established in the literature. Additionally, this paper investigates the feasibility of offsetting the efficiency penalty through the use of reaction h...