Table 4 - uploaded by Zhen Song
Content may be subject to copyright.
Source publication
In metropolitan areas populated with commercial buildings, electric power supply is stringent especially during business hours. Demand Side Management (DSM) using battery is a promising solution to mitigate peak demands, however long payback time creates barriers for large scale adoption. In this paper, we made a case study on battery integration t...
Contexts in source publication
Context 1
... small and medium building load samples are plotted in Fig. 12. We run the battery integration algorithm proposed in this paper and the results are tabulated in Table 4. The table shows the bat- tery capacity, inverter size, annual saving, battery degradation, payback time and salvage value for the battery at the payback time. ...
Context 2
... small and medium building load samples are plotted in Fig. 12. We run the battery integration algorithm proposed in this paper and the results are tabulated in Table 4. The table shows the bat- tery capacity, inverter size, annual saving, battery degradation, payback time and salvage value for the battery at the payback time. ...