Fig 4 - available via license: Creative Commons Attribution 4.0 International
Content may be subject to copyright.
Source publication
An engineering geological mapping was carried out at the construction site of the Tunnel 10 of Jakarta Bandung High-Speed Railway to obtain data and information of the engineering geological conditions, particularly the rock masses. This research aims to determine the rock mass classes at the tunnel construction site and recommend the tunnel suppor...
Similar publications
This paper presents the investigation of surface geology and subsurface engineering geology to analyze the excavation method and stand-up time of the DK99-DK100 Jakarta-Bandung high-speed railway Tunnel, Indonesia. Rock mass quality, tunnel excavation method, and stand-up time determined using Geological Strength Index (GSI), Basic Quality (BQ) sys...