Scheduling of construction projects which have multiple units, wherein activities repeat from unit to another, always represent a major challenge to project managers. These projects require schedules that ensure the uninterrupted usage of resources from one unit to another and maintaining logic constraints at the same time. Such projects occupy lar...

Context in source publication

Context 1
... variable may take any value between 1 and 5; with any number of those represent specific construction method. Accordingly, in GAs, the solution of the problem is represented in the form of a chromosome (string) consists of elements with a whole length equal to the number of activities. Each gene contains a construction method index as shown in Fig. 4. Each chromosome, as such, represents a feasible solution for the problem at hand. ...

Similar publications

Conference Paper
Full-text available
Building production process is a multi-disciplinary and multi-phased activity. Various factors increased the complexity of building production process and consequently the number of participants taking place in the process. Co-ordination and integration of the production process became more important in the fragmented structure of construction indu...
Article
Full-text available
The study presents a framework through which risk and uncertainties in Nigeria highway projects can be appraised using the analytical hierarchical process model. Pairwise comparison matrix was performed on eleven (11) risk and uncertainty factors that affect highway project performance through a questionnaire survey conducted among two hundred and...
Article
Full-text available
Traditionally, critical path method (CPM) is widely used with manual resource assignment for planning and scheduling of the construction projects. This is predominant in the construction industry of Bangladesh. Therefore, the industry often faces challenges to complete construction projects in minimum possible time with optimum use of resources. Al...
Article
Full-text available
Field productivity of building trades is the focus of prefabricated construction practitioners as a path to greater profitability and competitiveness in the marketplace. Construction firms are struggling to meet the demand of the marketplace due to shortages of skilled workers and flat to declining productivity. Human capital and productivity chall...
Article
Full-text available
This paper reports an experimental investigation carried out to establish a mathematical relationship between aggregate crushing value (ACV) and ten percent fines aggregate crushing value (TFV) for some aggregates in Nigeria. Such a mathematical relationship, usually established through regression modelling on data collected, is useful in saving ti...

Citations

Article
Full-text available
Project scheduling provides a good insight for the manager to complete the project on time. Project scheduling gives complete timing analysis of activities involved and identifies the critical ones. Critical Path Method (CPM) is the most widely used in planning and scheduling method for traditional (non-repetitive) projects to determine the critical path which determines the minimum completion time of a project.Some construction projects consist of several similar or identical units, which are called repetitive projects. LOB technique has some drawbacks such inability to generate a clear critical path of the project schedule and calculating the total float because it is a graphical technique. LOB used for scheduling repetitive typical projects because this technique considered work continuity and resource availability constraints to avoid unnecessary crew idle time.Some of the previous studies have been made to combine the benefits of CPM and LOB techniques in planning and scheduling repetitive construction projects, so, there is a model that was developed for this objective (schedule repetitive projects in an easy non-graphical manner). But, in real life, more conditions contributed to varying activity duration. Thus, the duration of project activities contains some sort of uncertainty affecting the estimating of project duration. Previous studies used fuzzy set theory instead of probability theory for quantifying the uncertainty associated with the duration of project activities.In this paper, a developed integrated model of CPM and LOB with fuzzy time data for scheduling repetitive projects is presented. The developed model provides a new technique to schedule repetitive projects with fuzzy time data in an easy non-graphical manner.