Block diagram of a preliminary survey

Block diagram of a preliminary survey

Source publication
Article
Full-text available
In this paper the issues of volumetric and calendar scheduling of repair and construction works were investigated. This scheduling is based on a system approach to the surveying of real estate. Depending on the physical depreciation on stage volumetric scheduling there was held the analysis of models and costs of repair and construction works. Ther...

Context in source publication

Context 1
... enlarged block diagram of a preliminary survey (rapid survey) is shown in Fig. 1. At the stage of preliminary survey of the property the possible investor needs to determine the cost of repair work with aim to assess the economic efficiency of the property. Estimation of costs at this stage may be approximate but it must be done quickly enough, it should be rapid assessment, and at the same time should have ...

Citations

... The implementation of municipal programs in the housing and utilities sector and in the urban environment is currently one of the most discussed issues among socially significant ones [8][9][10]. ...
Article
Full-text available
The paper includes the consideration of existing methods for implementing urban programs in the housing and utilities sector and the urban environment; as a result of the analysis, it was found that they are unsystematic by nature, do not have criteria for evaluating the effectiveness and even the minimum parameters of the required works. In this regard, the paper defines innovative ways of implementing municipal programs in the housing and utilities sector and the urban environment, which take into account the peculiarities of the municipal programs implementation. The method proposed in the paper is based on an innovative approach to determining the targets for ensuring the preservation of the housing stock and improving the quality and comfort of the urban environment in the municipal formation territory. As the main tool, the method of the prospect planning and the selection of functional strategies has been used. In the paper, approaches to the development of innovative methods for planning urban programs in the housing and utilities sector and the urban environment are formed; the selection criteria for the taken organizational and technological decisions of the repair and construction industry in the housing and utilities sector and the urban environment are determined; possible combinations of mastering the types of work for synchronizing the processes of yard landscaping and the overhaul of apartment buildings are established.
Article
Every project management will strive to ensure that one project can operate without any problems. Unfortunately, some projects are still abandoned due to certain reasons. If the abandonment occurs, the requirement to submit an abandonment plan is stipulated on the Environmental Impact Assessment (EIA) Guideline in Malaysia, 2016. Unfortunately, still lack of resources on pre-project abandonment guidelines which will lead to poor project abandonment report preparation and assessment. Thus, this study aims to determine crucial indicators for assessing the pre-abandoned project, proposing a framework of Malaysia Guidelines for Pre- Project Abandonment Plan (PAP), and validating the draft of the Malaysia Guidelines Framework for PAP. The collected data was compiled from various sources, including document review, survey, and Delphi Method (focus group discussion). The survey conducted proved that the most crucial indicators for the assessment of pre-abandoned project were (i) waste management, (ii) allocation of environmental budgeting, (iii) inventory of scheduled waste, (iv) slurry management, (v) method of demolished, (vi) safety and health of workers, (vii)drainage management system, (viii) site management, (ix) type of treatment plant, and (x) site housekeeping. This framework will assist both report preparer and policymakers on project abandonment report preparation and evaluation, respectively. The development of this framework was strengthened by comprising related legislations, and each indicator synchronized towards Sustainable Development Goal (SDG) 2030.