-Block Diagram of Base Station Equipment.

-Block Diagram of Base Station Equipment.

Source publication
Article
Full-text available
This research is on the analysis and modelling of power consumption in a base transceiver station. For the purpose of this research, two base transceiver stations in Benin (BEN) were visited and data were collected and analysed: Ugbor station referred to as BEN035 (site A) and Benson Idahosa University referred to as BEN198 (site B). Analysis was m...

Contexts in source publication

Context 1
... Figure 1, there are several power consuming equipment. Some equipment are used per sector such as the digital signal processing (DSP) which is responsible for system processing and coding, the power amplifier, the transceiver which is responsible for generating the signal and also receiving signals to the mobile station and the rectifier as shown in Figure 2.The power consumption of such equipment should be multiplied by the number of sectors when determining the power consumption of BTSs. Within these equipment the transceiver and the power amplifier are one per transmitting antenna. ...
Context 2
... Figure 1, there are several power consuming equipment. Some equipment are used per sector such as the digital signal processing (DSP) which is responsible for system processing and coding, the power amplifier, the transceiver which is responsible for generating the signal and also receiving signals to the mobile station and the rectifier as shown in Figure 2.The power consumption of such equipment should be multiplied by the number of sectors when determining the power consumption of BTSs. Within these equipment the transceiver and the power amplifier are one per transmitting antenna. ...

Similar publications

Article
Full-text available
A decline of production level in December 2018 requires an evaluation. Productivity measurement is required to calculate performance. The purpose of this study is to measure the level of productivity using the objective matrix (omax). There were four steps to perform Omax. First step is select performance criteria, second is establish performance s...
Article
Full-text available
Since the current manufacturing paradigm cannot get out of the mass production and mass consumption in correspondence with diversification and expansion of customer needs, today's manufacturing industry causes many problems such as sustainability issues typified by SDGs. The conventional design theory seems not to be sufficient for these problems b...